If you've been in project management for a while, you must’ve encountered the Waterfall methodology. It's an old-school software development method from the 1970s.

In a Waterfall process, you must complete each project phase before moving to the next. It's pretty rigid and linear. The method relies heavily on all the requirements and thinking done before you begin.

Don't worry if you haven't heard of it. Let’s break the Waterfall method down and see how it works.

What is the Waterfall methodology?

Waterfall methodology is a well-established project management workflow . Like a waterfall, each process phase cascades downward sequentially through five stages (requirements, design, implementation, verification, and maintenance).

The methodology comes from computer scientist Winston Royce’s 1970 research paper on software development. Although Royce never named this model “waterfall”, he gets credit for creating a linear, rigorous project management system.  

Unlike other methods, such as the Agile methodology, Waterfall doesn't allow flexibility. You must finish one phase before beginning the next. Your team can’t move forward until they resolve any problems. Moreover, as our introduction to project management guide outlines, your team can’t address bugs or technical debt if it’s already moved on to the next project phase.

What are the stages of the Waterfall methodology?

Five phases comprise the Waterfall methodology: requirements, design, implementation, verification, and maintenance. Let's break down the five specific phases of Waterfall development and understand why it’s critical to complete each phase before progressing to the next.

Requirements

The requirements phase states what the system should do. At this stage, you determine the project's scope, from business obligations to user needs. This gives you a 30,000-foot overview of the entire project. The requirements should specify:

  • resources required for the project.
  • what each team member will work on and at what stage.
  • a timeline for the entire project, outlining how long each stage will take. 
  • details on each stage of the process. 

But these requirements " may range from very abstract to a detailed mathematical specification ,” writes Steven Zeil , professor of computer science at Old Dominion University. That’s because requirements might not outline an exact implementation, and that’s something development addresses in later stages. 

After gathering all the requirements, it's time to move on to the design stage. Here, designers develop solutions that meet the requirements. In this stage, designers:

  • create schedules and project milestones.
  • determine the exact deliverables.  
  • create designs and/or blueprints for deliverables. 

Deliverables could include software or they could consist of a physical product. For instance, designers determine the system architecture and use cases for software. For a physical product, they figure out its exact specifications for production. 

Implementation

Once the design is finalized and approved, it's time to implement it. Design hands off their specifications to developers to build.

To accomplish this, developers:

  • create an implementation plan.
  • collect any data or research needed for the build.
  • assign specific tasks and allocate resources among the team. 

Here is where you might even find out that parts of the design that can't be implemented. If it's a huge issue, you must step back and re-enter the design phase.

Verification

After the developers code the design, it’s time for quality assurance. It’s important to test for all use cases to ensure a good user experience. That's because you don't want to release a buggy product to customers.

  • writes test cases.
  • documents any bugs and errors to be fixed.
  • tests one aspect at a time.
  • determines which QA metrics to track.
  • covers a variety of use case scenarios and environments.

Maintenance

After the product release, devs might have to squash bugs. Customers let your support staff know of any issues that come up. Then, it's up to the team to address those requests and release newer versions of your product.

As you can see, each stage depends on the one that comes before it. It doesn't allow for much error between or within phases.

For example, if a stakeholder wants to add a requirement when you're in the verification phase, you'll have to re-examine the entirety of your project. That could mean tossing the whole thing out and starting over.

Benefits of Waterfall methodology

The benefits of Waterfall methodology have made it a lasting workflow for projects that rely on a fixed outcome. A 2020 survey found that 56% of project professionals had used traditional, or Waterfall, models in the previous year.

A few benefits of Waterfall planning include:

  • Clear project structure : Waterfall leaves little room for confusion because of rigorous planning. There is a clear end goal in sight that you're working toward.
  • Set costs : The rigorous planning ensures that the time and cost of the project are known upfront.
  • Easier tracking : Assessing progress is faster because there is less cross-functional work. You can even manage the entirety of the project in a Gantt chart, which you can find in Jira.
  • A replicable process : If a project succeeds, you can use the process again for another project with similar requirements.
  • Comprehensive project documentation : The Waterfall methodology provides you with a blueprint and a historical project record so you can have a comprehensive overview of a project.
  • Improved risk management : The abundance of upfront planning reduces risk. It allows developers to catch design problems before writing any code.
  • Enhanced responsibility and accountability : Teams take responsibility within each process phase. Each phase has a clear set of goals, milestones, and timelines.
  • More precise execution for a non-expert workforce : Waterfall allows less-experienced team members to plug into the process.
  • Fewer delays because of additional requirements : Since your team knows the needs upfront, there isn't a chance for additional asks from stakeholders or customers.

Limitations of Waterfall methodology

Waterfall isn't without its limitations, which is why many product teams opt for an Agile methodology.

The Waterfall method works wonders for predictable projects but falls apart on a project with many variables and unknowns. Let's look at some other limitations of Waterfall planning:

  • Longer delivery times : The delivery of the final product could take longer than usual because of the inflexible step-by-step process, unlike in an iterative process like Agile or Lean.
  • Limited flexibility for innovation : Any unexpected occurrence can spell doom for a project with this model. One issue could move the project two steps back.
  • Limited opportunities for client feedback : Once the requirement phase is complete, the project is out of the hands of the client.
  • Tons of feature requests : Because clients have little say during the project's execution, there can be a lot of change requests after launch, such as addition of new features to the existing code. This can create further maintenance issues and prolong the launch.
  • Deadline creep : If there's a significant issue in one phase, everything grinds to a halt. Nothing can move forward until the team addresses the problem. It may even require you to go back to a previous phase to address the issue.

Below is an illustration of a project using the waterfall approach. As you can see, the project is segmented into rigid blocks of time. This rigidity fosters an environment that encourages developers, product managers, and stakeholders to request the maximum amount of time allotted in each time block, since there may be no opportunity to iterate in the future.

How is the Waterfall method different from Agile project management?

Agile project management and the Waterfall methodology have the same end goal: crystal clear project execution. While Waterfall planning isolates teams into phases, Agile allows for cross-functional work across multiple phases of a project. Instead of rigid steps, teams work in a cycle of planning, executing, and evaluating, iterating as they go. 

The " Agile Manifesto " explains the benefits of Agile over the Waterfall model:

  • Individuals and interactions over processes and tools
  • Working software over comprehensive documentation
  • Customer collaboration over contract negotiation
  • Responding to change by following a plan

If you're looking for tools that support Agile project management and serve the same end goal as Waterfall, consider Jira . It’s best suited for Agile projects, and helps you: 

  • Track work : With Gantt charts , advanced roadmaps , timelines, and various other tools, you can easily track your progress throughout the project.
  • Align your team : Tracking allows you to seamlessly plan across business teams, keeping everyone aligned on the same goals.
  • Manage projects and workflows : With Jira, you can access project management templates that you can use for your Agile workflows .
  • Plan at every stage : Jira Product Discovery , another product by Atlassian, offers product roadmaps for planning and prioritizing product features at every stage, from discovery to delivery.

Atlassian's Agile tools support the product development lifecycle. There are even Agile metrics for tracking purposes. Jira  lets you drive forward the Agile process. It uses intake forms to track work being done by internal teams and offers a repeatable process for requests.

These Jira products integrate natively within the app, unifying teams so they can work faster.

Use Agile methodology for project management

Waterfall methodology has a long history in project management, but it's often not the right choice for modern software developers. Agile methodology offers greater flexibility.

Here’s why most teams prefer an Agile process:

  • Adaptability to changes : If something arises, your team will be better able to adjust on the fly. Waterfall’s rigidity makes it difficult to deal with any roadblocks.
  • Continuous feedback loop : Continuous improvement requires a feedback loop. With Agile, you can gather feedback from stakeholders during the process and iterate accordingly. 
  • Stronger communication : Teams work collaboratively in an Agile process. Waterfall is a series of handoffs between different teams, which hinders effective communication. 

Here is where a project management tool such as Jira  comes in handy for an Agile methodology. You can also use a project management template for your Agile projects. Your team can plan, collaborate, deliver, and report on projects in one tool. That keeps everyone aligned throughout any project and streamlines project management.

Waterfall methodology: Frequently asked questions

Who is best suited for waterfall methodology.

The Waterfall methodology works best for project managers working on projects that include:

  • Less complex objectives : Projects that don't have complicated requirements are best suited for Waterfall.
  • Predictable outcomes : Waterfall works best for those projects that are replicable and proven.
  • Reduced likelihood of project scope creep : A project where clients aren't likely to come up with last-minute requirements is suitable for Waterfall.

Agile methodology is perfect for nimble teams with an iterative mindset, such as: 

  • Cross-functional teams : A team of people with different skill sets that allows them to work on various aspects of a project. These are collaborative types who are flexible.
  • Self-organizing teams : Autonomous teams that don't need a lot of handholding. They embrace ambiguity in a project and are great problem solvers. This mindset also gives them more ownership over outcomes.
  • Startups and small businesses : These benefit from the mindset of " move fast and break things ". So they can fail fast, learn, and improve.

Finally, Agile works well for customer-centric projects where their input allows you to iterate.

What factors should I consider before implementing a project management approach?

When deciding on the proper methodology to implement in project management, there are four main factors to consider: project complexity, organizational goals, team expertise, and stakeholder involvement.

Let’s break each one down: 

  • Project complexity : Waterfall can help break down larger, more complex projects into smaller sets of expectations and goals. But its rigidity doesn’t deal well with unknowns or changes. Agile is better for complex projects that have a lot of variables. 
  • Organizational goals : What does your organization want to achieve? Is it looking to innovate or keep the status quo? An Agile approach is best if your organization wants to break down silos. Teams will work more collaboratively with more autonomy.
  • Team expertise : Agile is an excellent way to go if your team is cross-functional and can work across skill sets. If your team members rely heavily on a singular skill set, Waterfall may be better. 
  • Stakeholder involvement : If your stakeholders are going to be more hands-on, Agile will help you best because it allows for continuous feedback and iteration. 

Get started building an agile workflow

Agile process flows help bring structure to scale your software development process. Learn more about workflow management to support your agile program.

Agile vs. waterfall project management

Agile project management is an incremental and iterative practice, while waterfall is a linear and sequential project management practice

The Waterfall Model in Large-Scale Development

  • Conference paper
  • Cite this conference paper

waterfall methodology research paper

  • Kai Petersen 10 , 11 ,
  • Claes Wohlin 10 &
  • Dejan Baca 10 , 11  

Part of the book series: Lecture Notes in Business Information Processing ((LNBIP,volume 32))

Included in the following conference series:

  • International Conference on Product-Focused Software Process Improvement

4727 Accesses

63 Citations

3 Altmetric

Waterfall development is still a widely used way of working in software development companies. Many problems have been reported related to the model. Commonly accepted problems are for example to cope with change and that defects all too often are detected too late in the software development process. However, many of the problems mentioned in literature are based on beliefs and experiences, and not on empirical evidence. To address this research gap, we compare the problems in literature with the results of a case study at Ericsson AB in Sweden, investigating issues in the waterfall model. The case study aims at validating or contradicting the beliefs of what the problems are in waterfall development through empirical research.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Unable to display preview.  Download preview PDF.

Royce, W.: Managing the development of large software systems: Concepts and techniques. In: Proc. IEEE WESCOM. IEEE Computer Society Press, Los Alamitos (1970)

Google Scholar  

Sommerville, I.: Software Engineering, 7th edn. Pearson Eductation Ltd., London (2004)

MATH   Google Scholar  

Raccoon, L.B.S.: Fifty years of progress in software engineering. SIGSOFT Softw. Eng. Notes 22(1), 88–104 (1997)

Article   Google Scholar  

Yin, R.K.: Case Study Research: Design and Methods, 3rd edn. Applied Social Research Methods Series, vol. 5. Prentice Hall, Englewood Cliffs (2002)

McBreen, P.: Software craftsmanship: the new imperative. Addison-Wesley, Boston (2002)

Pfleeger, S.L., Atlee, J.M.: Software engineering: theory and practice, 3rd edn. Prentice Hall, Upper Saddle River (2006)

Jarzombek, J.: The 5th annual jaws s3 proceedings (1999)

Thomas, M.: It projects sink or swim. British Computer Society Review 2001 (2001)

Johnson, J.: Keynote speech: Build only the features you need. In: Proceedings of the 4th International Conference on Extreme Programming and Agile Processes in Software Engineering (XP 2002) (2002)

Jones, C.: Patterns of Software Systems: Failure and Success. International Thomson Computer Press (1995)

Sametinger, J.: Software engineering with reusable components: with 26 tables. Springer, Berlin (1997)

Book   MATH   Google Scholar  

Anderson, D.J.: Agile Management for Software Engineering: Applying the Theory of Constraints for Business Results (The Coad Series). Prentice Hall PTR, Englewood Cliffs (2003)

Cohen, D., Larson, G., Ware, B.: Improving software investments through requirements validation. In: Proceedings of the 26th Annual NASA Goddard Software Engineering Workshop (SEW 2001), Washington, DC, USA, p. 106. IEEE Computer Society, Los Alamitos (2001)

Boehm, B.: Get ready for agile methods, with care. Computer 35(1), 64–69 (2002)

Karlström, D., Runeson, P.: Combining agile methods with stage-gate project management. IEEE Software 22(3), 43–49 (2005)

Download references

Author information

Authors and affiliations.

Blekinge Institute of Technology, Box 520, SE-37225, Ronneby, Sweden

Kai Petersen, Claes Wohlin & Dejan Baca

Ericsson AB, Box 518, SE-37123, Karlskrona, Sweden

Kai Petersen & Dejan Baca

You can also search for this author in PubMed   Google Scholar

Editor information

Editors and affiliations.

Fraunhofer IIESE, Fraunhoferplatz 1, 67663, Kaiserslautern, Germany

Frank Bomarius

Department of Information Processing Science, University of Oulu, P.O.Box 3000, 90014, Finland

Markku Oivo

VTT Technical Research Centre of Finland, Tietotie 3, 02150, Espoo, Finland

Päivi Jaring

Department of Computer Science, University of Helsinki, P.O.Box 68, 00014, Helsinki, Finland

Pekka Abrahamsson

Rights and permissions

Reprints and permissions

Copyright information

© 2009 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper.

Petersen, K., Wohlin, C., Baca, D. (2009). The Waterfall Model in Large-Scale Development. In: Bomarius, F., Oivo, M., Jaring, P., Abrahamsson, P. (eds) Product-Focused Software Process Improvement. PROFES 2009. Lecture Notes in Business Information Processing, vol 32. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-02152-7_29

Download citation

DOI : https://doi.org/10.1007/978-3-642-02152-7_29

Publisher Name : Springer, Berlin, Heidelberg

Print ISBN : 978-3-642-02151-0

Online ISBN : 978-3-642-02152-7

eBook Packages : Computer Science Computer Science (R0)

Share this paper

Anyone you share the following link with will be able to read this content:

Sorry, a shareable link is not currently available for this article.

Provided by the Springer Nature SharedIt content-sharing initiative

  • Publish with us

Policies and ethics

  • Find a journal
  • Track your research

Transition From Waterfall to Agile Methodology: An Action Research Study

Ieee account.

  • Change Username/Password
  • Update Address

Purchase Details

  • Payment Options
  • Order History
  • View Purchased Documents

Profile Information

  • Communications Preferences
  • Profession and Education
  • Technical Interests
  • US & Canada: +1 800 678 4333
  • Worldwide: +1 732 981 0060
  • Contact & Support
  • About IEEE Xplore
  • Accessibility
  • Terms of Use
  • Nondiscrimination Policy
  • Privacy & Opting Out of Cookies

A not-for-profit organization, IEEE is the world's largest technical professional organization dedicated to advancing technology for the benefit of humanity. © Copyright 2024 IEEE - All rights reserved. Use of this web site signifies your agreement to the terms and conditions.

  • Contact sales
  • Start free trial

The Ultimate Guide…

Waterfall Model

Brought to you by projectmanager, the online project planning tool used by over 35,000 users worldwide..

ProjectManager's Gantt chart, showing a waterfall project

What Is the Waterfall Methodology in Project Management?

The phases of the waterfall model, waterfall software development life cycle.

  • What Is Waterfall Software?
  • Desktop vs Online Waterfall Software

Must-Have Features of Waterfall Software

  • The Waterfall Model & ProjectManager.com

Waterfall vs. Agile

  • Pros & Cons of the Waterfall Model

Benefits of Project Management Software for Waterfall Projects

Waterfall methodology resources.

The waterfall methodology is a linear project management approach, where stakeholder and customer requirements are gathered at the beginning of the project, and then a sequential project plan is created to accommodate those requirements. The waterfall model is so named because each phase of the project cascades into the next, following steadily down like a waterfall.

It’s a thorough, structured methodology and one that’s been around for a long time, because it works. Some of the industries that regularly use the waterfall model include construction, IT and software development. As an example, the waterfall software development life cycle, or waterfall SDLC, is widely used to manage software engineering projects.

Related: 15 Free IT Project Management Templates for Excel & Word

Gantt charts are the preferred tool for project managers working in waterfall method. Using a Gantt chart allows you to map subtasks, dependencies and each phase of the project as it moves through the waterfall lifecycle. ProjectManager’s waterfall software offers these features and more.

A screenshot of the gantt chart interface in ProjectManager

Manage waterfall projects in minutes with ProjectManager— learn more .

The waterfall approach has, at least, five to seven phases that follow in strict linear order, where a phase can’t begin until the previous phase has been completed. The specific names of the waterfall steps vary, but they were originally defined by its inventor, Winston W. Royce, in the following way:

Requirements: The key aspect of the waterfall methodology is that all customer requirements are gathered at the beginning of the project, allowing every other phase to be planned without further customer correspondence until the product is complete. It is assumed that all requirements can be gathered at this waterfall management phase.

Design: The design phase of the waterfall process is best broken up into two subphases: logical design and physical design. The logical design subphase is when possible solutions are brainstormed and theorized. The physical design subphase is when those theoretical ideas and schemas are made into concrete specifications.

Implementation: The implementation phase is when programmers assimilate the requirements and specifications from the previous phases and produce actual code.

Verification: This phase is when the customer reviews the product to make sure that it meets the requirements laid out at the beginning of the waterfall project. This is done by releasing the completed product to the customer.

Maintenance: The customer is regularly using the product during the maintenance phase, discovering bugs, inadequate features and other errors that occurred during production. The production team applies these fixes as necessary until the customer is satisfied.

Related: Free Gantt Chart Template for Excel

Let’s hypothesize a simple project, then plan and execute it with the waterfall approach phases that you just learned. For our waterfall software development life cycle example, we’ll say that you’re building an app for a client. The following are the steps you’d take to reach the final deliverable.

Requirements & Documents

First, you must gather all the requirements and documentation you need to get started on the app.

  • Project Scope: This is one of the most important documents in your project, where you determine what the goals associated with building your app are: functional requirements, deliverables, features, deadlines, costs, and so on.
  • Stakeholder Expectations: In order to align the project scope with the expectations of your stakeholders—the people who have a vested interest in the development of the app—you want to conduct interviews and get a clear idea of exactly what they want.
  • Research: To better serve your plan, do some market research about competing apps, the current market, customer needs and anything else that will help you find the unserved niche your app can serve.
  • Assemble Team: Now, you need to get the people and resources together who will create the app, from programmers to designers.
  • Kickoff: The kickoff meeting is the first meeting with your team and stakeholders where you cover the information you’ve gathered and set expectations.

System Design

Next, you can begin planning the project proper. You’ve done the research, and you know what’s expected from your stakeholders . Now, you have to figure out how you’re going to get to the final deliverable by creating a system design. Based on the information you gathered during the first phase, you’ll determine hardware and software requirements and the system architecture needed for the project.

  • Collect Tasks: Use a work breakdown structure to list all of the tasks that are necessary to get to the final deliverable.
  • Create Schedule: With your tasks in place, you now need to estimate the time each task will take. Once you’ve figured that out, map them onto a Gantt chart , and diligently link dependencies. You can also add costs to the Gantt, and start building a budget.

Implementation

Now you’re ready to get started in earnest. This is the phase in which the app will be built and tested. The system from the previous phase is first developed in smaller programs known as units. Then each goes through a unit testing process before being integrated.

  • Assign Team Tasks: Team members will own their tasks and be responsible for completing them, and for collaborating with the rest of the team. You can make these tasks from a Gantt chart and add descriptions, priority, etc.
  • Monitor & Track: While the team is executing the tasks, you need to monitor and track their progress in order to make sure that the project is moving forward per your schedule.
  • Manage Resources & Workload: As you monitor, you’ll discover issues and will need to reallocate resources and balance workload to avoid bottlenecks.
  • Report to Stakeholders: Throughout the project, stakeholders need updates to show them progress. Meet with them and discuss a regular schedule for presentations.
  • Test: Once the team has delivered the working app, it must go through extensive testing to make sure everything is working as designed.
  • Deliver App: After all the bugs have been worked out, you’re ready to give the finished app to the stakeholders.

System Testing and Deployment

During this phase you’ll integrate all the units of your system and conduct an integration testing process to verify that the components of your app work properly together.

Once you verify that your app is working, you’re ready to deploy it.

Verification

Though the app has been delivered, the software development life cycle is not quite over until you’ve done some administrative tasks to tie everything up. This is technically the final step.

  • Pay Contracts: Fulfil your contractual obligations to your team and any freelance contractors. This releases them from the project.
  • Create Template: In software like ProjectManager, you can create a template from your project, so you have a head start when beginning another, similar one.
  • Close Out Paperwork: Make sure all paperwork has been rubber stamped and archived.
  • Celebrate: Get everyone together, and enjoy the conclusion of a successful project!

Maintenance

Of course, the nature of any software development project is that, through use by customers, new bugs will arise and must be squashed. So, past the verification stage, it’s typically expected that you will provide maintenance beyond launch. This is an ongoing, post-launch phase that extends for as long as your contract dictates.

What Is Waterfall Project Management Software?

Waterfall project management software is used to help you structure your project processes from start to finish. It allows managers to organize their tasks, sets up clear schedules in Gantt charts and monitor and control the project as it moves through its phases.

Project management training video (fgc8zj1dix)

A waterfall project is broken up into phases, which can be achieved on a Gantt chart in the waterfall project management software. Managers can set the duration for each task on the Gantt and link tasks that are dependent on one another to start or finish.

While waterfall software can be less flexible and iterative than more agile frameworks, projects do change frequently—and there must be features that can capture these changes in real-time with dashboards and reports, so that the manager can clear up bottlenecks or reallocate resources to keep teams from having their work blocked. Microsoft Project is one of the most commonly used project management software, but it has major drawbacks that make ProjectManager a great alternative .

Desktop vs Online Project Management Waterfall Software

When it comes to waterfall software, you can choose from either a desktop application or online, cloud-based project management software. This might not seem to be a big issue, but there are important distinctions between these two types of offerings.

That’s because there are differences between the two applications, and knowing those differences will help you make an informed decision.

Desktop waterfall software tends to have a more expensive up-front cost, and that cost can rise exponentially if you are required to pay per-user licensing fees for every member of your team.

Online waterfall software, on the other hand, is typically paid for on a subscription basis, and that subscription is usually a tiered payment plan depending on the number of users.

Connectivity

Online software, naturally, must be connected to the internet. This means your speed and reliability can vary depending on your internet service provider. It also means that if you lose connectivity, you can’t work.

Although the difference is minor, desktop waterfall software never has to worry about connection outages.

If security is a concern, rest assured that both options are highly secure. Desktop software that operates on a company intranet is nigh impenetrable, which can provide your company with a greater sense of security.

Strides in web security, like two-factor authentication and single-sign have made online, cloud-based waterfall software far more secure. Also, online tools have their data saved to the cloud, so if you suffer a crash on your desktop that might mean the end of your work.

Accessibility

Desktops are tied to the computers they are installed to or, at best, your office’s infrastructure. That doesn’t help much if you have distributed teams or work off site, in the field, at home and so on.

Online software is accessible anywhere, any time—so long as you have an internet connection. This makes it always accessible, but even more importantly, it delivers real-time data, so you’re always working on the current state of the project.

Waterfall software helps to organize your projects and make them run smoothly. When you’re looking for the right software to match your needs, make sure it has the following features.

Phases & Milestones icon

Keep Your Project Structured

Managing a project with the waterfall method is all about structure. One phase follows another. To break your project into these stages, you need an online Gantt chart that has a milestone feature. This indicates the date where one phase of the waterfall process stops and another begins.

Phases & Milestones image

Control Your Task and Schedule

The Gantt chart is a waterfall’s best friend. It organizes your tasks, sets the duration and links tasks that are dependent to keep work flowing later on. When scheduling, you want a Gantt that can automatically calculate your critical path to help you know how much float you have.

Dependencies & CPM image

Have Your Files Organized

Waterfall projects, like all projects, collect a lot of paperwork. You want a tool with the storage capacity to hold all your documents and make them easy to find when you need them. Also, attaching files to tasks gives teams direction and helps them collaborate.

Attachments image

Know If You’re on Schedule

Keeping on track means having accurate information. Real-time data makes it timely, but you also need to set your baseline and have dashboard metrics and reporting to compare your actual progress to your planned progress. This makes sure you stay on schedule.

Planned vs Actuals image

Get an Overview of Performance

Dashboards are designed to collect data and display it over several metrics, such as overall health, workload and more. This high-level view is important, so you want to have a feature that automatically calculates this data and doesn’t require you to manually input it.

Dashboards image

Make Data-Based Decisions

Reports dive deeper into data and get more details on a project’s progress and performance. Real-time data makes them accurate. Look for ease of use—it should only take a single click to generate and share. You’ll also want to filter the results to see only what you’re interested in.

Reports image

The Waterfall Model & ProjectManager

ProjectManager is an award-winning project management software that organizes teams and projects. With features such as online Gantt charts, task lists, reporting tools and more, it’s an ideal tool to control your waterfall project management.

Sign up for a free 30-day trial and follow along to make a waterfall project in just a few easy steps. You’ll have that Gantt chart built in no time!

1. Upload Requirements & Documents

Waterfall project management guarantees one thing: a lot of paperwork. All the documentation and requirements needed to address for the project can quickly become overwhelming.

You can attach all documentation and relevant files to our software, or directly on a task. Now, all of your files are collected in one place and are easy to find. Don’t worry about running out of space—we have unlimited file storage.

2. Use a Work Breakdown Structure to Collect Tasks

Getting to your final deliverable will require many tasks. Planning the waterfall project means knowing every one of those tasks, no matter how small, and how they lead to your final deliverable. A work breakdown structure is a tool to help you figure out all those steps.

To start, use a work breakdown structure (WBS) to collect every task that is necessary to create your final deliverable. You can download a free WBS template here . Then, upload the task list to our software.

A screenshot of a gantt chart in ProjectManager

3. Open in Gantt Project View

Gantt charts are essential project management tools used for planning and scheduling. They collect your tasks in one place on a timeline . From there, you can link dependencies, set milestones, manage resources and more.

In the software, open the Gantt chart view and add deadlines, descriptions, priorities and tags to each task.

4. Create Phases & Milestones

Milestones are what separates major phases in a waterfall method project. Waterfall methodology is all about structure and moving from one phase to the next, so breaking your project into milestones is key to the waterfall method.

In the Gantt view, create phases and milestones to break up the project. Using the milestone feature, determine when one task ends and a new one begins. Milestones are symbolized by a diamond on the Gantt.

5. Set Dependencies in a Gantt Chart

Dependent tasks are those that cannot start or finish until another starts or finishes. They create complexities in managing any waterfall project.

Link dependent tasks in the Gantt chart. Our software allows you to link all four types of dependencies: start-to-start, start-to-finish, finish-to-finish and finish-to-start. This keeps your waterfall project plan moving forward in a sequential order and prevents bottlenecks.

6. Assign From Gantt Charts

Although you’ve planned and scheduled a project, it’s still just an abstraction until you get your team assigned to execute those tasks. Assigning is a major step in managing your waterfall project and needs to happen efficiently.

Assign team members to tasks right from the Gantt chart. You can also attach any related images or files directly to the task. Collaboration is supported by comments at the task level. Anyone assigned or tagged will get an email alert to notify them of a comment or update.

ProjectManager's Gantt charts are ideal for waterfall project management

7. Manage Resources & Workload

Resources are anything you need to complete the project. This means not only your team, but also the materials and tools that they need. The workload represents how many tasks your team is assigned, and balancing that work keeps them productive.

Keep track of project resources on the Workload view. See actual costs, and reallocate as needed to stay on budget. Know how many tasks your team is working on with easy-to-read color-coded charts, and balance their workload right on the page.

A screenshot of ProjectManager’s resource management window, each team member has a row that shows their workload

8. Track Progress in Dashboard & Gantt

Progress must be monitored to know if you’re meeting the targets you set in your waterfall method plan. The Gantt shows percentage complete, but a dashboard calculates several metrics and shows them in graphs and charts.

Monitor your project in real time and track progress across several metrics with our project dashboard . We automatically calculate project health, costs, tasks and more and then display them in a high-level view of your project. Progress is also tracked by shading on the Gantt’s duration bar.

ProjectManager’s dashboard view, which shows six key metrics on a project

9. Create Reports

Reporting serves two purposes: it gives project managers greater detail into the inner-workings of their waterfall project to help them make better decisions, and acts as a communication tool to keep stakeholders informed.

Easily generate data-rich reports that show project variance, timesheets , status and more. Get reports on your planned vs. the actual progress. Filter to show just the information you want. Then, share with stakeholders during presentations and keep everyone in the loop.

A screenshot of a project report generated by ProjectManager

10. Duplicate Plan for New Projects

Having a means to quickly copy projects is helpful in waterfall methodology, as it jumpstarts the next project by recreating the major steps and allowing you to make tweaks as needed.

Create templates to quickly plan any recurring waterfall projects. If you know exactly what it takes to get the project done, then you can make it into a template. Plus, you can import proven project plans from MSP, and task lists from Excel and Word.

The waterfall methodology is one of two popular methods to tackle software engineering projects; the other method is known as Agile .

It can be easier to understand waterfall when you compare it to Agile. Waterfall and Agile are two very different project management methodologies , but both are equally valid, and can be more or less useful depending on the project.

Waterfall Project Management

If the waterfall model is to be executed properly, each of the phases we outlined earlier must be executed in a linear fashion. Meaning, each phase has to be completed before the next phase can begin, and phases are never repeated—unless there is a massive failure that comes to light in the verification or maintenance phase.

Furthermore, each phase is discrete, and pretty much exists in isolation from stakeholders outside of your team. This is especially true in the requirements phase. Once the customer’s requirements are collected, the customers cease to play any role in the actual waterfall software development life cycle.

Agile Project Management

The agile methodology differs greatly from the waterfall approach in two major ways; namely in regards to linear action and customer involvement. Agile is a nimble and iterative process, where the product is delivered in stages to the customer for them to review and provide feedback.

Instead of having everything planned out by milestones, like in waterfall, the Agile software development method operates in “sprints” where prioritized tasks are completed within a short window, typically around two weeks.

These prioritized tasks are fluid, and appear based on the success of previous sprints and customer feedback, rather than having all tasks prioritized at the onset in the requirements phase.

Understanding the Difference Between Waterfall & Agile

The important difference to remember is that a waterfall project is a fixed, linear plan. Everything is mapped out ahead of time, and customers interact only at the beginning and end of the project. The Agile method, on the other hand, is an iterative process, where new priorities and requirements are injected into the project after sprints and customer feedback sessions.

Pros & Cons of the Waterfall Project Management

There are several reasons why project managers choose to use the waterfall project management methodology. Here are some benefits:

  • Project requirements are agreed upon in the first phase, so planning and scheduling is simple and clear.
  • With a fully laid out project schedule , you can give accurate estimates for your project cost, resources and deadlines.
  • It’s easy to measure progress as you move through the waterfall model phases and hit milestones.
  • Customers aren’t perpetually adding new requirements to the project, which can delay production.

Of course, there are drawbacks to using the waterfall method as well. Here are some disadvantages to this approach:

  • It can be difficult for customers to articulate all of their needs at the beginning of the project.
  • If the customer is dissatisfied with the product in the verification phase, it can be very costly to go back and design the code again.
  • A linear project plan is rigid, and lacks flexibility for adapting to unexpected events.

Although it has its drawbacks, a waterfall project management plan is very effective in situations where you are encountering a familiar scenario with several knowns, or in software engineering projects where your customer knows exactly what they want at the onset.

Using a project management software is a great way to get the most out of your waterfall project. You can map out the steps and link dependencies to see exactly what needs to go where.

As illustrated above, ProjectManager is made with waterfall methodology in mind, with a Gantt chart that can structure the project step-by-step. However, we have a full suite of features, including kanban boards that are great for Agile teams that need to manage their sprints.

With multiple project views, both agile and waterfall teams and more traditional ones can work from the same data, delivered in real time, only filtered through the project view most aligned to their work style. We take the waterfall methodology and bring it into the modern world.

Now that you know how to plan a waterfall project, give yourself the best tools for the job. Take a free 30-day trial and see how ProjectManager can help you plan with precision, track with accuracy and deliver your projects on time and under budget.

Start My Free Trial

  • Gantt Chart Software
  • Project Planning Software
  • Project Scheduling Software
  • Requirements Gathering Template
  • Gantt Chart Template
  • Change Request Form
  • Project Management Trends (2022)
  • SDLC – The Software Development Life Cycle
  • IT Project Management: The Ultimate Guide
  • Project Management Methodologies – An Overview
  • Project Management Framework Types, Key Elements & Best Practices

Start your free 30-day trial

Deliver faster, collaborate better, innovate more effectively — without the high prices and months-long implementation and extensive training required by other products.

What Is the Waterfall Methodology?

waterfall methodology research paper

The waterfall methodology is an approach used by software and product development teams  manage projects. The methodology separates the different parts of the project into phases specifying the necessary activities and steps. For example, at the beginning of the project, the waterfall methodology focuses on gathering all requirements from stakeholders that project team members will later use to design and implement the product. 

However, waterfall has its, well…downfalls, which I’ll discuss in more detail below. In short, waterfall may not be suitable for every development process and you can find modified or extended versions of the waterfall methodology that try to solve some of these issues. 

One example of an extended version of the waterfall methodology is the V-model . A key distinction of the V-model from the original Waterfall methodology is its emphasis on validation and testing during the entire project duration, as opposed to only testing after an implementation phase.

More From This Expert What Is JSON?

What Is the Waterfall Methodology in Software Engineering?

The waterfall methodology is a software development life cycle (SDLC) model used to build software projects. 

One thing that distinguishes waterfall from other SDLC models (like Agile ) is that phases are performed sequentially. In other words, the project team must complete each phase in a specific order. If you look at the diagram below, you can see the flow is similar to a waterfall.

waterfall methodology diagram of the waterfall methodology steps: system requirements; software requirements; analysis; program design; coding; testing; operations

Working with SDLC models often includes additional software to keep track of planning, tasks and more. So it’s possible to find tools designed to support the waterfall methodology’s specific workflow, for example.

What Are the Different Phases of the Waterfall Methodology? 

The waterfall methodology was one of the first established SDLC models. In fact, waterfall dates back to 1970 when Dr. Winston W. Royce described it in “ Managing the Development of Large Software Systems .” However, we should note that Royce didn’t refer to the methodology as “waterfall” in the paper. The waterfall nomenclature came later. In his original paper, Royce specified the following phases.

7 Stages of the Waterfall Model

  • System requirements 
  • Software requirements
  • Program design

The system and software requirement phase involves gathering and documenting the requirements defining the product. This process typically involves stakeholders such as the customer and project managers. The analysis phase involves steps such as analyzing the requirements to identify risks and documenting strategies.

The design phase focuses on designing architecture, business logic and concepts for the software. The design phase is followed by the coding phase which involves writing the source code for the software based on the planned design.

The testing phase concerns testing the software to ensure it meets expectations. The last phase, operations , involves deploying the application as well as planning support and maintenance.

Advantages of the Waterfall Methdology

Waterfall provides a systematic and predictable framework that helps reconcile expectations, improve planning, increase efficiency and ensure quality control. What’s more, waterfall documentation provides an entry for people outside the project to build on the software without having to rely on its creators, which is helpful if you need to bring in external assistance or implement changes to the project team.

Disadvantages of the Waterfall Methodology

The structural limitations of the waterfall methodology may introduce some problems for projects with many uncertainties. For instance, the methodology’s linear flow requires that each phase be completed before moving on to the next, which means the methodology doesn’t support revisiting and refining data based on new information that may come later in the project life cycle. A specific example of this limitation is the methodology’s focus on defining all requirements at the beginning of the project. After all, stakeholders may not know everything about the project at the very start or they may change their opinion later about what the product should actually do or what customer segment they’re trying to serve. 

On the other hand, a project with well-defined and stable requirements may benefit from waterfall because it ensures the establishment and documentation of the requirements as soon as possible.

Another disadvantage of the waterfall methodology can be the late implementation of the actual software, which may result in a product not correlating with stakeholders’ expectations. For example, if the developers have misunderstood the customer’s idea about a specific feature due to poorly defined requirements, the final product will not behave as expected. Late testing can also lead to finding systemic problems too late in the project’s development when it’s more difficult to correct the design.

More From the Built In Tech Dictionary What Is Agile?

Waterfall Methodology vs. Agile

Another approach to software development is the Agile methodology . Agile is more flexible and open to changes than waterfall, which makes Agile more suitable for projects affected by rapid changes.

Waterfall methodology diagram of the Agile methdology which is more cyclical and iterative in nature than waterfall

A key difference between the two methodologies is the project’s flow. While waterfall is a linear and sequential approach, Agile is an iterative and incremental approach. In practice this means that software created using Agile has development phases we perform several times with smaller chunks of implemented functionality. 

The two methodologies also have different approaches to testing . The waterfall methodology tests implementation very late in the process while Agile integrates tests for each iteration.

Another key difference is the two methodologies’ approach to stakeholders. When we use waterfall, the customer doesn’t see the implemented software until quite late in the project. When we use Agile, customers have the opportunity to follow the progress along the way.

Which methodology you choose will come down to the project’s context. Stable and well-defined projects may benefit more from the waterfall methodology and other projects affected by rapid changes may benefit more from Agile.

Built In’s expert contributor network publishes thoughtful, solutions-oriented stories written by innovative tech professionals. It is the tech industry’s definitive destination for sharing compelling, first-person accounts of problem-solving on the road to innovation.

Great Companies Need Great People. That's Where We Come In.

  • Contact HETS

Connect with HETS

waterfall methodology research paper

Waterfall method: A Necessary Tool for Implementing Library Projects

Written by HETS Admin on July 30, 2014 . Posted in English , Spring Issue: March 2011 , Volume I

Waterfall method: a necessary tool for implementing library projects

Carlos A. Crespo-Santiago

Consorcio de Bibliotecas Metropolitanas (COBIMET)

Sonia de la Cruz Dávila Cosme

Universidad de Puerto Rico- Recinto de Cayey

This paper describes a methodology for implementing effectively library projects. The authors explain how the Waterfall Method for information system development and organizational design, created by Winston W. Royce can be applied to library projects. The proposed adaptation of the method for library projects is presented in stages; where each stage has a set of activities that produce deliverables that serve as evidence documentation for management or governing agencies.  The stages are given a percentage to establish relevance and a basis to inform progress to top management. The benefits of applying the Waterfall Methodology include maintaining the scope of a project within the requirements and needs of all stakeholders; establishing cost control and time management for all the required activities; and provide documented evidence of the activities that govern the project. . It can be applied to every project and discipline, including education. The technique itself is so flexible that it could be used to manage research proposals, investigations, and even operational plans, but as in library sciences, the lack of information in the educational area present some challenges to this method followers 

Introduction

The purpose of this paper is to propose a methodology for implementing effectively library projects. The primary emphasis of the methodology is to provide a project management strategy that will fit most library projects.  The basis of the methodology will be based on the Waterfall Method for information system development and organizational design, created by Winston W. Royce in 1970 (Royce, 1970, p. 328).

Today, librarians implement better services for providing resources through the internet and on-site physically to their users.  In traditional and digital libraries, services include access to informational resources like books, journals, magazines, videos, audio media, maps and historical archives (Digital Libraries, 2003).  Also, services like electronic reference, e-reserves and electronic interlibrary loans are becoming increasingly implemented by libraries. Furthermore, the need to market those services and resources has turned them to social networks by using Web 2.0 tools for help.

Libraries can manage the implementation of new procedures and projects by using project management methodologies. According to Winston and Hoffman (2005) project management methods can help libraries administrators to ensure the most efficient and effective use of resources and the completion of projects (p. 60). The completion of project activities requires a series of different and diverse skills, and having a structured methodology is necessary for setting the project environment (Cerrone, 2007, p. 23).

This paper will describe the Waterfall Methodology for information system development in terms of organization design, and its use in project management.  After examining this methodology, we then propose a library project management strategy based on the Waterfall Methodology.

Waterfall Methodology for Information Systems Development

The design of an information or computer system requires considerable organization and management; a planned approach needs to be taken to define how the development and implementation needs to be performed (‘Systems design and life cycle’, 2008). Winston and Hoffman (2005) explain the Waterfall Methodology applies the principle that the development process should be divided into phases to provide clarity of content.  Results of each phase are documented and the next phase only begins when all pre-requisites are satisfied. It is not permitted to return to a previous phase, once another has started unless the implementation requirements change. The project is completed when all phase gate reviews are satisfied.  Requirements change must be tracked and controlled so as to reduce scope creep.

The phases for a development of a system using the Waterfall Method are typically as follows (Systems design and life cycle, 2008):

  • Feasibility study: benefits, cost estimates, effectiveness from a new or improved system need to be determined.
  • System requirements: existing system is analyzed and requirement specifications from the system owner are gathered.
  • System design: involves the technical specification produced for the new system based on requirements.
  • Design Implementation: work begins on the development or production of the new or improved system.
  • Testing and Installation: protocols for testing verification and proper installation are performed.
  • Maintenance: after the system is implemented, operational modifications could be made to fit new requirements.

The successful implementation of an information systems project or any other project will be based on answering effectively the following questions:

Is the system acceptable to the customer?

Was it delivered according to schedule?

Did the project ended within the agreed budget?

Did the system development process have a minimal impact on ongoing operations?

Why use the Waterfall Method instead of other methods for Library Projects

According to Cerrone (2007), the  Project Management Body of Knowledge  (PMBOK) developed by the Project Management Institute approximately 20 years ago, is the definitive methodology for theory and practice. Adherence to the PMBOK method assures a successful implementation.  The PMBOK method establishes that during the course of a project, activities occur within the following five process groups:

  • Initiating processes which focus on gaining authorization of a project or one of its phases.
  • Planning processes that define objectives and select courses of action that will be used to effect project goals.
  • Executing processes used to coordinate activities, staff, and other resources in order to put the plan into action.
  • Controlling processes which provide the context for measurement and monitoring of project results in order to prevent variance from the plan or correct the course of action when a variance occurs.
  • Closing processes that formalize the acceptance of the project and end the project activities.

The detailed activities that fall within the five process groups are 44 different in total.  Furthermore, detailed tasks can be applied differently depending on the objective.

The biggest difference between PMBOK and the Waterfall method is complexity. PMBOK is better suited for large scale projects and requires experience and the ability to apply specific activities to diverse processes in order to manage the project efficiently (Cervone, 2007). On the other hand, the Waterfall Method is simple and convenient while allowing the flexibility for managing both, large scale and small scale projects.

Oura and Kijima (2001) explain that the waterfall method is employed top down in the sense that the development process can only proceed if management approves each phase.  This could be an issue if the organization is a bottom-up and changes come from lower level personnel.  The simple process that the Waterfall method provides makes it ideal for libraries project management.

Waterfall Method for Library Project Management

The Waterfall Method divides the development process by phases.  The proposed adaptation of the method for library projects will be presented in the following stages: plan, design, implementation and operations. Each stage has a set of activities that produce deliverables that serve as evidence documentation for management or governing agencies.  The stages are given a percentage to establish relevance and a basis to inform progress to upper management.

In the Plan Stage, the scope of the library’s project is discussed an analyzed.  There is a need to establish the project feasibility, user requirements, map the current process, establish the team charter and get the buying from management. This stage corresponds to the Feasibility Phase and Requirements Specification described in the Waterfall Methodology.

Activities and Deliverables during the Planning Phase

In the Design Stage, specifications described in the user requirements to be processed are designed.  The library systems procedures or guidelines, communication plan with end users and measurements that will show improvement are developed.  This stage corresponds with the design phase in the Waterfall Methodology.

Activities and deliverables during the Design Phase

The Implementation Stage requires the library system to be installed or commissioned for testing by end user.  The end user is then presented with the procedures and training developed for them to test the system.  This stage comprises the implementation of design, testing and installation in the Waterfall Methodology.

Activities and deliverables during the Implementation Phase

The Operation Stage refers to the formal use by library system’s end user.  The library system needs to be monitored for ensuring compliance with requirements specification.  Provide a presentation to management to close the project and archive documentation for evidence.  This stage is more comprehensive than the Waterfall Methodology as it comprises system compliance and operation and maintenance.

Activities and deliverables during the Operations Phase

As we can see, the Waterfall method is very simple. It can be applied to every project and discipline, including education. The technique itself is so flexible that it could be used to manage research proposals, investigations, and even operational plans, but as in library sciences, the lack of information in the educational area present some challenges to this method followers.  Koskela and Howell (2002) present that:

The lack of theory has rendered education and training more difficult and has hampered effective professionalization of project management. Lacking theory, project management cannot claim, and will not be granted a permanent and respected place in higher education institutions. Also, the lack of an explanation of project management, to be provided by a theory, has slowed down the diffusion of project management methods in practice (p. 12).

There is a vast amount of information of project management methods, especially in the areas of engineering, software development, construction, architecture and telecommunications. Project management itself has been transformed through the decades by these disciplines, but the application of project management methods are more used in the industry by practitioners, rather than by educators (Hoon-Kwak & Ambari, 2009; Koskela & Howell, 2002). This presents a dichotomy between practice and scholarship because practitioners are using project management methods on a daily basis but higher education institutions are not using it as much as we expect. Further research and analysis has to be done in order to establish why scholars are not taking advantage of project management methods in the academy.

Conclusions

The present paper proposed the application of the Waterfall Methodology to library projects.  Library and information science professionals could implement this staged based approach to their projects.

The benefits of applying the Waterfall Methodology in libraries can help administrators to: 1) maintain the scope of a project within the requirements and needs of all stakeholders; 2) establish cost control and time management for all the activities required; and 3) obtain documented evidence of the activities that govern projects. The literature review shows that there was no research publications identified that applied the Waterfall Methodology to Library projects and education. Future research can be performed using the methodology and applying it to a specific library or educational project.

Cervone,  H. F.  (2007). Standard methodology in digital library project management.  OCLC

Systems and Services, 23 (1), 30-34.  DOI: 10.1108/10650750710720748.

‘Digital Libraries’. (2003). In  Encyclopedia of Computer Science . Retrieved from

http://www.credoreference.com/entry/encyccs/digital_libraries

Hoon-Kwal, Y, & Anbari, F.T. (2009). Availability-impact analysis of project management

trends: perspectives from allied disciplines.  Project Management Journal, 40 (2), p.94-

103. DOI: 10.1002/pmj.20111.

Koskela, LJ, & Howell, G 2002,  The underlying theory of project management is obsolete,  I n:

The PMI Research Conference, June 2002, Seattle, Washington. Retrieved from

http://usir.salford.ac.uk/9400/1/2002_The_underlying_theory_of_project_management_is

_obsolete.pdf

Oura, J., & Kijima, K. (2002). Organization design initiated by information system

development: a methodology and its practice in Japan.  Systems Research and Behavioral Science, 19 (1), 77.  DOI:10.1002/sres.415.

Royce, W. W (1970).   Managing the Development of Large Software Systems .  Retrieved

January 11, 2011, from http://www.cs.umd.edu/class/spring2003/cmsc838p/Process/waterfall.pdf

‘Systems design and life cycle’. (2008).  In BCS Glossary of Computing and ICT . Retrieved from

http://www.credoreference.com/entry/bcscompict/systems_design_and_life_cycle

Trackback from your site.

Leave a comment

  • Call for Articles
  • Review Process

waterfall model Recently Published Documents

Total documents.

  • Latest Documents
  • Most Cited Documents
  • Contributed Authors
  • Related Sources
  • Related Keywords

The Development of Interactive E-Book of Local History for Senior High School in Improving Local Wisdom and Digital Literacy

<p style="text-align: justify;">This study discusses students’ responses and perceptions on the e-book of Local History of West Java (Indonesia) developed by the researchers. It uses a Research and Development approach and experimental method. Data collection techniques used in this study are observation, interviews, and focus group discussions with interactive model data analysis. The research subjects were students and teachers of high schools in West Java. They were taken as the subjects as they can represent the region. The History E-book is, however, published on ebooksejarah.id page while the system was developed by using SDLC (Software Development Life Cycle) Waterfall model. The results of the study indicate that the components of the e-book on the aspects of the materials, presentation, and completeness are overall suitable to be used by students. The materials are considered to be still inapplicable and not contextual. Further, they are still lack of latest issues as well as photos/illustrations. The study of student responses on the e-book reinforces that the zoomers (those belong to Generation Z) prefer to digital learning media because their social life belongs to the online world. Local history e-books should better adapt to the learning style of Generation Z, who prefer visuals and hands-on experiences to reading texts. Thus, e-book development needs to be equipped with various learning media in short audios and video explainers, animations, and infographics.</p>

A Quantitative Study of Waterfall and Agile Methodologies With the Perspective of Project Management

Software engineering is used in order to develop larger and complex software products. As software product is needed in almost all the industries, software engineering becomes really important. Software development can be done through various software development life cycle (SDLC) models like waterfall model, agile model, spiral model, prototype model, etc. SDLC is a framework that defines the tasks that to be performed at each step in the development process. Authors are mainly focusing on two models (i.e., waterfall and agile model). Waterfall model is a serial model which follows a strict sequence. Agile methodology can be divided into scrum methodology and extreme programming. Scrum methodology mainly focuses on how to manage tasks in a team-based environment. Scrum consists of three main roles. They are scrum master, product owner, and scrum team. While comparing both the models, the main difference obtained is waterfall does not allow any customer involvement while agile does allow it.

Aplikasi Augmented Reality sebagai Media Pembelajaran Pengenalan Bahasa Inggris Berbasis Android untuk Anak Sekolah Dasar (Studi Kasus SDN 2 Kutanagara)

Penggunaaan metode pembelajaran yang kurang menyenangkan atau monoton pada pembelajaran usia enam sampai tujuh tahun membuat siswa menjadi tidak fokus dan kurang perhatian terhadap mata pelajaran itu sendiri. Padahal penggunaan media pembelajaran ini sangat bermanfaat untuk membantu siswa dalam meningkatkan minat belajar, pemahaman dan ketertarikan terhadap materi. Terlebih lagi pembelajaran Bahasa Inggris, dimana Bahasa inggris sulit dipahami. Penelitian memanfaatkan augmented reality sebagai media pembelajaran. Sebagai implikasi dari pembuatan aplikasi diantaranya untuk menarik fokus, perhatian siswa dan lebih tertarik terhadap minat belajar. Serta memudahkan para guru atau orang tua, sehingga lebih mudah menjelaskan proses pembelajaran bahasa Inggris kepada siswa. Selain itu mampu menciptakan suasana belajar yang lebih menyenangkan. Pengembangan software menggunakan metode SDLC (System Development Life Cycle) dengan model Linear sequential model atau yang biasa disebut Waterfall Model. Hasil Penelitian ini adalah sebuah aplikasi augmented reality sebagai media pembelajaran yang menyenangkan dan dapat meningkatkan pemahaman, ketertarikan siswa terhadap materi yang diberikan.

Room Borrowing Information System Website Based using PHP and MySQL with Waterfall Model

Research by developing an information system is a research that aims to produce and develop an information service system design in the form of website-based rooms lending using PHP as a programming language and MySQL as a database that will be used at the Faculty of Teacher Training and Education, Sultan Ageng Tirtayasa University in-room management as room loan, room loan schedule, room loan data, and room information. This study uses the waterfall development model, with 5 (five) stages of development including the stages of communication, planning, modelling, construction and deployment. This research used Alpha and Beta testing to 3 (three) media experts and 31 (thirty-one) users including 1 (one) admin and 30 (thirty) students. Data collection techniques using interview techniques, observation and dissemination of research instruments. With data analysis in the form of a feasibility test using a Likert scale instrument of 4 (four) assessment scores to media experts and respondents. The final product produced is a website for rooms loaning information system, by average score by media experts (Alpha Testing) of 71.6 with the "very feasible" category. The results of the feasibility test by users (Beta Testing) were 34.32 with the "very feasible" category. Therefore, it can be concluded that the website-based room loan information system is very feasible to use.

Developing A Supply Chain Of Apple Processed Product Traceability Information System Based On Smart Packaging And Digital Business Ecosystems

Apples are one of the fruits that much post-harvest processing can do. Apples can be processed into drinks or snacks. The need for information about nutritional content is needed by consumers. Therefore, a traceability information system is needed that can enable consumers to know the nutritional content involved. This research uses the Waterfall model information system development method and the Unified modeling language (UML). This method allows for the sequential development of information systems. The results of this research will be in the form of an information system that has been tested using the Requirement Traceability Matrix (RTM) and Response for a Class (RFC) method. The resulting Response for a Class (RFC) value is 5.17, meaning that this information system will be easy to adapt later

Aplikasi Web Commerce sebagai Ruang Praktik Mahasiswa dalam Berwirausaha

Entrepreneurship is one of the subjects that must be taken by students of Universitas Negeri Padang (UNP), including students from Faculty of Tourism and Hospitality. Students sometimes have less interest and motivate in taking entrepreneurship courses in practice because they still only use conventional methods. The purpose of this research is to create a web commerce application that will be used by students as an entrepreneurship practices space. The method that used in making this application is the waterfall model with the SLDC method or a simple software life flow approach. Web commerce application that produced then tested using black box to find out the success of the flow that has been designed, and the black box test results show that the application can run well. The result of this research is a dynamic web-based e-commerce application using the PHP programming language, osCommerce Content Management System (CMS), and MySQL database. This application can be a solution to the problems of conventional entrepreneurial methods and can make students who take entrepreneurship courses more interested in entrepreneurship practices.

Perancangan Sistem Informasi Supply Chain Management Pengadaan Barang Perlengkapan Penanganan Covid-19.

The Supply Chain Management Information System combines several business processes across organizations from the initial organization to the end user. In the procurement of raw materials, the procurement of Covid-19 takes time and causes inventory. With the Supply Chain Management Information System, it is expected to simplify the procurement process and minimize shortages of goods so as to speed up patient handling. This study resulted in the design of an SCM information system that uses the waterfall model software development method which is useful for helping the health industry get the flow of information, goods, and money because the related parties have been integrated with the designed system.

Mapping application for Greater Bandung Area using Web Technology

Mapping is needed to determine the condition of spatial data and non-spatial data from an area. This research produces a mapping application based on geographic information systems that display spatial data and boundaries of 888 villages located in the Greater Bandung Area, which consists of Bandung City, Cimahi City, Bandung Regency, West Bandung Regency, and Sumedang Regency. The method used is the Software Development Life Cycle with Waterfall model. The technology used is the application programming interface from Openstreet MapBox and ArcGIS. Based on testing applications that can access online found that the application built can 100% display the mapping of all areas in the Greater Bandung Area to the district level. This research is useful for developing the tourism and creative industries of MSMEs based on each region's geographical conditions, both for the community and the government.

DESIGN OF WEB-BASED UYU STORE ATTENDANCE INFORMATION SYSTEM USING COLORING METHOD

Attendance in the world of work is sometimes still done manually. At the Uyu shop, there are still problems that occur in recording and making attendance reports manually, such as mistakes in biodata, forgetting to record the date. Because the Uyu store still doesn't use a computerized employee or staff absence information system in managing data, so the information that can be processed is quite long and storage is not guaranteed safe. The purpose of this researcher is to create an information system that can manage attendance data for employees who work at the computerized Uyu Store and also implement a coloring method on attendance reports that generate reports based on the attendance coloring method according to employee attendance hours that are easy to understand. This method uses the coloring method as a solution to solving problems that can be solved in the greedy method, namely the color problem and the waterfall model as a system development process that uses UML design. The result of this research is that the system can operate attendance data collection as well as report employee data more efficiently and integrated.

ANALYSIS AND DESIGN OF MOBILE WEB-BASED MENU E-ORDER SYSTEMS USING THE PIECES METHOD (CASE STUDY: CAFÉ 50/50 COFFEE)

Café as a place to relax or chatter where visitors can order the menu available. In general, a café often has difficulty in serving customers, especially for menu ordering facilities. This is also experienced by café 50/50 Coffee which still makes menu reservations manually. Based on these problems, a system of e-order menus of web-based mobile applications is designed. The study aims to produce a mobile web ordering system that is then analyzed with the PIECES indicator to determine the level of user satisfaction. Design of this system using the waterfall model System Development Life Cycle (SDLC) development method and then analyzed the level of user satisfaction with the PIECES method. System testing uses usability testing with the USE Questionnaire method. System implementations are created with the help of the CodeIgniter framework and use the PHP programming language. The results of the study in the form of a menu e-order system at the 50/50 Coffee café with the conclusion of the analysis that the users of the e-order system were “SATISFIED”.

Export Citation Format

Share document.

Academia.edu no longer supports Internet Explorer.

To browse Academia.edu and the wider internet faster and more securely, please take a few seconds to  upgrade your browser .

Enter the email address you signed up with and we'll email you a reset link.

  • We're Hiring!
  • Help Center

paper cover thumbnail

Waterfall Model: The Scientific Method of Software Engineering

Profile image of Mohammad Mushfequr Rahman

Related Papers

IJESRT Journal

This investigation deals with a vital and critical matter in computer world. It is concerned with the development process of software. This target can be achieved with the help of various software development models available. The development models are tools that allow us to correctly follow the steps to create software that meets a business need. There are different SDLC models with their respective pros and cons. In IT world all these methodologies are incorporated .Any model is implemented by taking in context every aspect and proper confidentiality and integrity. Availability controls are planned and built into software application right through the software lifecycle. Currently, the use of, awareness in, and controversy about agile methodologies have realized dramatic growth. We have described the attributes of some traditional and agile methodologies that are far and wide used in software development. We have also discussed the strengths and weakness between the two opposing methodologies and provided the challenges associated with implementing agile processes in the software industry.

waterfall methodology research paper

Now days the choice of right software development life cycle (SDLC) has become big challenge for the organizations which are involved in the development of software(s). There are number of models like Waterfall, Prototyping, Spiral etc. are available with different set of advantages and disadvantages. Directly or indirectly these models are based upon the traditional Waterfall model. One different approach which is given the name Agile Modeling is a practice-based methodology based upon V model which is used for modeling and documentation of software. Agile software development technology also called “agile technology or methodology” is not a set of tools but is an philosophy which came in late 1990s. Instead of relying on heavy documentation Agile focused on to be a collection of values, principles, and practices for modeling software that can be applied on a software development project in a more flexible manner than traditional Waterfall modeling method. The comparative study of ...

Rupali Pawar

This paper will focus on traditional SDLC method like Waterfall model and will brief on comparative study of same with Agile. Traditional SDLC models like Waterfall model is sequential development methodology where output of one development phase becomes input for other. To brief cons, like risk of failure are high and process itself is not flexible for change. Agile software development methodology is widely used software development process which overcomes the drawbacks of traditional software development methods.It provides means for rapid development and great deal of flexibility to adopt new changes during development process. The primary data collection method was interviews of the industryexpertise. The secondary source of data is reference books and Internet articles. This paper will help to understand basics of Agile methodology.

Comparison of the Agile Methodologies and the Waterfall

murat goksu

In the daily life of the software we think of mobile phone computer and so on devices that we use in different ways on our devices. For companies, the management of business processes such as the supply chain of human resources is the system of measurement of efficiency and profitability rates. The production of software, which is not in need of personal need, but increasing in importance in the institutional sense, has changed the dimension with the fourth industrial revolution. As a manifestation of this, the waterfall model and the latest methodology have been included in the software development processes of the first period and there are a variety of sub-disciplines and agile methods. In this study, both methods will be examined and a comparison will be made.

Proc. 19th Annual Conference of the National …

Diane Strode

Hemnaad Chinnuraj

Tariq Soomro

Pakistan Journal of Engineering and Technology

Hiba fatima

Software development procedures are constantly evolving to monitor and evaluate the quality and to save money and time. Numerous organizations are migrating away from traditional business models and toward agile methodologies. The purpose of this paper is to illustrate both traditional and agile software development approaches and the numerous techniques associated with them. This analysis conducted identical investigations into two radically different ways of thinking about product development: traditional methods and agile approaches. The paper is supported by several studies commissioned by various organizations to determine the transition from the traditional to the agile paradigm. The follow-up and data analysis explore and reveal changes and emerging trends that arose announcement of the agile technique which is mentioned in this paper, and also has gained increasing prominence in agile in product development over the last couple of years.

RELATED PAPERS

Archives of Clinical Neuropsychology

Jeffrey Rogg

South African Journal of Industrial Engineering

Aytac Yildiz

Esther Akinlabi

Custom Dress Brukat by Rumah Jahit Azka

rumahjahitazka kebumen

Boris Čulina

Journal of the Geological Society

Ioannis Mitsis

Ecology letters

Chris Carbone

C. Sernadas

Metallika Putra Prabowo

Arabian Journal of Chemistry

Alexander Córdoba

Boletin De Geologia

carlos alberto parra zuluaga

Proceedings of the National Academy of Sciences

T. Mallevaey

Proceedings of the 2015 Federated Conference on Computer Science and Information Systems

Damian Król

Journal of Geophysical Research: Space Physics

Maria do Socorro P de Oliveira

Choice Reviews Online

Ralph Stearley

Transactions of the Royal Entomological Society of London

Martin Jacoby

Journal of Physical Therapy Science

Satoshi Shimo

Renewable Energy

منى إسكندر

Disease Markers

Daniel Petrovic

Call Girls in Chawri Bazar

Stijn Jaspers

Heart Rhythm

Stavros Mountantonakis

Social Science Research Network

Gyorgy Szapary

RELATED TOPICS

  •   We're Hiring!
  •   Help Center
  • Find new research papers in:
  • Health Sciences
  • Earth Sciences
  • Cognitive Science
  • Mathematics
  • Computer Science
  • Academia ©2024

IMAGES

  1. Waterfall Project Management Methodology

    waterfall methodology research paper

  2. What is the Waterfall Model?

    waterfall methodology research paper

  3. 2023 Quick Guide Waterfall Methodology

    waterfall methodology research paper

  4. The Waterfall Methodology

    waterfall methodology research paper

  5. Complete Guide to the Waterfall Project Management Methodology

    waterfall methodology research paper

  6. Everything You Need to Know About Using the Waterfall Methodology

    waterfall methodology research paper

VIDEO

  1. This waterfall moves upwards @MRINDIANHACKER @CrazyXYZ || #FactNirvana || #shorts

  2. Waterfall v/s Agile Methodology

  3. What Is WaterFall Model In Software Development Life Cycle

  4. 05. Waterfall methodology #manualtesting #softwaretesting #softwaretestingcourses

  5. What are the Benefits of Agile over Waterfall Methodology?

  6. Waterfall model In Software testing

COMMENTS

  1. The Waterfall Model and the Agile Methodologies

    The V-model, also known as the Verification and Validation model, is a sequential development process that mirrors the shape of a V. It is similar to the waterfall model in that each stage must be ...

  2. Agile versus Waterfall Project Management: Decision Model for Selecting

    This paper answers the following research questions: What are the differences, benefits, and constraints of these two approaches from a practitioner’s point of view? ... Procedural models for project management can be roughly divided into (1) plan-driven methods. which follow a classical waterfall process; and (2) agile methods (such as ...

  3. The Waterfall Model and the Agile Methodologies

    development. The purpose of this paper is to give a short. presentation of two Software Development Models (SDMs), The. Waterfall Model and the Agile Methodologies (AM), and offer f or. both SDMs ...

  4. Waterfall Methodology for Project Management

    Waterfall methodology is a well-established project management workflow. Like a waterfall, each process phase cascades downward sequentially through five stages (requirements, design, implementation, verification, and maintenance). The methodology comes from computer scientist Winston Royce's 1970 research paper on software development.

  5. Waterfall Methodology

    The waterfall methodology uses a sequential or linear approach to software development. The project is broken down into a sequence of tasks, with the highest level grouping referred to as phases. A true waterfall approach requires phases that are completed in sequence and have formal exit criteria, typically a sign-off by the project stakeholders.

  6. From Waterfall to Agile

    Download chapter PDF. Before Agile came into the picture, the most common methodology of software development was Waterfall. Waterfall is a model in which the project is planned and executed within a time period that is required to achieve the final goal. That means, when we are talking about big projects that typically take a few years to ...

  7. A Quantitative Study of Waterfall and Agile Methodologies With the

    Authors are mainly focusing on two models (i.e., waterfall and agile model). Waterfall model is a serial model which follows a strict sequence. Agile methodology can be divided into scrum methodology and extreme programming. Scrum methodology mainly focuses on how to manage tasks in a team-based environment. Scrum consists of three main roles.

  8. The Waterfall Model in Large-Scale Development

    Waterfall development is still a widely used way of working in software development companies. Many problems have been reported related to the model. Commonly accepted problems are for example to cope with change and that defects all too often are detected too late in the software development process. However, many of the problems mentioned in ...

  9. Transition From Waterfall to Agile Methodology: An Action Research

    This paper presents an in-depth exploration of an action research study detailing the transition of a software development team from a plan-based paradigm to Agile methodology. The primary goal is to provide a comprehensive account of the Agile transition journey within the context of action research and to underscore the associated benefits ...

  10. PDF Waterfall Process Operations in the Fast-paced World: Project ...

    The problem statement is waterfall methodology still in use or the modern methodologies have replaced waterfall methodology. The system development life cycle methodologies are fall short in the new business world (Yourdon, 2000). Aim The aim of this analysis paper is to investigate whether waterfall methodology is still in operations

  11. Waterfall Methodology: The Ultimate Guide to the Waterfall Model

    The waterfall methodology is a linear project management approach, where stakeholder and customer requirements are gathered at the beginning of the project, and then a sequential project plan is created to accommodate those requirements. The waterfall model is so named because each phase of the project cascades into the next, following steadily ...

  12. What Is the Waterfall Methodology? (Definition

    The waterfall methodology is a software development life cycle (SDLC) model used to build software projects. One thing that distinguishes waterfall from other SDLC models (like Agile) is that phases are performed sequentially. In other words, the project team must complete each phase in a specific order. If you look at the diagram below, you ...

  13. Waterfall method: A Necessary Tool for Implementing Library Projects

    This paper will describe the Waterfall Methodology for information system development in terms of organization design, and its use in project management. After examining this methodology, we then propose a library project management strategy based on the Waterfall Methodology. ... Systems Research and Behavioral Science, 19(1), 77. DOI:10.1002 ...

  14. PDF Application of the Waterfall Method on a Web-Based Job Training

    6xeolph 7h[w zklfk lv d wh[w hglwru wkdw lv xvhg wr zulwh surjudp frghv lq pdnlqj zhevlwhv ;dpss zklfk lv dq dsdfkh zhevhuyhu lq zklfk

  15. Chapter III Methodology of the Study Waterfall Model

    View PDF. Chapter III Methodology of the Study Waterfall Model Requirements - the first step needs the gathering of data. If this will be done inaccurately, there is little chance that the solution to the problem will be formulated. This is the stage where solutions will be identified to what is needed to be done to the system.

  16. waterfall model Latest Research Papers

    Waterfall model is a serial model which follows a strict sequence. Agile methodology can be divided into scrum methodology and extreme programming. Scrum methodology mainly focuses on how to manage tasks in a team-based environment. Scrum consists of three main roles. They are scrum master, product owner, and scrum team.

  17. What is Waterfall Methodology?

    Waterfall Methodology Definition. The Waterfall approach was established in 1970 by Winston w. Royce. It contains five phases of management, where each requires a deliverable from the previous ...

  18. Waterfall Model: The Scientific Method of Software Engineering

    Academia.edu is a platform for academics to share research papers. Waterfall Model: The Scientific Method of Software Engineering ... This paper will focus on traditional SDLC method like Waterfall model and will brief on comparative study of same with Agile. Traditional SDLC models like Waterfall model is sequential development methodology ...