Thank you for visiting nature.com. You are using a browser version with limited support for CSS. To obtain the best experience, we recommend you use a more up to date browser (or turn off compatibility mode in Internet Explorer). In the meantime, to ensure continued support, we are displaying the site without styles and JavaScript.

  • View all journals
  • My Account Login
  • Explore content
  • About the journal
  • Publish with us
  • Sign up for alerts
  • Open access
  • Published: 16 October 2020

Understanding and managing new risks on the Nile with the Grand Ethiopian Renaissance Dam

  • Kevin G. Wheeler   ORCID: orcid.org/0000-0002-6553-6960 1 ,
  • Marc Jeuland   ORCID: orcid.org/0000-0001-8325-2622 2 ,
  • Jim W. Hall   ORCID: orcid.org/0000-0002-2024-9191 1 ,
  • Edith Zagona   ORCID: orcid.org/0000-0003-1333-0589 3 &
  • Dale Whittington   ORCID: orcid.org/0000-0002-6075-8812 4 , 5  

Nature Communications volume  11 , Article number:  5222 ( 2020 ) Cite this article

64k Accesses

86 Citations

349 Altmetric

Metrics details

  • Developing world
  • Water resources

When construction of the Grand Ethiopian Renaissance Dam (GERD) is completed, the Nile will have two of the world’s largest dams—the High Aswan Dam (HAD) and the GERD—in two different countries (Egypt and Ethiopia). There is not yet agreement on how these dams will operate to manage scarce water resources. We elucidate the potential risks and opportunities to Egypt, Sudan and Ethiopia by simulating the filling period of the reservoir; a new normal period after the reservoir fills; and a severe multi-year drought after the filling. Our analysis illustrates how during filling the HAD reservoir could fall to levels not seen in recent decades, although the risk of water shortage in Egypt is relatively low. The new normal will benefit Ethiopia and Sudan without significantly affecting water users in Egypt. Management of multi-year droughts will require careful coordination if risks of harmful impacts are to be minimized.

Similar content being viewed by others

aswan dam case study geography

When timing matters—misdesigned dam filling impacts hydropower sustainability

aswan dam case study geography

Collaborative management of the Grand Ethiopian Renaissance Dam increases economic benefits and resilience

aswan dam case study geography

Future large hydropower dams impact global freshwater megafauna

Introduction.

With the construction of the Grand Ethiopian Renaissance Dam (GERD) underway near the Ethiopia-Sudan border, a complex transboundary water situation is at hand: two large dams—the GERD and the High Aswan Dam (HAD)—in two countries, Ethiopia and Egypt, will coexist on a single river—the Nile—with no specific agreement yet on water sharing or reservoir operations. Both reservoirs can capture more than the average annual flow at their respective locations and can thus dramatically change the river’s flow. Although 85% of Nile waters originate in Ethiopia, nearly all consumptive use occurs downstream in Egypt and Sudan. Ethiopia’s main purpose for building the GERD is power generation rather than consumptive use, but the GERD operations will change downstream flow patterns significantly. This alteration is raising concern about risks of water shortage, which underlines the importance of reaching an agreement on the river’s management.

The hydrology of the Nile has been studied for decades 1 ; it is characterized by high inter-annual variability, stark differences in geography and climate, and flows modified by natural features and water infrastructure 2 (Fig.  1 ). Heavy rainfall over Ethiopia from June through September creates highly seasonal flows in the Blue Nile and Atbara tributaries. Rainfall over the equatorial lakes is greatest from March until May, and September until December. Combined with the buffering effect of the Sudd wetlands in South Sudan, this bimodal rainfall pattern results in relatively steady year-round flow in the White Nile. A naturalized hydrologic reconstruction at Aswan from 1900 to 2018 3 , 4 indicates a range of annual flows between 45.6 billion cubic meters (bcm) and 120 bcm with an average annual flow of 86.5 bcm (Fig.  2 ). The Blue Nile contributes ~55% of this flow, with the remaining 32% and 13% from the White Nile and Atbara, respectively.

figure 1

Active reservoir storage volumes are shown for each location.

figure 2

Horizontal bars show 10- and 20-year sequences used in simulations.

The Nile has been used since antiquity for domestic use, irrigation, and navigation, but large-scale planning and development only began in the late 19th century as British colonial officials proposed a vision of basin-wide management 5 . Ethiopia, however, remained independent and was not party to these aspirations 6 . As countries gained independence, Egypt and Sudan asserted claims to the Nile in their 1959 “Agreement for the Full Utilization of Nile Waters”. Not being signatories, Ethiopia and other upstream states do not recognize this agreement 7 .

The 1959 Agreement initiated the construction of the HAD with a total storage volume of 162 bcm. Since its construction, sediment accumulation has reduced the capacity by ~7 bcm, with 46% deposited in the live storage. The primary purpose of the HAD has been to meet Egypt’s agricultural, municipal, and industrial water requirements through regular annual releases of 55.5 bcm. In practice, releases have often exceeded this amount. Based on operational policies, releases may also be reduced below 55.5 bcm under an existing Drought Management Policy (DMP) if storage falls below 60 bcm (159.4 m above sea level or masl) 8 . According to the 1959 Agreement, 18.5 bcm would be accessible each year to meet Sudanese demands, and 10 bcm was allotted for evaporation loss from the HAD Reservoir.

Ethiopia has long had development ambitions of its own. In 1964, a study of development opportunities on the Nile within Ethiopia highlighted the potential for hydropower generation and irrigation 9 . Following the completion of several comparatively smaller hydropower structures in the Nile tributaries 10 , Ethiopia embarked upon the construction of the GERD on the Blue Nile in 2011. With an installed capacity of 5150 MW, the dam is expected to annually generate around 16 TWh of energy 11 . When completed and operational, the GERD will be the largest hydroelectric power generation facility in Africa and the fifth largest in the world. The GERD Reservoir will have a total storage of 74 bcm, 59 bcm of it active, or nearly 1.2 times the average annual flow of the Blue Nile at the dam site. Additional descriptions of the GERD and the HAD—as well as other important Eastern Nile infrastructures—are included in the  Supplementary Information .

The GERD project has strained relations between the Nile countries. Downstream countries worry about management of the initial period of reservoir filling and have also expressed concern about long-term operations. Both issues have been the subject of difficult, ongoing negotiations between Egypt, Ethiopia, and Sudan. Previous studies of the GERD and HAD operations have sought to identify tradeoffs between different riparian objectives, and to understand the risks and rewards of basin-wide cooperation 12 , 13 , 14 , 15 , 16 , 17 , 18 , 19 , 20 , 21 , 22 , 23 . These efforts provide important insights that will inform multilateral agreements and create a structure for addressing the significantly different interests in the basin. The aim of this paper is to draw attention to critical situations in which water risks may become severe and potentially socially disruptive.

As future flows in the Nile cannot be predicted with certainty, it has become common practice in reservoir simulation models to stress test systems using synthetic flows, sometimes incorporating future changes that are projected from climate models 24 . However, results from these simulation studies are often not considered sufficiently credible by decision makers 25 , 26 . Fortunately, the Nile has a long record of flows, and thus we are able to select historical flow sequences that are representative of low, average and high flows, in order to illustrate how the system would perform in these hydrological conditions (see Methods).

We organize our discussion into three stylized eras: (1) the period of filling of the GERD Reservoir; (2) a new normal that may begin after filling the reservoir is complete, but during which no severe multi-year drought occurs; and (3) a post-filling period that includes a severe multi-year drought. The periods are stylized because we cannot know with any certainty when they will begin or end, nor the specific hydrology that will accompany them. For each of the three eras, we consider reservoir operations from the perspectives of Egypt, Sudan, and Ethiopia, quantify the risks of water deficits, and discuss potential government and civil society perceptions of the risks that might arise.

Filling the GERD reservoir

The first ‘era’ is the period in which the reservoir will be filled. As of August 2020, construction of the GERD was over 70% percent complete, and Ethiopia has completed the first year filling of the reservoir by impounding 4.9 bcm. Throughout the filling process, a portion of the inflows into the GERD Reservoir will be retained, but the remainder will be released through turbines to generate hydropower or through spillway and bypass structures 27 . During this period, levels in the HAD Reservoir will decline relative to where they would have been without the GERD, and HAD hydropower production will correspondingly decrease due to reduced hydraulic head on the HAD turbines. Once the GERD reservoir is filled, the average release from the GERD will be equal to its average annual inflow (49 bcm), less annual evaporation losses of ~1.7 bcm, but the seasonal pattern of those releases will have changed.

The downstream consequences of filling the GERD are difficult to assess because they will depend on six key factors: (1) rainfall and flow in the basin during filling; (2) how quickly Ethiopia fills the GERD Reservoir; (3) how hydropower is generated at the GERD, which, in turn, depends on developments in the regional power grid; (4) how the GERD Reservoir filling influences Sudan’s withdrawals; (5) the initial storage level in the HAD Reservoir (as of 24 August 2020, it was nearly full at 178.4 masl); and (6) how the HAD is operated during the filling period. There is complexity in each of these factors, which is discussed further in the Methods and Supplementary Information . Here we present results for one filling proposal suggested in 2019 by the National Independent Scientific Research Group 28 with a set of assumptions about each of these elements, as detailed in the Methods section. Although more robust, dynamic filling policies, such as back-up releases from reservoirs during drought 20 or dynamic allocations based on economic benefits 29 , could further reduce risks and increase benefits, our aim is to elucidate the benefits and risks associated with filling, and then surmise the societal responses in Era 1 under a variety of conditions. We believe this filling proposal identified by the National Independent Scientific Research Group is sufficient for these purposes.

The results in Figs.  3 – 7 show: (1) what the storage of the HAD Reservoir would have been if the GERD had not been built; (2) the storage of the HAD Reservoir with the GERD in place; (3) the storage of the GERD Reservoir; and (4) when present, the magnitude of annual deficits in water availability in Egypt before and after the GERD, measured as shortfalls relative to a 55.5 bcm/year planned release.

figure 3

Storage volumes for the GERD and HAD are shown.

figure 4

Storage volumes for the GERD and HAD are shown above and shortages to Egyptian planned releases are shown below.

If the reservoir system is subject to the flows experienced in the 1955–1964 flow sequence of wet years, filling the GERD poses no problems for Egypt (Fig.  3 and Supplementary Table  4 ). The GERD Reservoir transitions from empty to full in five years and subsequently maintains a high, stable release pattern over the remainder of the simulation period. The pool elevation of the HAD never falls below 60 bcm and the storage of the HAD Reservoir recovers quickly. Egypt would not need to invoke the HAD Drought Management Policy (DMP) which would impose restrictions on releases. During these wet conditions, Egypt can release 55.5 bcm in every year of the simulation.

During the 1943–1952 sequence of average years, Egypt is also predicted to be able to deliver 55.5 bcm each year and would not need to invoke the HAD Drought Management Policy (DMP) (Fig.  4 and Supplementary Table  4 ). The GERD is filled in the 5th year and the HAD Reservoir thereafter experiences a gradual recovery, reaching 78 bcm in storage at the end of 10 years, substantially less than its initial storage of 146 bcm. The results of other similar near-average sequences are somewhat sensitive to the particular pattern in their flows, but the critically low HAD Reservoir level of 147 masl (34.7 bcm of storage) is never reached. An important factor in avoiding such critical levels is the high current storage in the HAD Reservoir. This makes it much less likely that storage behind the HAD will fall to levels that lead to significant restrictions in releases under the current DMP in Egypt. However, the HAD Reservoir is highly likely to fall to levels not seen in recent decades.

The effect of extremely dry conditions such as the 1978–1987 drought during Era 1 is shown in Fig.  5 and Supplementary Table  4 , for which the analysis is extended to show how this effect persists over a period of 20 years. Even without the GERD and with the HAD Reservoir starting full, HAD Reservoir storage would fall near to the minimum operation level of 147 masl. All three tiers of Egypt’s DMP would be invoked, resulting in a cumulative shortage of 35 bcm over the drought period. Figure  5 also demonstrates how such a long-term drought would have adverse consequences for both Egypt and Ethiopia while the GERD Reservoir is filling. In the first 6 years of the simulation, storage in the HAD Reservoir is predicted to fall to 47 bcm, whilst the GERD has only stored 46 bcm. Deficits in Egypt are predicted in year 5 (2 years earlier than without the GERD). The cumulative additional deficit to Egypt as a result of the GERD over the entire 20-year period is 46 bcm, so the 20-year cumulative deficit due to the combined drought and the GERD filling reaches 81 bcm.

The probability of a re-occurrence of a multi-year drought as severe as 1980s sequence during the GERD filling period is low, but such an event would have a greater impact today than it did then because withdrawals upstream of the HAD are higher today. Despite the low likelihood of such a sequence, the fact that multi-year droughts have occurred from time to time in the past means that careful and cooperative advanced planning is needed to prepare for the possibility that large and persistent deficits could occur.

The new normal after the filling the GERD reservoir

The second ‘era’ begins once the GERD Reservoir reaches its full supply level (FSL) and normal operations begin. At that point, the average annual volume entering the reservoir, less evaporation losses, will flow downstream through the GERD’s turbines whenever possible—i.e. during normal, wet conditions, and minor droughts. The variability of flows downstream of the GERD will decrease significantly, as the intra-annual timing of releases is modified to achieve power generation goals at the GERD (whether for baseload or peak power production) and capturing peak flows in the Blue Nile. Net evaporation losses from the GERD Reservoir will average ~1.7 bcm per year and will not fluctuate much from year to year. These losses from the GERD Reservoir will be partially offset by 1.1 bcm of reduced evaporation in the HAD Reservoir when the system reaches a new equilibrium (see Supplementary Note  4 for further discussion of evaporation losses).

To illustrate conditions in the new normal era, we start our simulation with both reservoirs at normal operating conditions (total storage of 79.6 bcm including 7 bcm of sediment in the HAD Reservoir [165.5 masl]), and total storage in the GERD of 70.4 bcm [637.9 masl]). As discussed in the Methods, we assume that the GERD is operated to produce a baseload of 1600 MW whenever possible 21 , and that target diversions remain similar to those of the filling era, except for modest increases in Ethiopia 10 . We select the 20-year historical sequence from 1934 to 1953 to simulate outcomes that we consider to be broadly representative of a typical sequence of low and high years, but without extreme multi-year drought conditions.

As shown (Fig.  6 and Supplementary Table  5 ), for an average 20-year sequence that is broadly representative of typical low and high years (1934–1953), the GERD is able to maintain steady releases over time, and storage never falls to the minimum operating level of 18.4 bcm (595 masl). Moreover, the GERD buffers the variability in HAD Reservoir storage relative to the case without the GERD, resulting in lower peaks and periods of higher minimum storage. The HAD Reservoir remains above 60 bcm of storage, and Egypt’s DMP is never deployed.

figure 6

The simulation also demonstrates that storage in the HAD Reservoir is typically lower with the GERD than without it. This should be expected due to the evaporative losses from the GERD and additional evaporation from Sudanese reservoirs, which will likely be operated at higher levels because the Nile flows will be less variable. Both factors will reduce inflows to the HAD Reservoir. While lower levels in the HAD Reservoir may cause people in Egypt to feel that their water supply is less secure, under normal or wet flow conditions the increased predictability of inflows and the continuation of current management approaches at the HAD should enable Egypt to release 55.5 bcm annually almost all the time even without coordinated operation with the GERD.

Moreover, Sudan will clearly be better off in Era 2 because GERD operations will smooth Blue Nile flows, eliminating flood losses, increasing hydropower generation, decreasing sediment load to the reservoirs and canals, and, most importantly, increasing water for summer irrigation in the Gezira Scheme and other irrigated areas along the Blue Nile 30 , 31 .

The consequences of a future severe multi-year drought

The third ‘era’ will begin when a sequence of very low flows occurs in the Nile Basin 32 . The probability, severity, and timing of specific sequences of low flows are unknowable, especially as climate change unfolds. For example, a severe multi-year drought might begin during or immediately after filling the GERD Reservoir, so it cannot be assumed that Era 2 will precede Era 3. To illustrate the possible effects of such a multi-year drought and the countries’ attempts to manage it, we simulate the consequences of the 1972–1987 series of low flows. We first consider how water stored in the HAD and GERD Reservoirs could be used to reduce deficits arising from low water availability. Then we discuss water supplies during a post-drought recovery phase.

The use of water stored in the HAD Reservoir and the GERD Reservoir as a drought begins

At the beginning of a multi-year drought, the Eastern Nile riparians should have water stored in both the GERD and HAD Reservoirs, which can be used to mitigate shortages. During a drought, the GERD Reservoir would be drawn down in an effort to continue generating hydropower. Any water released in excess of that which is required for power generation would come at a cost to Ethiopia by foregoing the generation of power in the future. Ethiopia could release water downstream until the GERD Reservoir reached the minimum operating level of 595 masl (or 565 masl if only low-level turbines remained in use).

The most basic strategy to manage a drought would be to guarantee a minimum annual release from the GERD, or alternatively, a firm power production contract from the GERD. In our analysis, we maintain our Era 2 assumption that Ethiopia would continue to operate the GERD to deliver 1600 MW of power whenever possible, Sudan would operate reservoirs to meet its own irrigation and energy generation needs, and Egypt would invoke its current DMP as necessary. As the multi-year drought of the 1970s and 1980s begins, storage in both the HAD and GERD Reservoirs falls quickly (Fig.  7 and Supplementary Table  6 ). During the drought onset, storage in the HAD Reservoir, however, remains higher than it would have been if the GERD had not been built, causing decreased water deficits to Egypt and increased water availability. Because the GERD releases (for hydropower production) help to boost Nile flows, Egypt experiences four years of reduced shortages until both reservoirs are near their minimum operating level. Up until the peak of the drought (1987), the GERD has decreased the cumulative shortages to Egypt from 42 bcm to 27 bcm, reducing shortages by 15 bcm. As shown in Fig.  7 , however, the storage in both the HAD Reservoir and GERD Reservoir can become nearly or fully depleted.

figure 7

Storage volumes for the GERD and HAD are shown above and shortages to Egyptian planned releases are shown below.

The refilling of the HAD Reservoir and the GERD Reservoir when the drought ends

At some point, the multi-year drought will end, and a series of average and high floods will arrive. The questions of how fast and in what sequence the HAD Reservoir and the GERD Reservoir should be refilled will be critical and contentious. This case is similar to the initial period of filling the GERD Reservoir but will be much harder to manage because both reservoirs will now be empty or nearly empty. If the GERD Reservoir and HAD Reservoir were located in one country, reservoir managers would probably fill the GERD Reservoir first and the HAD Reservoir later subject to meeting most or all downstream water needs 33 . In this transboundary context, however, filling the GERD reservoir first is likely to cause great concern, unless firm guarantees are in place that water will be released to meet the basic requirements of the downstream riparians.

Figure  7 above (and Supplementary Table  6 ) presents a drought recovery using the 1988–2001 flow series and illustrates the challenge of coming out of such a multi-year drought. We assume that the objective of GERD operators would continue to be the generation of 1600 MW whenever possible. This is a preferred situation for Egypt and Sudan because more water would immediately be released downstream. In this case, the GERD Reservoir is unable to refill quickly and continues to operate close to its minimum operation level (595 masl) while the storage in the HAD Reservoir begins to recover. The GERD Reservoir only begins to refill in years when its inflows reach levels that are high enough to allow generation of the 1600 MW energy target despite the reduced hydraulic head behind the dam.

During this recovery period, an additional 21 bcm of cumulative shortages occur in Egypt when the GERD is in place, compared to 14 bcm of cumulative shortage that would have occurred over the same period without the GERD. The results again demonstrate the challenge of simultaneous refilling of these two large reservoirs. Egypt would be adversely affected during this recovery period, but a decision by Ethiopia to promptly generate electricity would mitigate Egypt’s losses. In contrast, a decision by Ethiopia to prioritize refilling the GERD Reservoir by reducing power production would exacerbate Egypt’s losses.

Despite the fact that the GERD Reservoir is likely to fill (i.e. Era 1) with minimal reductions in water released for Egypt as determined by the HAD DMP, the results of the simulations in Figs.  3 through Fig. 5 help to explain why perceptions of upstream and downstream riparians about the risks of filling the GERD Reservoir have diverged. Falling water levels in the HAD Reservoir could be perceived very negatively, and these perceptions might be especially difficult to manage in Egypt where they could be incorrectly interpreted as stemming solely from the filling of the GERD. For example, the GERD may continue to release an agreed annual volume, but droughts may result in below-average contributions from tributaries downstream of the GERD. Indeed, as inflows to the HAD Reservoir are temporarily reduced, falling HAD Reservoir levels will be visible in photographs and satellite imagery. It may be difficult for civil society and governments to fully understand the reasons why these inflows to the HAD Reservoir are so low. It may be known, for example, that rains in Ethiopia are below normal, but mistrust may spread concerning the filling of the GERD and whether agreed upon filling rules are being followed. Similarly, it will be difficult to discern precisely how much water is being withdrawn for irrigation and other upstream uses in Sudan and Ethiopia. Egyptians may assume that this large project has resulted in a loss of water security. Such concerns might spread, and could possibly be exaggerated or distorted by opinions aired through traditional and new media platforms 34 , 35 .

We can also speculate that after the construction and filling of the GERD is complete, a new normal period (i.e. Era 2) with a relatively average sequence of Nile flows and without a long multi-year drought could lead to complacency, with neutral to positive outcomes for each riparian. Even in the absence of coordination, Ethiopia will be able to operate the GERD to maximize hydropower generation. As long as the inflows remain somewhere near the long-term average, Egypt will not experience significant deficits, and may even benefit from the buffering effects of the GERD. In this era, the construction of the GERD will be seen as a win-win result for the Nile riparians, which has been Ethiopia’s stated position. Egypt may become concerned about lower storage levels in the HAD Reservoir, but would likely become less anxious over time. Sudan will receive multiple benefits due to the upstream flow regulation.

During this Era 2 of the new normal , the benefits that Sudan and Ethiopia will receive from the construction of the GERD will far exceed any small losses - chiefly in reduced hydropower production from the HAD – experienced by Egypt 16 , 36 . However, this new normal may reduce the perceived need to coordinate the operations of the HAD and the GERD. This would be unfortunate because the hydrology of the Nile dictates that the riparians must plan carefully for severe multi-year drought.

Our results also demonstrate that a multi-year drought (i.e. Era 3) could have severe impacts that induce difficult water allocation choices. Policy makers already know that behavioral responses to a multi-year drought will be negative and difficult to manage, with challenges in each country exacerbated by the very visual signal of dropping reservoir levels. Even with clearly understood facts, e.g., about reduced rainfall upstream, it will be difficult for Egyptian citizens to understand the full set of reasons for low levels in the HAD Reservoir.

One of the key findings of behavioral economics is that people feel losses much more acutely than gains of comparable size 37 . Moreover, people feel water losses more acutely than they do losses of almost any other commodity 38 . In severe drought conditions, feelings about the loss of water security may become especially acute. We speculate that this could lead to a water panic among irrigators and civil society in Egypt. Fears of a loss of access to water could spread rapidly through the population—increasingly via social media. An analogy may be drawn between a water panic and a financial panic, in which hoarding of seemingly scarce resources (e.g. cash, fuel, food supplies) ensues. Both a water panic and a financial panic are difficult to predict, can spread rapidly, and will be hard to manage without access to data and reassurance by trusted leaders. In a water panic, the state will have to convince the public that essential water supplies are secure.

This reinforces the need for cooperation and agreement, together with a basin-wide, data-sharing platform for coordinated planning, transparent information exchange, and building trust. Cooperative Eastern Nile preparation of contingency plans is best undertaken before these plans are needed, and not in response to a crisis. Drought management plans need to have widespread support before they are implemented so that stakeholders know what will happen in an emergency. During the implementation of such measures, policy makers will need to actively engage with the press and social media to correct misperceptions as they arise and reassure the public that the management plan will be effective and fair. Water uses with a low economic value may be targeted for reductions in supply, and may need to be compensated for their financial losses. The political costs of such curtailments may be significant, but so will be the costs of inaction.

Some economists have argued that Egypt can manage significant reductions in releases from the HAD Reservoir without large reductions in economic output 19 . This argument holds that targeted reductions in water supply to low-value water-intensive crops would allow Egypt to pull through a multi-year drought with minimal economic consequences. But just as macroeconomic models are not able to account for the human emotions underpinning a financial panic, these economic models do not account for the possibility of a water panic. Feelings may run high if people feel that they are unjustly denied access to water or if the burden falls disproportionately on poor, vulnerable farmers.

In summary, sharing the scarce waters of the Nile Basin involves balancing competing objectives under conditions of uncertainty. In this paper, we synthesized modeling results into narratives based on three eras that help to explain the implications of the GERD on the Nile system. We believe that this framing will help both technical and nontechnical audiences better understand the dynamic situation in this international river basin, and deepen their collective understanding about several key behavioral features of this complex system. Moreover, we use these narratives to highlight the need for careful management of the built infrastructure in the Nile, to consider how potential outcomes might be perceived by civil society and decision-makers, and to identify the circumstances under which these perceptions of risk could lead to a water panic. The analysis serves to highlight the challenges faced in the ongoing and future negotiations among Eastern Nile riparians. Recognizing the origins and implications of these challenges may assist movement towards a resolution.

In providing such reflections, we have sought to provide an accessible description of the context of the Nile Basin system, and to show how completion of the GERD will influence its hydrological behavior. Our simulations illustrate how the construction of the GERD will affect the three Eastern Nile riparians and help to highlight several critical situations that need to be considered in negotiations related to GERD and HAD operations. The first critical situation is the imminent period of filling of the GERD Reservoir (Era 1). We recognize that the three countries have been actively engaged in negotiations to reach a resolution over this pressing issue. The necessary management decisions relate to whether there will be agreed releases from the GERD and whether a more sophisticated strategy should be adopted to manage an extraordinary, yet very plausible, severe drought during the initial filling.

Once the GERD Reservoir is full, in a sequence of years of average or above average Nile flows (Era 2), Egypt is unlikely to need to reduce water releases from the HAD, provided that upstream irrigation withdrawals have not significantly increased. However, the HAD Reservoir will usually operate at lower levels than at present. Sudan will benefit from steadier Nile flows, including increased summer flows and reduced floods and sedimentation. Ethiopia will benefit from the generation of 16 TWh per year of hydropower.

However, a severe multi-year drought (Era 3) is inevitable at some point in the future. This will be a critical event in terms of managing water risks in the Eastern Nile. In advance of such a drought, a comprehensive basin-wide management plan needs to be agreed upon, including a management policy for the GERD. Such agreements should specify how the reduced flow of the Nile will be shared when storage is depleted in both reservoirs, and will need to balance power generation and consumptive use. At least as challenging will be the issue of how quickly and in what sequence the HAD and GERD Reservoirs should be refilled. To maintain confidence that proper planning has taken place, coordinated communications with the media and public in all riparian countries will be important.

Reaching an agreement on a filling strategy is important now. However, it is also urgent to begin planning for the inevitable severe multi-year drought that will occur in the future. No one can predict when such an event will occur, but we can anticipate both its implications for system outcomes, and how it will be perceived by different stakeholders. It is in the interest of the Nile riparians, as well as the global community, for agreements to be in place to prevent a water panic from developing. Basin-wide drought planning can occur concurrently or begin immediately after an agreement over filling is reached.

Developing robust contingency plans is not an insurmountable task. In most years the GERD and HAD will require only modest coordination, and data transparency should be sufficient for effective planning. Yet this analysis demonstrates that nobody should be under the illusion that unilateral decision-making will allow management of a severe multi-year drought. It is incumbent on decision makers to reach agreement on the mechanisms and strategies needed for managing a new set of water-related risks.

Analysis framework and key assumptions

This study uses a detailed analytical water resources systems model called the Eastern Nile RiverWare Model (ENRM) 20 that simulates the current and future management of the river from 2020 until 2060. This simulation tool was developed using the rule-based RiverWare platform 39 , which has been used extensively by water managers and researchers to evaluate complex river and reservoir management operations for river basins around the world. Operating rules for each reservoir are translated into a set of prioritized logical statements that specify the reservoir releases required to meet a set of objectives for each water management infrastructure. Depending on the specific purposes of the infrastructure, the objectives for the Nile reservoirs may include satisfying agricultural and municipal needs, meeting power generation demands, achieving seasonal target elevations for sediment transportation, guaranteeing minimum monthly flow requirements, and implementing flood management and shortage avoidance policies. The key modeling assumptions are described below and in the  Supplementary Information , and the configuration of the ENRM is described in previous studies 20 , 21 .

Modeling the filling period (Era 1)

The filling policy used to demonstrate the range of outcomes is based on a preliminary proposal of the official National Independent Scientific Research Group (NISRG) that convened from 2018 to 2019. The NISRG was comprised of researchers appointed from each of the three countries. This policy assumes that the GERD Reservoir will be filled to required minimum turbine operation levels during the first two years of filling. Specifically, in year one, 4.9 bcm will be retained to bring the water level to the operation level for two low-head turbines—565 m above sea level (masl) (Supplementary Fig.  2 ). All remaining flows will pass through the dam’s temporary “low block” spillway since hydraulic capacity of the outlets are limited 27 . In the second year, a larger amount of water will be retained (13.5 bcm), to reach 595 masl and allow testing of additional turbines. These flows represent 5% and 15% of the natural average annual inflow to the HAD Reservoir in years 1 and 2, respectively, and 10% and 28% of average flow into the GERD Reservoir. From that point onwards, we assume that Ethiopia would release at least 35 bcm each year for the remainder of the filling period (to fill the remaining 55.6 bcm between 595 masl and the full supply level (FSL) of 640 masl). Releases would be made as evenly as possible throughout the water year (July to the following June). Therefore, water would be retained in the GERD Reservoir during the peak months of the Blue Nile flood (July, August, and September) and released throughout the year. Although the filling process may officially terminate when the reservoir elevation reaches 625 masl during the dry season, Ethiopia would continue to fill the GERD Reservoir up to the FSL of 640 masl at the peak of the flood season to maximize hydraulic head and energy generation.

During filling, we assume that Egypt will continue to attempt to release 55.5 bcm annually from the HAD Reservoir (4 bcm pumped directly from the reservoir to the Toskha project and the remainder through the dam outlet works) unless storage levels fall below volumes specified in the current Drought Management Policy. This policy specifies reductions of releases of 5%, 10%, and 15% if the storage levels in the HAD fall below 60, 55, and 50 bcm, respectively. These reductions are first reduced by reducing or eliminating the Toskha pumping demands, then HAD releases are further reduced if needed to meet the DMP reduction target (see Supplementary Fig.  1 ). We assume that Sudan will withdraw the current estimated total of 16.7 bcm from various diversion locations and that evaporative losses from Sudanese reservoirs vary based on reservoir levels 21 , 40 . A sensitivity analysis of this assumption is provided in Supplementary Note  6 and Supplementary Fig.  7 . Ethiopia is assumed to withdraw 0.45 bcm each year for the Finchaa irrigation scheme 41 . Historical irrigation sites around Lake Tana are not explicitly modeled, but inflows to the lake are derived via calibration with the outflows of Lake Tana 3 , hence they are implicitly assumed. Consumptive use values during filling are estimated and assumed to not expand into the immediate future. Assumed water usage in the model does not reflect any endorsement of water rights.

After filling (Eras 2 and 3)

Once the GERD FSL is reached, we assume a regular hydropower production of 1600 MW based on an estimated 90% maximum reliable hydropower generation rate 21 . Ethiopia’s electricity demands are projected to increase from 11.1 TWh in 2020 to 27.3 TWh in 2030 42 , suggesting that increasing their current 4400 MW of installed generation capacity with the 5150 MW from the GERD will soon be justified. We also assume the GERD pool elevation will be lowered to a maximum of 625 masl in June of each year for seasonal flood planning. We assume Egypt will continue to try to release 55.5 bcm each year from the GERD Reservoir, subject to the DMP described above. Although the GERD could allow Sudan to increase its irrigation withdrawals to the full allocation under the 1959 Nile Water Agreement of 18.5 bcm as measured at Aswan, the amount of additional water that Sudan can extract is uncertain due to ungauged diversions, a lack of transparent reporting, debates over how flood waters accumulated during previous years should be accounted for, and uncertainties over how evaporation from various reservoirs should be considered. For our analysis, we assume a continued withdrawl of 16.7 bcm from the current points of diversion, exclusive of reservoir evaporation losses. Egypt and Sudan disagree as to how evaporation losses from Sudanese reservoirs are to be counted in the calculation of Sudan’s allocation of 18.5 bcm in the 1959 Nile Waters Agreement. Egypt’s interpretation of the Agreement is that evaporation losses from the construction of Merowe, the heightening of Roseires Dam, and any new Sudanese dams should be included as part of Sudan’s allocation of 18.5 bcm. Sudan argues that the calculation of the Nile flow at Aswan (84 bcm) already considers the evaporation and seepage losses which occur inside Sudan, including evaporation losses from current and future dams. Thus, Sudan’s position is that evaporation losses from reservoirs constructed after the 1959 agreement should not be counted as part of its 18.5 bcm allocation.

Future Ethiopian developments relevant for Eras 2 and 3 are assumed to withdraw an additional 1.0 bcm from medium-term development plans in the Upper Beles (including transfers to the Dinder River), Anger and Arjo tributaries 10 , bringing the total Ethiopian diversion to 1.45 bcm—over and above the amounts used for irrigation around Lake Tana. Assumed future withdrawals are considered country-level targets and again do not reflect any endorsement of water rights.

Hydrologic conditions

Selecting traces to use in the three eras was based on an analysis of naturalized inflows to the HAD Reservoir from 1900 to 2018 3 , 4 . This naturalized data set reconstructs conditions prior to major human influence by removing the effects of upstream agricultural depletions and management. The period from 1900–2002 used a hydrologic reconstruction derived from 41 gauge sites by the consulting firm Deltares for the Nile Basin Initiative 3 . The naturalized flows at Aswan from 2003 to 2018 were derived using the gaged flows at Dongola 4 and adjusting for estimated Sudanese uses during this period increasing from 14.6 bcm (2005) to 16.7 bcm (2017). From this data set, we select representative historical periods that describe average, high and low flow conditions in the hydrologic record, as shown in Fig.  2 and Supplementary Note  5 and Supplementary Table  3 .

We recognize that future conditions will not replicate those of the past and that more severe conditions could materialize, especially with a changing climate 43 . The representative historical flow sequences nonetheless allow us to illustrate a wide range of hydrological events and management responses. Supplementary Fig.  5 demonstrates the range of 10-year average flows and the traces selected for the GERD Reservoir filling period (Era 1) and a drought recovery period (end of Era 3). Supplementary Figure  6 demonstrates the range of 20-year average flows and the traces selected for the new normal (Era 2) and the period entering a severe multi-year drought (start of Era 3).

From the perspective of a hydrologist planning for future climatic events, the use of historical flows to simulate a water resource system is restrictive because it ignores floods, droughts, and sequences of flows that are possible but not within the historical record 44 , 45 . Advanced stochastic methods for synthetic hydrology generation have been available for decades and continue to evolve 46 and the stochastic character of Nile flows has been extensively studied 47 , 48 , 49 resulting in state-of-the-art synthetic generation techniques that demonstrate a very large range of future possibilities for the Nile 50 , 51 , 52 . However, the Nile debate within the current and formal negotiations has focused primarily on what would happen if the notorious drought of the 1980s were to recur. More generally, the use of observed historical flow series remains standard practice in many complex transboundary river basin negotiations 53 , 54 .

Water resources planners and analysts have never adequately explained why the use of historical flow series is still the predominant method used in high-level river basin negotiations, despite the widespread recognition that the climate has changed and past hydrological records are unlikely to be a good guide to the future 55 . The use of historical flows has three advantages that have not been fully appreciated. First, simulations using historical flows are more easily understood and transparent, because they relate to real lived experience. Second, they are perceived to be less susceptible to bias and manipulation by modelers 56 , 57 , 58 . This is especially an advantage in river basins like the Nile with widely divergent climate change forecasts 32 , 59 , 60 , 61 .

Third, and most importantly, historical traces can be more readily used to create a convincing ‘policy narrative’ or ‘story’. The advantages of storytelling as an analytical approach for both describing status quo conditions and illustrating the consequences of different policy interventions are now widely understood in domains of business 62 and policy analysis 63 . However, many water resources professionals have not fully appreciated the importance of creating such a policy narrative to better understand and communicate the characteristics of a complex multi-faceted water resources problem. Historical flows have happened in the past and they often resonate emotionally in people’s memories. The storyline associated with historical hydrological traces is simple to explain: what would be the consequences if these flows occurred again. Importantly, such narratives are not just a means to communicate to nontechnical audiences; they are also valuable for modelers to better understand and place their results in a historical context.

Data availability

The data that support the findings of this study are available on request from the corresponding author [D.W.]. The data are not publicly available due to state restrictions and contain information that could compromise research participant privacy/consent.

Code availability

The model that support the findings of this study are available on request from the corresponding author [D.W.].

Sutcliffe, J. & Parks, Y. The hydrology of the Nile . (IAHS Press, 1999).

Abu‐Zeid, M. A. & Biswas, A. K. Some major implications of climatic fluctuations on water management. Int. J. Water Resour. Dev. 7 , 74–81 (1991).

Article   Google Scholar  

van der Krogt, W. & Ogink, H. Development of the Eastern Nile Water Simulation Model . Report No. 1206020-000-VEB-0010 (Deltares, Delft, 2013).

Sudan MoIWR. Gage Flows at Dongola Station (Sudan Ministry of Irrigation and Water Resources, 2019).

Hurst, H. E., Black, R. P. & Simaika, Y. S. M. A long-term plan for the Nile basin. Nature 160 , 611–612 (1947).

Article   ADS   MathSciNet   Google Scholar  

Tvedt, T. The River Nile in the Age of the British: Political Ecology and the Quest for Economic Power . (I.B.Tauris & Co. Ltd., 2004).

Mekonnen, D. Z. The Nile Basin Cooperative framework agreement negotiations and the adoption of a ‘Water Security’ paradigm: flight into obscurity or a logical Cul-de-sac? Eur. J. Int. Law 21 , 421–440 (2010).

Moussa, A. M. A. Dynamic operation rules of multi-purpose reservoir for better flood management. Alex. Eng. J.   57 , 1665–1679 (2018).

USBR. Land and Water Resources of the Blue Nile Basin: Ethiopia: Main Report and Appendices I–V . (United States Department of the Interior, Washington DC, 1964).

Awulachew, S. B. The Nile River Basin: water, agriculture, governance and livelihoods . (Routledge, 2012).

Government of Ethiopia. Vol. S/2020/409 (United Nations Security Council, United Nations Digital Library, 2020).

Arjoon, D., Mohamed, Y., Goor, Q. & Tilmant, A. Hydro-economic risk assessment in the eastern Nile River basin. Water Resour. Econ. 8 , 16–31 (2014).

Block, P. J. & Strzepek, K. Economic analysis of large-scale upstream river basin development on the Blue Nile in Ethiopia considering transient conditions, climate variability, and climate change. J. Water Resour. Plan. Manag. 136 , 156–166 (2010).

Digna, R. F. et al. Impact of water resources development on water availability for hydropower production and irrigated agriculture of the Eastern Nile Basin. J. Water Resour. Plan. Manag. 144 , 05018007 (2018).

Geressu, R. T. & Harou, J. J. Screening reservoir systems by considering the efficient trade-offs—informing infrastructure investment decisions on the Blue Nile. Environ. Res. Lett. 10 , 125008 (2015).

Article   ADS   Google Scholar  

Jeuland, M. & Whittington, D. Water resources planning under climate change: assessing the robustness of real options for the Blue Nile. Water Resour. Res. 50 , 2086–2107 (2014).

Kahsay, T. N., Kuik, O., Brouwer, R. & van der Zaag, P. Estimation of the transboundary economic impacts of the Grand Ethiopia Renaissance Dam: a computable general equilibrium analysis. Water Resour. Econ. 10 , 14–30 (2015).

Mulat, A. G. & Moges, S. A. Assessment of the impact of the Grand Ethiopian Renaissance Dam on tHe Performance Of The High Aswan Dam. J. Water Resour. Prot. 06 , 583–598 (2014).

Strzepek, K. M., Yohe, G. W., Tol, R. S. J. & Rosegrant, M. W. The value of the high Aswan Dam to the Egyptian economy. Ecol. Econ. 66 , 117–126 (2008).

Wheeler, K. G. et al. Cooperative filling approaches for the Grand Ethiopian Renaissance Dam. Water Int. 41 , 611–634 (2016).

Wheeler, K. G. et al. Exploring cooperative transboundary river management strategies for the Eastern Nile Basin. Water Resour. Res. 54 , 9224–9254 (2018).

Article   ADS   PubMed   PubMed Central   Google Scholar  

Nigatu, G. & Dinar, A. Economic and hydrological impacts of the Grand Ethiopian Renaissance Dam on the Eastern Nile River Basin. Environ. Dev. Econ. 21 , 532–555 (2015).

Sangiorgio, M. & Guariso, G. NN-based implicit stochastic optimization of multi-reservoir systems management. Water 10 , 303 (2018).

Taye, M. T., Willems, P. & Block, P. Implications of climate change on hydrological extremes in the Blue Nile basin: a review. J. Hydrol.: Regional Stud. 4 , 280–293 (2015).

Google Scholar  

Brown, C. M. et al. The future of water resources systems analysis: Toward a scientific framework for sustainable water management. Water Resour. Res. 51 , 6110–6124 (2015).

Loucks, D. P. From Analyses to Implementation and Innovation. Water 12 , 974 (2020).

Basheer, M. et al. Filling Africa’s largest hydropower dam should consider engineering realities. One Earth . 3 , 277–281 (2020).

Roussi, A. Gigantic Nile dam prompts clash between Egypt and Ethiopia. Nature 574 , 159 (2019).

Article   ADS   CAS   PubMed   Google Scholar  

Jeuland, M., Wu, X. & Whittington, D. Infrastructure development and the economics of cooperation in the Eastern Nile. Water Int.   42 , 121–141 (2017).

Basheer, M. et al. Quantifying and evaluating the impacts of cooperation in transboundary river basins on the Water-Energy-Food nexus: the Blue Nile Basin. Sci. Total Environ. 630 , 1309–1323 (2018).

Basheer, M. & Ahmed Elagib, N. Temporal analysis of water-energy nexus indicators for hydropower generation and water pumping in the Lower Blue Nile Basin. J. Hydrol. 578 , 124085 (2019).

Siam, M. S. & Eltahir, E. A. B. Climate change enhances interannual variability of the Nile river flow. Nat. Clim. Change 7 , 350 (2017).

Lund, J. R. & Guzman, J. Derived operating rules for reservoirs in series or in parallel. J. Water Resour. Plan. Manag. 125 , 143–153 (1999).

Lazer, D. M. J. et al. The science of fake news. Science 359 , 1094–1096 (2018).

Vosoughi, S., Roy, D. & Aral, S. The spread of true and false news online. Science 359 , 1146–1151 (2018).

Whittington, D., Hanemann, W. M., Sadoff, C. & Jeuland, M. The challenge of improving water and sanitation services in less developed countries. Found. Trends® Microecon. 4 , 469–609 (2009).

Kahneman, D. & Tversky, A. Prospect theory: an analysis of decision under risk. Econometrica 47 , 263–291 (1979).

Article   MathSciNet   MATH   Google Scholar  

Whittington, D. Policy note: ancient instincts—implications for water policy in the 21st century. Water Econ. Policy 02 , 1671002 (2016).

Zagona, E. A., Fulp, T. J., Shane, R., Magee, T. & Goranflo, H. M. RiverWare: a generalized tool for complex reservoir systems modeling. J. Am. Water Resour. Assoc. 37 , 913 (2001).

NBI. State of the River Nile Basin 2012 . (Entebbe, 2012).

Belissa, A. Establishing optimal reservoir operation of Fincha’a – Amerty Reservoirs MSc Civil Engineering thesis, Addis Ababa University, (2016).

Mondal, M. A. H., Bryan, E., Ringler, C., Mekonnen, D. & Rosegrant, M. Ethiopian energy status and demand scenarios: prospects to improve energy efficiency and mitigate GHG emissions. Energy 149 , 161–172 (2018).

Conway, D. Water resources: future Nile river flows. Nat. Clim. Change 7 , 319–320 (2017).

Harding, B. L., Sangoyomi, T. B. & Payton, E. A. Impacts of a severe sustained drought on Colorado River water resources. JAWRA J. Am. Water Resour. Assoc. 31 , 815–824 (1995).

Georgakakos, A. P. et al. Value of adaptive water resources management in Northern California under climatic variability and change: Reservoir management. J. Hydrol. 412-413 , 34–46 (2012).

Maass, A. Design of water-resource systems: new techniques for relating economic objectives, engineering analysis, and governmental planning . (Harvard University Press., 1962).

Hurst, H. E., Black, R. P. & Simaika, Y. M. Long-term storage: an experimental study . (Constable, 1965).

Conway, D. From headwater tributaries to international river: observing and adapting to climate variability and change in the Nile basin. Glob. Environ. Change 15 , 99–114 (2005).

Ward, N. & Conway, D. Applications of interannual-to-decadal climate prediction: an exploratory discussion on rainfall in the Sahel region of Africa. Clim. Serv. 18 , 100170 (2020).

Sutcliffe, J., Hurst, S., Awadallah, A. G., Brown, E. & Hamed, K. Harold Edwin Hurst: the Nile and Egypt, past and future. Hydrological Sci. J. 61 , 1557–1570 (2016).

Koutsoyiannis, D. Hydrology and change. Hydrological Sci. J. 58 , 1177–1197 (2013).

Koutsoyiannis, D., Yao, H. & Georgakakos, A. Medium-range flow prediction for the Nile: a comparison of stochastic and deterministic methods/Prévision du débit du Nil à moyen terme: une comparaison de méthodes stochastiques et déterministes. Hydrol. Sci. J. 53 , 142–164 (2008).

Sandoval-Solis, S., Teasley, R. L., McKinney, D. C., Thomas, G. A. & Patiño-Gomez, C. Collaborative modeling to evaluate water management scenarios in the Rio Grande Basin. JAWRA J. Am. Water Resour. Assoc. 49 , 639–653 (2013).

USBR. Colorado River Interim Guidelines for Lower Basin Shortages and the Coordinated Operations for Lake Powell and Lake Mead Final Environmental Impact Statement . (U.S. Department of the Interior, Washington DC, 2007).

Milly, P. C. D. et al. Stationarity is dead: whither water management? Science 319 , 573–574 (2008).

Article   CAS   PubMed   Google Scholar  

Rayner, S., Lach, D. & Ingram, H. Weather forecasts are for wimps: why water resource managers do not use climate forecasts. Climatic Change 69 , 197–227 (2005).

Gober, P., Kirkwood, C. W., Balling, R. C., Ellis, A. W. & Deitrick, S. Water planning under climatic uncertainty in phoenix: why we need a new paradigm. Ann. Assoc. Am. Geographers 100 , 356–372 (2010).

Olsson, J. A. & Andersson, L. Possibilities and problems with the use of models as a communication tool in water resource management. Water Resour. Manag. 21 , 97–110 (2007).

Strzepek, K. & McCluskey, A. The impacts of climate change on regional water resources and agriculture in Africa. World Bank Policy Research Working Paper (2007).

Beyene, T., Lettenmaier, D. P. & Kabat, P. Hydrologic impacts of climate change on the Nile River Basin: implications of the 2007 IPCC scenarios. Climatic Change 100 , 433–461 (2010).

Eltahir, E. A. B. & Wang, G. Nilometers, El Niño, and climate variability. Geophys. Res. Lett. 26 , 489–492 (1999).

Denning, S. Effective storytelling: strategic business narrative techniques. Strategy Leadersh. 34 , 42–48 (2006).

Roe, E. Narrative policy analysis: Theory and practice . (Duke University Press, 1994).

Download references

Acknowledgements

We would like to thank the following individuals for their comments and suggestions on previous drafts of this paper—Mohammed Alam, J. Anthony Allan, Mohammed Basheer, Thinus Basson, Alan Bates, Hesham Bekhit, Donald Blackmore, Ana Elisa Cascao, Simon Dadson, Ariel Dinar, Jerome Delli Priscoli, Asim I. El-Maghraby, Alaa Elzawahry, David Grey, Giorgio Guariso, Julien Harou, Kingsley Haynes, Daniel P. Loucks, Yasir Abbas Mohamed, Scott Moore, Claudia Sadoff, Abdulkarim H. Seid, Kenneth Strzepek, Eelco Van Beek, John Waterbury, Xun Wu, and Yasmin Zaerpoor.

We also appreciate the financial support for this research provided by the Oxford Martin Programme on Transboundary Resource Management.

Author information

Authors and affiliations.

Environmental Change Institute & Oxford Martin School, University of Oxford, Oxford, UK

Kevin G. Wheeler & Jim W. Hall

Sanford School of Public Policy & Duke Global Health Institute, Duke University, Durham, NC, USA

Marc Jeuland

CADSWES, University of Colorado, Boulder, CO, USA

Edith Zagona

University of North Carolina, Chapel Hill, NC, USA

Dale Whittington

University of Manchester, Manchester, UK

You can also search for this author in PubMed   Google Scholar

Contributions

K.G.W. and E.Z. developed the water management model described in the study; D.W. and M.J. led the conceptual development of eras; D.W., K.G.W., and M.J. led the statistical analysis and development of the hydrologic scenarios, J.W.H., D.W., and E.Z. contributed to the interpretations of societal implications and risks, all authors contributed to the writing of the article.

Corresponding author

Correspondence to Dale Whittington .

Ethics declarations

Competing interests.

K.G.W. has provided consulting services related to model development, Nile water management, and understanding the implications of the Grand Ethiopian Renaissance Dam since 2012 for the Nile Basin Initiative, the World Bank, Stockholm International Water Institute and the Water Resources Research Institute, Egypt. Contributions to research include GIZ on behalf of the German Federal Foreign Office. He has had ongoing academic collaborations with University of Khartoum, University of Addis Ababa, and Cairo University since 2012. M.J. currently provides consulting services (beginning in 2018) to the Nile Basin Initiative (NBI) to assist with the development of a hydroeconomic model to analyze water infrastructure investments in the Nile Basin. During 2017 he also provided technical support on economic analysis through the NBI’s Economist Forum. From 2006 to 2009 he was a member of the Eastern Nile Scoping Study Team, whose work was commissioned by the Eastern Nile Council of Ministers and funded by the World Bank. D.W. served as Chair of the Board of the Environment for Development Initiative until 2019, which has a research center in Addis Ababa that works on water resource management issues in Ethiopia. From 2006 to 2009 he was a member of the Eastern Nile Scoping Study Team, whose work was commissioned by the Eastern Nile Council of  Ministers and funded by the World Bank. In 2017–2018 he served as a member of an external technical advisory committee for Deltares on a project—financed by the Nile Water Sector, Government of Egypt—to study the effects of the Grand Ethiopian Renaissance Dam on the Nile system. E.Z. provided consulting services to the Nile Basin Initiative (NBI) from 2007 to 2012, providing technical expertise to the development of the Nile Basin Decision Support System, and also in 2015–2017, providing assistance to NBI’s Strategic Water Resources analysis, a collaborative work with stakeholders from the Nile Basin countries. J.W.H. has no competing interests to declare.

Additional information

Peer review information Nature Communications thanks Declan Conway, Kingsley Haynes and the other, anonymous, reviewer(s) for their contribution to the peer review of this work. Peer reviewer reports are available.

Publisher’s note Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Supplementary information

Supplementary information, peer review file, rights and permissions.

Open Access This article is licensed under a Creative Commons Attribution 4.0 International License, which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license, and indicate if changes were made. The images or other third party material in this article are included in the article’s Creative Commons license, unless indicated otherwise in a credit line to the material. If material is not included in the article’s Creative Commons license and your intended use is not permitted by statutory regulation or exceeds the permitted use, you will need to obtain permission directly from the copyright holder. To view a copy of this license, visit http://creativecommons.org/licenses/by/4.0/ .

Reprints and permissions

About this article

Cite this article.

Wheeler, K.G., Jeuland, M., Hall, J.W. et al. Understanding and managing new risks on the Nile with the Grand Ethiopian Renaissance Dam. Nat Commun 11 , 5222 (2020). https://doi.org/10.1038/s41467-020-19089-x

Download citation

Received : 10 April 2020

Accepted : 16 September 2020

Published : 16 October 2020

DOI : https://doi.org/10.1038/s41467-020-19089-x

Share this article

Anyone you share the following link with will be able to read this content:

Sorry, a shareable link is not currently available for this article.

Provided by the Springer Nature SharedIt content-sharing initiative

This article is cited by

Energy trade tempers nile water conflict.

  • Mikiyas Etichia
  • Mohammed Basheer
  • Julien J. Harou

Nature Water (2024)

Energy trade is the future of water management for the Nile

  • Kevin G. Wheeler

Traits impacting water crisis management

  • Kausar Yasmeen
  • Kashifa Yasmin
  • Muhammad Adnan

Discover Water (2024)

Numerical assessment of the risk of GERD break on the downstream countries

  • Ahmed M. Elbelasy
  • Abdel Hamed M. Khater
  • Amir S. Ibrahim

Applied Water Science (2024)

Water desalination using PV panels based on boiling and evaporation

  • John Iskander
  • Othman Shihimi
  • M. S. Abd-Elhady

By submitting a comment you agree to abide by our Terms and Community Guidelines . If you find something abusive or that does not comply with our terms or guidelines please flag it as inappropriate.

Quick links

  • Explore articles by subject
  • Guide to authors
  • Editorial policies

Sign up for the Nature Briefing: Anthropocene newsletter — what matters in anthropocene research, free to your inbox weekly.

aswan dam case study geography

aswan dam case study geography

Live revision! Join us for our free exam revision livestreams Watch now →

Reference Library

Collections

  • See what's new
  • All Resources
  • Student Resources
  • Assessment Resources
  • Teaching Resources
  • CPD Courses
  • Livestreams

Study notes, videos, interactive activities and more!

Geography news, insights and enrichment

Currated collections of free resources

Browse resources by topic

  • All Geography Resources

Resource Selections

Currated lists of resources

The Impacts of Dams - Case Study of the River Nile

21st December 2014

  • Share on Facebook
  • Share on Twitter
  • Share by Email

As many new dams are planned to be built along the River Nile, many people are fighting back against them.

The Aswan Dam is one of the case studies I look at with my GCSE pupils to look at large scale water management and large scale development schemes. Whilst the pupils enjoy learning about this, they often don't see its importance today as the modern dam was completed in the 1970s, which to our pupils is a very long time ago. In the news recently I have seen that the construction of new dams on the River Nile, particularly in Sudan, are causing conflict with many groups of people worried that the construction of the dams will destroy not only the environment, but also their culture and lifestyle.

In 2007, the Nubian people and many activists helping them to fight for their land, won a battle to prevent the construction of the Kajbar Dam, which, if built, would have destroyed up to 90 villages and displaced approximately 10,000 people. In a protest that occurred at the time, 4 people were killed and 20 injured in the fights with the authorities. The Government then gave up on its plans to build the dam. However, the plans are now back on, with a proposed 20 metre high dam on the cards, with a 110sq km reservoir planned behind it. The environmental damage is clear, but just as important is the impact on the Nubian communities whose villages, practices and culture will be destroyed as they are displaced to other areas. The impact on the Nubians is clear to see and for many elders, they may have witnessed the impacts themselves, when the Aswan Dam's creation caused 52,00 Nubians to be moved from their traditional homeland.

Ongoing issues like this definitely make the case study more interesting and "real" to my pupils.

Joanne Parkinson

An experienced, outstanding Geography teacher, GCSE examiner and Head of Humanities in a 11-18 school. I'm passionate about all geographical events and am a keen blogger.

You might also like

Our subjects.

  • › Criminology
  • › Economics
  • › Geography
  • › Health & Social Care
  • › Psychology
  • › Sociology
  • › Teaching & learning resources
  • › Student revision workshops
  • › Online student courses
  • › CPD for teachers
  • › Livestreams
  • › Teaching jobs

Boston House, 214 High Street, Boston Spa, West Yorkshire, LS23 6AD Tel: 01937 848885

  • › Contact us
  • › Terms of use
  • › Privacy & cookies

© 2002-2024 Tutor2u Limited. Company Reg no: 04489574. VAT reg no 816865400.

HISTORIC ARTICLE

Jul 21, 1970 ce: aswan dam completed.

On July 21, 1970, Egyptian engineers completed the Aswan Dam, which controls the flow of the Nile River.

Engineering, Geography, Physical Geography

Loading ...

On July 21, 1970, engineers completed the Aswan Dam in southern Egypt. The Aswan Dam was an enormous project, lasting more than 10 years and costing more than a billion dollars.

The Aswan Dam controls the flow of the Nile River. The dam protects people living near the banks of the Nile from both floods and drought . The constant , regulated flow of water helps farmers irrigate their crops all year. The structure is also a hydroelectric dam , providing electricity used in a significant amount of Egypt's infrastructure.

The Aswan Dam created a huge reservoir , called Lake Nasser. Lake Nasser and expansion of the Nile behind the dam displaced more than 50,000 people in Egypt and Sudan. The dam also drowned priceless archaeological sites . The Egyptian government famously relocated features from one of these sites— colossal monuments of Pharaoh Ramses II—to a nearby hill before the site was flooded.

Media Credits

The audio, illustrations, photos, and videos are credited beneath the media asset, except for promotional images, which generally link to another page that contains the media credit. The Rights Holder for media is the person or group credited.

Last Updated

October 19, 2023

User Permissions

For information on user permissions, please read our Terms of Service. If you have questions about how to cite anything on our website in your project or classroom presentation, please contact your teacher. They will best know the preferred format. When you reach out to them, you will need the page title, URL, and the date you accessed the resource.

If a media asset is downloadable, a download button appears in the corner of the media viewer. If no button appears, you cannot download or save the media.

Text on this page is printable and can be used according to our Terms of Service .

Interactives

Any interactives on this page can only be played while you are visiting our website. You cannot download interactives.

Joint Programs

MIT Global Change

Search form, the high dam at aswan, abstract/summary:.

Dam assessment, by its very nature, is a complex undertaking. Many of the benefits and costs associated with dam development have quite different time streams. These benefits and costs are faced by different sectors and there are inter-relationships between sectors. The effects of dams are distributed across different spatial scales, from local to basin, to regional to national, and in some cases, to trans-national. To add to the complexity, while some of the impacts of the dam projects are ‘direct’, the others are ‘indirect’ with the definition of what constitutes ‘direct’ versus ‘indirect’ impacts also varying.

The aim of the present study has been to evaluate some of the above interactions, in particular the ‘direct’ and ‘indirect’ economic impacts of dams. The study ex-post evaluates the magnitude of multipliers, a measure of the total benefits (direct plus indirect) of the project in relation to its direct benefits, and assesses the distributional and poverty reduction impacts of dam projects. The four cases studied in the present book include three large projects—Bhakra Dam System (India), Aswan High Dam (Egypt) and Sobradinho Dam (and the set of cascading reservoirs) (Brazil)— and one small check dam—Bunga (India).

The present study should be seen as one of the numerous other steps that need to be taken to reach the goal of evaluating the full development impact of the dam projects. The aim here has been to highlight the relevance of one of the components of a full evaluation of dam projects that is often neglected, i.e., their indirect and induced economic impacts.

  • Book/Chapter

Robinson, S., K. Strzepek, M. El-Said and H. Hofgren

Abstract/Summary: 

Impacts of the Aswan High Dam After 50 Years

  • Published: 21 January 2015
  • Volume 29 , pages 1873–1885, ( 2015 )

Cite this article

aswan dam case study geography

  • Hesham Abd-El Monsef 1 ,
  • Scot E. Smith 2 &
  • Kamal Darwish 2  

5733 Accesses

35 Citations

1 Altmetric

Explore all metrics

Perform an assessment of the environmental and health impacts of the Aswan High Dam (AHD) after nearly 50 years of operation. This paper describes the effect the AHD had on (1) the prevalence and incidence of schistosomiasis in Egypt, (2) sedimentation in the reservoir formed by the AHD (Lake Nasser in Egypt and Lake Nubia in North Sudan), (3) soil water logging and subsequent soil salinization in the Nile Delta (4) coastal retreat along the Egyptian Mediterranean Sea.

• Schistosomiasis has decreased in Egypt since the AHD.

• Agricultural fields in the Nile Valley and Delta tend to waterlogged and since the water is not flushed out annually, the soils are saltier and so less fertile. However, the AHD affords multi-cropping during the year and Egyptian farmers have adopted better seeds and harvesting methods. Overall, agricultural production in Egypt has increased.

• Coastal erosion is severe in some areas, especially at the Rosetta and Damietta promontories. Efforts to stop the overall coastline retreat have been largely unsuccessful. Other areas of the Egyptian Mediterranean coastline are stable or have accreted.

• Reservoir-induced seismicity is not an issue.

• Deterioration of low-lying ancient Egyptian monuments due to seepage water from irrigation is a problem.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price includes VAT (Russian Federation)

Instant access to the full article PDF.

Rent this article via DeepDyve

Institutional subscriptions

Similar content being viewed by others

aswan dam case study geography

Environmental Impacts of AHD on Egypt Between the Last and the Following 50 Years

aswan dam case study geography

Resilience of the Human-Water System at the Southern Silk Road: A Case Study of the Northern Catchment of Erhai Lake, China (1382–1912)

Assessing the influence of water level on schistosomiasis in dongting lake region before and after the construction of three gorges dam.

Abu-Zeid M (1987) Environmental impact assessment for the Aswan High Dam. Nat Resour Environ Ser

Baralat R (2013) Epidemiology of Schistosomiasis in Egypt: travel through time: review. J Adv Res 4(5):425–432

Article   Google Scholar  

De Wolfe-Miller F, Hussein, Mancy K, Hilbert M (1978) Impacts of the Aswan High Dam on the prevalence of schistosomiasis in Egypt. In: Proceedings of the Environmental Effects of Hydraulic Engineering Works, p 459–468

El Alamy M, Cline B (1977) Prevalence and intensity of Schistosoma Haematobium and S. mansoni infection in Qalyub, Egypt. AmJTrop Med Hyg 26(3):470–472

Google Scholar  

Elba E, Farghaly D, Urban B (2014) Modeling high Aswan Dam reservoir morphology using remote sensing to reduce evaporation. Int J Geosci 5:156–169

Farvar M, Milton J (eds) 1972 The careless technology: ecology and international development. In: Proceedings, Conference on Ecological Aspects of International Development. Natural History Press, Garden City, NY, pp 456–472

Kalifa E, Redy R, Alhayawei S (2012) Estimation of evaporation losses from Lake Nasser: neural network based modeling versus multivariate linear regression. J Appl Sci Res 8(5):2785–2799

Malek E (1975) Effect of the Aswan High Dam on prevalence of schistosomiasis in Egypt. Trop Geogr Med 27(4):359–364

Moustafa A (2013) Predicting deposition in the Aswan High Dam Reservoir using a 2-D model. Ain Shams Eng J Elsevier 4:143–153

Sadek M, Shahin M, Stigter C (1997) Evaporation from the reservoir of the High Aswan Dam, Egypt: a new comparison of relevant methods with limited data. Theor Appl Climatol 56(1–2):57–66

Smith S (1986) General impacts of the Aswan High Dam. J Water Resour Plan Manag 112:551–562

Smith S (1990) A revised estimate of the life span of Lake Nasser. J Env Geol Water Resour 15:123–129

Smith S, Abdel-Kader A (1988) Coastal erosion along the Egyptian Delta. J Coast Res 4:245–255

Sterling C (1971a) The Aswan Disaster. National Parks and Conservation Magazine May 1971. p 10

Sterling C (1971b) Headaches spill over Aswan Dam. Washington Post, April 4, 1971

Sterling C (1971c) Aswan Dam looses a flood of problems. Life Magazine, March 5, 1971

Sterling C (1972) The Aswan disaster. In: Giddens J, Monroe M (eds) Our chemical environment. Canfield Press, San Francisco, pp 278–297

Download references

Author information

Authors and affiliations.

Suez Canal University, Ismailia, Egypt

Hesham Abd-El Monsef

Geomatics Program, University of Florida, Gainesville, Fl, 32611, USA

Scot E. Smith & Kamal Darwish

You can also search for this author in PubMed   Google Scholar

Corresponding author

Correspondence to Scot E. Smith .

Rights and permissions

Reprints and permissions

About this article

Abd-El Monsef, H., Smith, S.E. & Darwish, K. Impacts of the Aswan High Dam After 50 Years. Water Resour Manage 29 , 1873–1885 (2015). https://doi.org/10.1007/s11269-015-0916-z

Download citation

Received : 30 June 2014

Accepted : 05 January 2015

Published : 21 January 2015

Issue Date : April 2015

DOI : https://doi.org/10.1007/s11269-015-0916-z

Share this article

Anyone you share the following link with will be able to read this content:

Sorry, a shareable link is not currently available for this article.

Provided by the Springer Nature SharedIt content-sharing initiative

  • Aswan High Dam
  • Environmental impact
  • Find a journal
  • Publish with us
  • Track your research

United Nations Digital Library System

Browse Subjects

  • ENVIRONMENTAL IMPACT ASSESSMENT
  • CONFERENCES
  • FEASIBILITY STUDIES
  • CASE STUDIES
  • TECHNICAL ASPECTS

aswan dam case study geography

Skip to content

Get Revising

Join get revising, already a member.

Ai Tutor Bot Advert

  • Created by: Kay
  • Created on: 13-05-11 09:02

Aswan Dam, Egypt

The Aswan Dam is located on the River Nile in Southern Egypt. It stands 111 metres high and 3,830 metres wide.

This case study can be used for GCSE geography or AS Level for the WJEC exam board. I will be using it in my AS level geography exam for 'Flood Management Schemes'.

If I were asked the question - 'Evaluate the pros and cons of a flood management scheme (10)' ... this is the answer I would give. I've done each paragraph in different colours to make it easier to read. Also, after the wordy bits, I've done the whole answer in bullet point form. 

Firstly, I will talk about the history of the River Nile, and why there was a need for the Aswan High Dam to be built.

Throughout time, the River Nile has been the only reason that people have been able to live and prosper in Egypt. Annual floods that covered farmland on the banks of the river, deposited silt that fertilized the land naturally and officiently. Unfortunately, some years the floods wouldn't arrive - leaving the country in famine, which lead to disease. Hundreds upon thousands would die if the Nile did not fertilize the farmland. Other years, the Nile would flood over the farmland, washing away entire villages and killing many people.

To combat this, the Egyptian government decided to build the Aswan High Dam, in Aswan. The main idea was that controlled flooding would ensure that no lives were lost due to famine or flood. The dam also generated Hydroelectricity, which was supplied to over 20% of the country. On top of all these pros, the dam also created enormous tourism due to Lake Nasser, the reservoir that was …

  • Case studies

Report Mon 11th June, 2012 @ 14:41

Similar Geography resources:

Physical Geography- Low Energy Coastline Case Study: Nile Delta 0.0 / 5

The Nile Delta 0.0 / 5

AS Geography - Hard Engineering 0.0 / 5

river case studies 3.0 / 5 based on 1 rating

AS GEOGRAPHY RIVER MANAGEMENT 0.0 / 5

Desertification 0.0 / 5

Nile River, eugypt 0.0 / 5

Global hazards - the future 0.0 / 5

Global Hazards - The Future 0.0 / 5

Floods & Hyrdographs 3.5 / 5 based on 2 ratings

Related discussions on The Student Room

  • Required practicals chemistry A level »
  • A levels exam »
  • when are my rs exams? »
  • What to do. Rejection and delays :( »
  • Edexcel GCSE Geography A Paper 1 (1GA0 01) - 22nd May 2023 [Exam Chat] »
  • Help with level 3 social science »
  • A level Russian 2022 »
  • OCR A-Level Geography Physical Systems | [17th May 2023] Exam Chat »
  • School forces EPQ? Worth it for Maths? »
  • A level math 9MA0 or 9811 specification? »

aswan dam case study geography

Learn the span of world history from 1300 to the present.

  • Assignments

Case Study 8, Week 10

The aswan dam and development in the third world.

aswan dam case study geography

Great points and a good job here! I really like the structure and the use of images to be able to describe the process and significance of the construction of the Aswan Dam. How this megaproject at the time translated to the effects of water flow in the Nile that would affect Egypt and other countries reliant on it. How the nationalization of the Suez Canal cause friction between the belligerents and the US/USSR. How Naseer wanted to increase the statue of Egypt. I think the use of sources would have been good to add in case the reader wants to delve further in the topic. But good job!

I like how the Aswan Dam was framed with a primarily political lens. You also tied the strength and defense capabilities of the Egyptian Army to ideas of national defense and tension with Israel. I enjoy the detail you describe Soviet aid to Egypt in the Canal’s construction. I would have like to see more discussion of the economic implications and effects of the Dam, but otherwise it was great!

You have made a really great job with this presentation! I really liked how you have employed the visual sources and how have framed the all context around the Nile and the building of the dam. I would have put a little more emphasis on the answer to the case study but you did anyway a very good presentation since it is well written and easy to read!

Congrats on this presentation! It describes nicely the effect of the construction of the Aswan Dam on the economic and socio-political development of Egypt. You interestingly brought in the discussion of the cold war and the support of the western countries and the Soviet Union at the same time. The social effect and the relocation of the temple of Abu Simbel, it is really important in this case study too. However, it might be even better to have some conclusions of this presentation after demonstrating everything and perhaps to know the effect of this event nowadays for Egypt and for the rest of the world.

© 2024 Global History Lab 2021

Theme by Anders Noren — Up ↑

Marked by Teachers

  • TOP CATEGORIES
  • AS and A Level
  • University Degree
  • International Baccalaureate
  • Uncategorised
  • 5 Star Essays
  • Study Tools
  • Study Guides
  • Meet the Team
  • Hydrology & Fluvial Geomorphology

Case Study: Water Management Scheme/Flood Control

Authors Avatar

Nathan Cook

Geography Case Study

Aswan Dam, Egypt

∙ The Aswan Dam is in Egypt, which is in Africa. The dam is on the river Nile which is 6698km long, the dam is 3600km and extends 480km into Sudan.

∙ Aswan is about 200km away from the Egyptian coast bordering the Red Sea

∙  Is about 700km south of Cairo – the capital of Egypt

∙ About 800km South of the Mediterranean Sea

∙ About 230km North of the Border of Sudan

∙ About 800km West of the Border of Libya

The features of the dam were:

∙ To prevent flooding of the land around the river Nile.

∙ Provides Electricity - 12 turbines that generate over 10 billion kilowatts of electricity every year.

Join now!

∙ Provides a more reliable source of water for increasing population.

∙ Enabled fish to breed in the reservoir so more fish can be caught and used at food.

∙ The scheme was necessary because the Nile over flowed and flooded the land around it for 2-3 months of the year which made farming hard as the farmers never knew when the Nile was going to flood and how long the floods will last, meaning that they get less food for them to survive on. The dam created a huge reservoir, which was to, controlled the flooding.

This is a preview of the whole essay

∙ Millions of tons of sediment that was used to fertilise the farms now gets trapped in the dam. The farmers now have to use chemical fertilisers, which costs them a lot money and causes pollution.

∙ The silt used to keep the big Nile delta fertile and safe from erosion by the sea, but the delta is now being eroded.

∙ Water snails spread a disease called bilharzia. The dam causes these snails to grow in numbers so the disease is spread more

∙ The evaporation of irrigation water has caused a build up of salt in the soil, reducing yield of farmland.

∙ 10000 people in Nubia had to be moved because they had to flood it to create the reservoir. Many of the people did not want to leave and homes, religious buildings and cemeteries were lost.

∙ The Nile delta is becoming smaller. This is because the Nile no longer carries any sediment and pebbles downstream from the dam. The pebbles and sediment get stuck behind the dam. Wildlife is losing its home because the delta is shrinking in size.

The scheme was successful on the fact that it stopped the flooding when they didn’t want or need it to flood (to fertilize the farmland) but it did cause many problems in the fact that the Nile Delta is getting smaller and that wildlife are losing there homes because of it, farmers now have to use chemical fertilizers to fertilize the soil which causes pollution, disease is still spread through the water through water snails. So basically the scheme was successful of its goal but does have a few flaws with it.

Other useful facts

∙ The second dam was built 5km upstream from the original dam as the original dam kept overflowing, causing floods, they decided against rising the original dam for a third time.

∙ The Soviet Union helped build the dam

∙ It took 11 years to build; workers worked all day and night to get it finished.

∙ Egypt asked to borrow money from the World Bank to help build the dam, which was accepted, but later was rejected again for unknown reasons.

∙ Lake Nasser was created behind the Aswan Dam. It is the largest artificial lake in the World (310 miles in length). It is named after Gamal Abdul Nasser, who a former President of Egypt.

Case Study: Water Management Scheme/Flood Control

Document Details

  • Word Count 603
  • Page Count 2
  • Level AS and A Level
  • Subject Geography

Related Essays

Case Study: The Mississippi River Flood of 1993

Case Study: The Mississippi River Flood of 1993

River Management Case Study on The Mississippi.

River Management Case Study on The Mississippi.

York Flood Management Report

York Flood Management Report

To what extent the flood alleviation scheme has had on the environment and people of Swanage and to find out weather the scheme has been successful.

To what extent the flood alleviation scheme has had on the environment and...

According to the United Nations HYDRO Association the Aswan High Dam is the 6 th worst large dam for negatively impacting the environment, and it is ranked 7 th for humanitarian impacts (Jobin).  If constructed today the Aswan High Dam would not pass UNEP's regulations as a result of its harmful impacts to the surrounding regions.  Although the dam effectively controls water flow during times of flooding and drought, is also obstructs seasonal flood patterns, preventing the flow of natural nutrients and minerals downstream, which farmers in the Nile floodplain depend on to fertilize agricultural lands.  This sediment is also used to replenish lands eroded by river flow, creating a breakdown of the Nile Delta, which may cause the tributaries to merge with ocean waters, killing marine life within waterways.  Marine life in the Nile River has also been affected by the increased use of fertilizers by farmers in a response to the lack of natural silt (Dougherty).

Figure One: Aswan High Dam; Aswan, Egypt; Aerial Photograph

As a result of the hot Egyptian climate, water from the reservoir evaporates at a rapid rate, raising the temperatures of the water and further increasing contaminant concentration, depleting local fish populations.  Because of these conditions it is suspected that methane emission levels are fairly high, therefore, further polluting the region (Jobin).

In addition to its environmental impacts, the Aswan Dam has displaced over 60,000 people since its completion in 1970 (Dougherty), and the still water has become a breeding ground for diseased mosquitoes, increasing the rate of malaria throughout the region.  Also, as a result of its extensive reservoir, the Aswan High Dam has submerged valuable and culturally rich archaeological sites throughout the river valley.  It is argued that the mere 2100-megawatt capacity of the mega dam is not worth all of the humanitarian and environmental implications its construction has inflicted on surrounding areas.

One thought on “Case Study”

First, the EIA process has eveolved over many decades. It is not fair to judge things constructed many decades ago using today’s criteria or standards.

In my view, eventoday, I thing it is a historic humanitarian achievement and its benefits outweigh its adverse effects. Water is life. It is needed before anything else, including the minerals eroded from the nile sources.

Are there some problems? yes (and it happens with many mega projects, from hydro to nulear. However, we should learn from them.

Comments are closed.

IMAGES

  1. PPT

    aswan dam case study geography

  2. Aswan Dam Completed

    aswan dam case study geography

  3. The location of the case study (Aswan High Dam).

    aswan dam case study geography

  4. Aswan Dam: A Guide To This Spectacular Dam In The Historical Country

    aswan dam case study geography

  5. Sketch map of Aswan High Dam Reservoir [‎ 3].

    aswan dam case study geography

  6. Aswan High Dam

    aswan dam case study geography

VIDEO

  1. Prophecy fulfilled for the River Nile and the Aswan dam

  2. Aswan High Dam In Egypt

  3. Africa’s $5BN Mega-dam Will Block the Nile

  4. Aswan Dam and monument of Soviet-Egyptian friendship, Egypt

  5. Aswan Dam (Egypt)

  6. H.E.P. and Hassle at the Aswan High Dam, Egypt

COMMENTS

  1. Aswan High Dam

    The Aswan Low Dam, or Old Aswan Dam, was completed in 1902, with its crest raised in 1912 and 1933, and lies 6 km (4 miles) downstream from the Aswan High Dam. It holds back about 4.9 billion cubic metres (174.2 billion cubic feet) of water from the tail of the Nile flood in late autumn. Once one of the largest dams in the world, it is 2,142 ...

  2. Aswan Dam case study

    The Aswan High Dam is 3600 metres long and 111 metres high. The construction started on the dam in 1960 and it was completed in 1971 and 30 000 Egyptian people worked day and night to build the Aswan High Dam. The building of the dam was funded by the Soviets who in June 1956 offered their loan of $1,120,000,000 at 2% interest for the construction.

  3. Geography A Level AQA Case Studies- Aswan Dam Flashcards

    penetrates deeper in Nile water and increased presence of nutrients from fertilisers- so more algae, and higher costs of water treatment. Study with Quizlet and memorize flashcards containing terms like The Aswan Dam is situated..., Reservoir of Nile waters stored behind is called..., Lake Nassar? and more.

  4. Aswan Dam

    The Aswan Dam, or more specifically since the 1980s, the Aswan High Dam, is one of the world's largest embankment dams, which was built across the Nile in Aswan, Egypt, between 1960 and 1970.When it was completed, it was the tallest earthen dam in the world, eclipsing the United States' Chatuge Dam. Its significance largely upstaged the previous Aswan Low Dam initially completed in 1902 ...

  5. Aswan Dam

    132km3 of water. What is the reservoir behind the dam known as? Lake Nasser. What are some positive socio-economic impacts? (3) -the lake created more land for people to farm on as its used to irrigate the surrounding area. - the lake created a large fishing industry, producing over 25,000 tonnes of fish per year.

  6. Understanding and managing new risks on the Nile with the Grand

    When construction of the Grand Ethiopian Renaissance Dam (GERD) is completed, the Nile will have two of the world's largest dams—the High Aswan Dam (HAD) and the GERD—in two different ...

  7. The Impacts of Dams

    The Aswan Dam is one of the case studies I look at with my GCSE pupils to look at large scale water management and large scale development schemes. Whilst the pupils enjoy learning about this, they often don't see its importance today as the modern dam was completed in the 1970s, which to our pupils is a very long time ago.

  8. Aswan Dam Completed

    On July 21, 1970, engineers completed the Aswan Dam in southern Egypt. The Aswan Dam was an enormous project, lasting more than 10 years and costing more than a billion dollars.. The Aswan Dam controls the flow of the Nile River. The dam protects people living near the banks of the Nile from both floods and drought.The constant, regulated flow of water helps farmers irrigate their crops all year.

  9. PDF Impacts of the High Aswan Dam

    Because of these reasons, this study of the High Aswan Dam considered develop-ments for some 35 years after the construction of the dam, even though the later impacts ... case of the High Aswan Dam, land-use changes in Egypt may have been at most an indirect result caused by the damÕs construction. This is because the population of

  10. The High Dam at Aswan

    The four cases studied in the present book include three large projects—Bhakra Dam System (India), Aswan High Dam (Egypt) and Sobradinho Dam (and the set of cascading reservoirs) (Brazil)— and one small check dam—Bunga (India). The present study should be seen as one of the numerous other steps that need to be taken to reach the goal of ...

  11. Impacts of the Aswan High Dam After 50 Years

    Objectives. Perform an assessment of the environmental and health impacts of the Aswan High Dam (AHD) after nearly 50 years of operation. This paper describes the effect the AHD had on (1) the prevalence and incidence of schistosomiasis in Egypt, (2) sedimentation in the reservoir formed by the AHD (Lake Nasser in Egypt and Lake Nubia in North Sudan), (3) soil water logging and subsequent soil ...

  12. Case Study on The Aswan High Dam: Its Impact on The Environment and Its

    title case study on the aswan high dam: its impact on the environment and its side-effects. access english: e_escwa_env_wg.16_6-en - pdf; date 1979-12-20.

  13. Dams, people, and development: The Aswan High Dam case

    The author examines the Aswan High Dam project in Egypt from 1963 to the present with particular reference to the impact on the people most directly concerned. The author examines the Aswan High Dam project in Egypt from 1963 to the present with particular reference to the impact on the people most directly concerned. The resettlement of some 100000 Nubians in Sudan and Egypt is described the ...

  14. Geography A Level AQA Case Studies- Aswan Dam Flashcards

    Study with Quizlet and memorize flashcards containing terms like The Aswan Dam is situated..., Reservoir of Nile waters stored behind is called..., Lake Nassar? and more. ... Geography A Level AQA Case Studies- Aswan Dam. Flashcards. Learn. Test. Match. The Aswan Dam is situated...

  15. Water Management Models in Practice: A Case Study of the Aswan High Dam

    This book studies the development and evaluation of the operating policy for the Aswan High Dam and its relation to the development of water resources policy in Egypt. Using a series of reservoir ...

  16. Aswan Dam

    Aswan Dam, Egypt. Case Study. The Aswan Dam is located on the River Nile in Southern Egypt. It stands 111 metres high and 3,830 metres wide. This case study can be used for GCSE geography or AS Level for the WJEC exam board. I will be using it in my AS level geography exam for 'Flood Management Schemes'.

  17. The Aswan Dam and Development in the Third World

    Case Study 8, Week 10 The Aswan Dam and Development in the Third World. November 20, 2021 / singh.1951368 / 4 Comments. 0 0 votes. Article Rating. Subscribe. Login. ... I would have put a little more emphasis on the answer to the case study but you did anyway a very good presentation since it is well written and easy to read! Reply. Daniela Bace

  18. Case Study: Water Management Scheme/Flood Control

    AS and A Level Geography. Nathan Cook. Geography Case Study. Case Study: Water Management Scheme/Flood Control. Aswan Dam, Egypt. ∙ The Aswan Dam is in Egypt, which is in Africa. The dam is on the river Nile which is 6698km long, the dam is 3600km and extends 480km into Sudan. ∙ Aswan is about 200km away from the Egyptian coast bordering ...

  19. Geography Aswan High Dam case study Flashcards

    Energy generated. 10 billion kw annually. water held. 132 km2. Began construction. 1960. Completed construction. 1971. Lake created by the Aswan Dam.

  20. Case Study

    Case Study. According to the United Nations HYDRO Association the Aswan High Dam is the 6 th worst large dam for negatively impacting the environment, and it is ranked 7 th for humanitarian impacts (Jobin). If constructed today the Aswan High Dam would not pass UNEP's regulations as a result of its harmful impacts to the surrounding regions ...

  21. Aswan Dam

    - flood and drought management - 60% of water from the dam is used for irrigation - hydroelectric power - opportunities for tourism and recreation Water losses - The dam provides less than half the amount of water expected due to the increased evaporation from Lake Nasser

  22. Aswan Dam

    The Aswan Dam is know as a multi-purpose scheme: stores water and used to irrigate crops; provides hydroelectricity; 1 of 4. Advantages of the Aswan Dam + ... Geography - Case Studies. 0.0 / 5. Tar Sands, Alberta, Canada. 5.0 / 5 based on 1 rating. Geography - patterns in resource consumption.

  23. Case Study- The Aswan Dam Flashcards

    Study with Quizlet and memorize flashcards containing terms like Where is the Aswan Dam?, When was it constructed? How large is it?, What were the positive impacts of the dam? and more.