Water Resources Planning and Management: An Overview

  • Open Access
  • First Online: 04 March 2017

Cite this chapter

You have full access to this open access chapter

methodology of water plan

  • Daniel P. Loucks 3 &
  • Eelco van Beek 4  

178k Accesses

49 Citations

Water resource systems have benefited both people and their economies for many centuries. The services provided by such systems are multiple. Yet in many regions of the world they are not able to meet even basic drinking water and sanitation needs. Nor can many of these water resource systems support and maintain resilient biodiverse ecosystems. Typical causes include inappropriate, inadequate and/or degraded infrastructure, excessive withdrawals of river flows, pollution from industrial and agricultural activities, eutrophication resulting from nutrient loadings, salinization from irrigation return flows, infestations of exotic plant and animals, excessive fish harvesting, flood plain and habitat alteration from development activities, and changes in water and sediment flow regimes.

You have full access to this open access chapter,  Download chapter PDF

  • Water Resource
  • River Basin
  • Water Resource Management
  • Integrate Water Resource Management
  • Water Resource System

These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

1.1 Introduction

Water resource systems have benefited both people and their economies for many centuries. The services provided by such systems are multiple. Yet in many regions of the world they are not able to meet even basic drinking water and sanitation needs. Nor can many of these water resource systems support and maintain resilient biodiverse ecosystems . Typical causes include inappropriate, inadequate and/or degraded infrastructure, excessive withdrawals of river flows, pollution from industrial and agricultural activities, eutrophication resulting from nutrient loadings , salinization from irrigation return flows, infestations of exotic plant and animals, excessive fish harvesting, flood plain and habitat alteration from development activities, and changes in water and sediment flow regimes. The inability of water resource systems to meet the diverse needs for water often reflect failures in planning, management, and decision-making—and at levels broader than water. Planning, developing, and managing water resources to ensure adequate, inexpensive, and sustainable supplies and qualities of water for both humans and natural ecosystems can only succeed if we recognize and address the causal socioeconomic factors, such as inadequate education, corruption, population pressures, and poverty.

Over the centuries, surface and ground waters have been a source of water supply for agricultural, municipal, and industrial consumers. Rivers have provided hydroelectric energy and inexpensive ways of transporting bulk cargo. They have provided people water-based recreational opportunities and have been a source of water for wildlife and their habitats. They have also served as a means of transporting and transforming waste products that are discharged into them. The quantity and quality regimes of streams and rivers have been a major factor in governing the type, health, and biodiversity of riparian and aquatic ecosystems. Floodplains have provided fertile lands for agricultural crop production and relatively flat lands for the siting of roads and railways and commercial and industrial complexes. In addition to the economic benefits that can be derived from rivers and their floodplains, the aesthetic beauty of most natural rivers has made lands adjacent to them attractive sites for residential and recreational development. Rivers and their floodplains have generated, and, if managed properly, can continue to generate, substantial cultural, economic, environmental, and social benefits for their inhabitants.

Human activities undertaken to increase the benefits obtained from rivers and their floodplains may also increase the potential for costs and damages such as when the river is experiencing periods of droughts, floods, and heavy pollution. These costs and damages are physical, economic, environmental, and social. They result because of a mismatch between what humans expect or demand, and what nature offers or supplies. Human activities tend to be based on the “usual or normal” range of river flow conditions. Rare or “extreme” flow conditions outside these normal ranges will continue to occur, and possibly with increasing frequency as climate change experts suggest. River-dependent human activities that cannot adjust to these extreme flow conditions will incur losses.

The planning of human activities involving rivers and their floodplains must consider certain hydrologic facts. One of these facts is that surface water flows and aquifer storage volumes vary over space and time. They are also finite. There are limits to the amounts of water that can be withdrawn from them. There are also limits to the amounts of pollutants that can be discharged into them. Once these limits are exceeded, the concentrations of pollutants in these waters may reduce or even eliminate the benefits that could be obtained from other users of the resource.

Water resources professionals have learned how to plan, design , build, and operate structures that together with nonstructural measures increase the benefits people can obtain from the water resources contained in aquifers, lakes, rivers, and estuaries. However, there is a limit to the services one can expect from these resources. Rivers, estuaries, and coastal zones under stress from over development and overuse cannot reliably meet the expectations of those depending on them. How can these resources best be managed and used? How can this be accomplished in an environment of uncertain and varying supplies and uncertain and increasing demands, and consequently of increasing conflicts among individuals having different interests in their management and use? The central purpose of water resources planning, management, and analysis activities is to address, and if possible answer, these questions. These questions have scientific, technical, political (institutional), and social dimensions. Thus water resources planning processes and products are must.

River basin, estuarine, and coastal zone managers—those responsible for managing the resources in those areas—are expected to manage those resources effectively and efficiently, meeting the demands or expectations of all users, and reconciling divergent needs. This is no small task, especially as demands increase, as the variability of hydrologic and hydraulic processes become more pronounced, and as stakeholder expectations of system performance increase in complexity. The focus or goal is no longer simply to maximize economic net benefits while making sure the distribution of those benefits is equitable. There are also environmental and ecological goals to consider. Rarely are management questions one-dimensional, such as how can we provide, at acceptable costs , more high-quality water to municipalities, industry, or to irrigation areas in the basin. Now added to that question is how would those withdrawals affect the downstream hydrologic water quantity and quality regimes, and in turn the riparian and aquatic ecosystems .

Problems and opportunities change over time. Just as the goals of managing and using water change over time, so do the processes of planning to meet these changing goals. Planning processes evolve not only to meet new demands, expectations , and objectives , but also in response to new perceptions of how to plan and manage more effectively.

This chapter reviews some of the issues requiring water resources planning and management. It provides some context and motivation for the following chapters that outline in more detail our understanding of “how to plan” and “how to manage” and how computer-based programs and models can assist those involved in these activities. Additional information is available in many of the references listed at the end of this chapter.

1.2 Planning and Management Issues: Some Case Studies

Managing water resources certainly requires knowledge of the relevant physical sciences and technology. But at least as important, if not more so, are the multiple institutional, social, or political issues confronting water resources planners and managers. The following brief descriptions of some water resources planning and management studies at various geographic scales illustrate some of these issues.

1.2.1 Kurds Seek Land , Turks Want Water

The Tigris and Euphrates Rivers (Fig.  1.1 ) created the “Fertile Crescent” where some of the first civilizations emerged. Today their waters are critical resources, politically as well as geographically. In one of the world’s largest public works undertakings, Turkey’s Southeast Anatolia Project includes 13 irrigation and hydropower schemes, and the construction of 22 dams and 19 hydroelectric power plants on both the Tigris and the Euphrates. Upon completion, it is expected to provide up to 25% of the country’s electricity.

The Tigris and Euphrates Rivers in Turkey, northern Syria, and Iraq

Its centerpiece, the Ataturk Dam (Fig.  1.2 ) on the Euphrates River, is already completed. In the lake formed behind the dam, sailing and swimming competitions are being held on a spot where for centuries there was little more than desert (Fig.  1.3 ).

figure 2

Ataturk Dam on the Euphrates River in Turkey (DSI)

figure 3

Water sports on Ataturk Reservoir on the Euphrates River in Turkey (DSI)

When the multireservoir project is completed it is expected to increase the amount of irrigated land in Turkey by 40% and provide up to a quarter of the country’s electric power needs. Planners hope this can improve the standard of living of six million of Turkey’s poorest people, most of the Kurds, and thus undercut the appeal of revolutionary separatism. It will also reduce the amount of water Syria and Iraq believe they need—water that Turkey fears might ultimately be used in anti-Turkish causes.

The region of Turkey where Kurd’s predominate is more or less the same region covered by the Southeast Anatolia Project, encompassing an area about the size of Austria. Giving that region autonomy by placing it under Kurdish self-rule could weaken the central Government’s control over the water resource that it recognizes as a keystone of its future power.

In other ways also, Turkish leaders are using their water as a tool of foreign as well as domestic policy. Among their most ambitious projects considered is a 50-mile undersea pipeline to carry water from Turkey to the parched Turkish enclave on northern Cyprus. The pipeline, if actually built, will carry more water than northern Cyprus can use. Foreign mediators, frustrated by their inability to break the political deadlock on Cyprus, are hoping that the excess water can be sold to the ethnic Greek republic on the southern part of the island as a way of promoting peace.

As everyone knows, the Middle East is currently (2016) witnessing considerable turmoil so who knows the fate of any water resources project in this region, including the one just described in Turkey and the following example in Jordan. One can only hope that the management and use of this scarce resource will lead to more peaceful resolutions of conflicts not only involving water but of other political issues as well.

1.2.2 Sharing the Water of the Jordan River Basin: Is There a Way?

A growing population —approximately 12 million people—and intense economic development in the Jordan River Basin (Fig.  1.4 ) are placing heavy demands on its scarce freshwater resources. This largely arid region receives less than 250 mm of rainfall each year, yet total water use for agricultural and economic activities has been steadily increasing. This plus encroaching urban development have degraded many sources of high-quality water in the region.

The Jordan River between Israel and Jordan

The combined diversions by the riparian water users have changed the river in its lower course into little better than a sewage ditch. From the 1300 million cubic meters (mcm) of water that flowed into the Dead Sea in the 1950s only a small fraction remains at present. In normal years the flow downstream from Lake Tiberias (also called the Sea of Galilee or Lake Kinneret) is some 60 million cubic meters (mcm)—about 10% of the natural discharge in this section. It mostly consists of saline springs and sewage water. These flows are then joined by what remains of the Yarmouk, by some irrigation return flows, and by winter runoff , adding up to an annual total of from 200–300 mcm. Both in quantity and quality this water is unsuitable for irrigation and does not sufficiently supply natural systems either. The salinity of the Jordan River reaches up to 2000 parts per million (ppm) in the lowest section, which renders it unfit for crop irrigation. Only in flood years is fresh water released into the lower Jordan Valley.

One result of this increased pressure on freshwater resources is the deterioration of the region’s wetlands . These wetlands are important for water purification and flood and erosion control. As agricultural activities expand, wetlands are being drained, and rivers, aquifers , lakes, and streams are being polluted with runoff containing fertilizers and pesticides. Reversing these trends by preserving natural ecosystems is essential to the future availability of fresh water in the region.

To ensure that an adequate supply of fresh, high-quality water is available for future generations, Israel, Jordan, and the Palestinian Authority will have to work together to preserve aquatic ecosystems (White et al. 1999 ). Without these natural ecosystems, it will be difficult and expensive to sustain high-quality water supplies. The role of ecosystems in sustaining water supplies has largely been overlooked in the context of the region’s water supplies. Vegetation controls storm water runoff and filters polluted water , and it reduces erosion and the amount of sediment that makes its way into water supplies. Streams assimilate wastewater, lakes store clean water, and surface waters provide habitat for many plants and animals.

The Jordan River Basin just like most river basins should be evaluated and managed as a whole system, to permit the comprehensive assessment of the effects of water management options on wetlands , lakes, the lower river, and the Dead Sea coasts. Damage to ecosystems and loss of animal and plant species should be weighed against the potential benefits of developing land and creating new water resources. For example, large river-management projects that divert water to dry areas have promoted intensive year-round farming and urban development, but available river water is declining and becoming increasingly polluted. Attempting to meet current demands solely by withdrawing more ground and surface water could result in widespread environmental degradation and depletion of freshwater resources.

There are policies that if implemented could help preserve the capacity of the Jordan River to meet future demands. Most of the options relate to improving the efficiency of water use—that is, they involve conservation and better use of proven technologies. Also being considered are policies that emphasize economic efficiency and reduce overall water use. Charging higher rates for water use in peak periods, and surcharges for excessive use, would encourage conservation. In addition, new sources of fresh water can be obtained by capturing rainfall through rooftop cisterns, catchment systems, and storage ponds. However before such measures are required, one should assess the impact on local aquifer recharge, storage, and withdrawals .

Thus there are alternatives to a steady deterioration of the water resources of the Jordan Basin. They will require coordination and cooperation among all those living in the basin. Will this be possible?

1.2.3 Mending the “Mighty and Muddy” Missouri

Nearly two centuries after an epic expedition through the Western US in search of a northwest river passage to the Pacific Ocean, there is little enchantment left to the Missouri River. Shown in Figs.  1.5 and 1.6 , it has been dammed, diked, and dredged since the 1930s mainly to control floods and float cargo barges. The river nicknamed the “Mighty Missouri” and the “Big Muddy” by its explorers is today neither mighty nor muddy. The conservation group American Rivers perennially lists the Missouri among the USA’s 10 most endangered rivers .

Major river basins in the continental US

The Missouri Basin’s Reservoirs (not to scale) constructed for navigation and flood control

Its wilder upper reaches are losing their cottonwood trees to dam operations and cattle that trample seedlings along the river’s banks. Its vast middle contains multiple dams that hold back floods, generate power, and provide pools for boats and anglers.

Its lower one-third is a narrow canal sometimes called “The Ditch” that is deep enough for commercial towboats. Some of the river’s banks are armored with rock and concrete retaining walls that protect half a million acres of farm fields from flooding. Once those floods produced and maintained marshlands and side streams—habitats for a wide range of wildlife. Without these habitats, many wild species are unable to thrive, and in some cases even survive.

Changes to restore at least some of the Missouri to a more natural state are being implemented. These changes add protection of fish and wildlife habitat to the list of objectives to be achieved by the government agencies managing the Missouri. The needs of wildlife are now as important as other competing interests on the river including navigation and flood control. This is in reaction , in part, to the booming $115 million-a-year outdoor recreation industry. Just how much more emphasis will be given to these back-to-nature goals depends on whether the Missouri River Basin Association, an organization representing eight states and 28 Native American tribes, can reach a compromise with the traditional downstream uses of the river.

1.2.4 The Endangered Salmon

Greater Seattle in the northwestern US state of Washington may be best known around the world for Microsoft, but residents know it for something less flashy: its dwindling stock of wild salmon. The Federal Government has placed seven types of salmon and two types of trout on its list of threatened or endangered species. Saving the fish from extinction could slow land development in one of the fastest growing regions of the U.S.

The Snake and Columbia River reservoirs identified by the Columbia and Snake Rivers Campaign for modification or dismantling to permit salmon passage

Before the Columbia River and its tributaries in NW US were blocked with dozens of dams, about 10–16 million salmon made the annual run back up to their spawning grounds (Fig.  1.7 ). In 1996, a little less than 1 million did. But the economy of the NW depends on the dams and locks that have been built in the Columbia that provide cheap hydropower production and navigation .

For a long time, engineers tried to modify the system so that fish passage would be possible. As shown in Fig.  1.8 b, this included even the use of trucks to transport captured juvenile salmon around dams for release downstream. (It is not clear that the trucks will be there when the fish return to spawn upstream of the dams.) These measures have not worked all that well. Still too many young fish enter the hydropower turbines on their way down the river. Now, as the debate over whether or not to remove some dams takes place, fish are caught and trucked around the turbines. The costs of keeping these salmon alive, if not completely happy, are enormous.

A salmon swimming upstream ( a ) and measures taken to protect young juvenile salmon pass by hydropower dams on their way downstream ( b ) (US Fish and Wildlife Service and US Army Corps of Engineers, Pacific region)

Over a dozen national and regional environmental organizations have joined together to bring back salmon and steelhead by modifying or partially dismantling five federal dams on the Columbia and Snake Rivers. Partial removal of the four dams on the lower Snake River in Washington State and lowering the reservoir behind John Day dam on the Columbia bordering Oregon and Washington (see Fig.  1.8 ) should help restore over 200 miles of vital river habitat. Running the rivers more like rivers may return salmon and steelhead to harvestable levels of the 1960s before the dams were built.

Dismantling part of the four Lower Snake dams will leave most of each dam whole. Only the dirt bank connecting the dam to the riverbank will be removed. The concrete portion of the dam will remain in place, allowing the river to flow around it. The process is reversible and, the Campaign argues, it will actually save taxpayers money in planned dam maintenance, by eliminating subsidies to shipping industries and agribusinesses, and by ending current salmon recovery measures that are costly. Only partially removing the four Lower Snake River dams and modifying John Day dam will help restore rivers, save salmon, and return balance to the Northwest’s major rivers.

1.2.5 Wetland Preservation: A Groundswell of Support and Criticism

The balmy beach community of Tiger Point near Pensacola, Florida, bordering the Gulf of Mexico, is booming with development. New subdivisions, a Wal-Mart discount retail store and a recreation center dot the landscape.

Most—if not all—of this neighborhood was once a wetland that soaked up rain during downpours. Now, water runs off the parking lots and the roofs and into resident’s living rooms. Some houses get flooded nearly every year.

A federal agency oversees wetland development. Critics say the agency is permitting in this area one of the highest rates of wetland loss in the nation. Obviously local developers wish they did not have to deal with the agency at all. The tension in Tiger Point reflects the debate throughout the US about whether the government is doing enough—or too much—to protect the nation’s environment, and in this case, its wetlands.

Environmentalists and some homeowners value wetlands because they help reduce water pollution and floods, as well as nurture a diverse wildlife population. But many landowners and developers see the open wetlands as prime territory for building houses and businesses, rather than for breeding mosquitoes. They view existing federal wetland rules as onerous, illogical, and expensive.

While some areas such as Tiger Point have residents who want stricter laws to limit wetlands development, others—such as the suburbs around Seattle—have people who long for less strict rules.

Federal regulators had tried to quell the controversy with a solution known as wetlands mitigation. Anyone who destroys a wetland is required to build or expand another wetland somewhere else. Landowners and developers also see mitigation as a way out of the torturous arguments over wetlands. However, studies have shown many artificial marshes do not perform as well as those created by nature (NRC 2001 ). Many of the new, artificial wetlands are what scientists call the “ring around the pond” variety: open water surrounded by cattails. Furthermore, the federal agency issuing permits for wetland replacement do not have the resources to monitor them after they are approved. Developers know this.

1.2.6 Lake Source Cooling: Aid to Environment, or Threat to Lake?

It seems to be an environmentalist’s dream: a cost-effective system that can cool some 10 million square feet of high school and university buildings simply by pumping cold water from the depths of a nearby lake (Fig.  1.9 ). No more chlorofluorocarbons, the refrigerants that can destroy protective ozone in the atmosphere and at a cost substantially smaller than for conventional air conditioners. The lake water is returned to the lake, with a few added calories.

figure 9

The cold deep waters of Lake Cayuga are being used to cool the buildings of a local school and university (Ithaca City Environmental Laboratory)

However, a group of local opponents insists that Cornell University’s $55 million lake-source-cooling plan that replaced its aging air conditioners is actually an environmental threat. They believe it could foster algal blooms. Pointing to 5 years of studies, thousands of pages of data, and more than a dozen permits from local and state agencies, Cornell’s consultants say the system could actually improve conditions in the lake. Yet another benefit, they say, is that the system would reduce Cornell’s contribution to global warming by reducing the need to burn coal to generate electricity.

For the most part, government officials agree. But a small determined coalition of critics from the local community argue over the expected environmental impacts, and over the process that took place in getting the required local, state, and federal permits approved. This is in spite of the fact that the planning process, that took over 5 years, requested and involved the participation of all interested stakeholders (that would participate) from the very beginning. Even the local Sierra Club chapter and biology professors at other universities have endorsed the project. However, in almost every project where the environmental impacts are uncertain, there will be debates among scientists as well as stakeholders. In addition, a significant segment of society distrusts scientists anyway. “This is a major societal problem,” wrote a professor and expert in the dynamics of lakes. “A scientist says X and someone else says Y and you’re got chaos. In reality, we are the problem. Every time we flush our toilets, fertilize our lawns, gardens and fields, or wash our cars we contribute to the nutrient loading of the lake.”

The project has now been operating for over a decade, and so far no adverse environmental effects have been noticed at any of the many monitoring sites.

1.2.7 Managing Water in the Florida Everglades

The Florida Everglades (Fig.  1.10 ) is the largest single wetland in the continental United States. In the mid-1800s it covered a little over nine million acres, but since that time the historical Everglades has been drained and half of the area devoted to agriculture and urban development. The remaining wetland areas have been altered by human disturbances both around and within them. Water has been diverted for human uses, flows have been lowered to protect against floods, nutrient supplies to the wetlands from runoff from agricultural fields and urban areas have increased, and invasions of nonnative or otherwise uncommon plants and animals have out-competed native species. Populations of wading birds (including some endangered species) have declined by 85–90% in the last half-century, and many species of South Florida’s mammals, birds, reptiles, amphibians, and plants are either threatened or endangered.

figure 10

Scenes of the Everglades in southern Florida (South Florida Water Management District)

The present management system of canals, pumps, and levees (Fig.  1.11 ) will not be able to provide adequate water supplies to agricultural and urban areas, or sufficient flood protection , let alone support the natural (but damaged) ecosystems in the remaining wetlands . The system is not sustainable. Problems in the greater Everglades ecosystem relate to both water quality and quantity , including the spatial and temporal distribution of water depths , flows, and flooding durations—called hydroperiods. Issues arise because of variations from the natural/historical hydrologic regime, degraded water quality, and the sprawl from fast-growing urban areas.

figure 11

Pump station on a drainage canal in southern Florida (South Florida Water Management District)

To meet the needs of the burgeoning population and increasing agricultural demands for water, and to begin the restoration of Everglades’ aquatic ecosystem to a more natural regime, an ambitious plan has been developed by the U.S. Army Corps of Engineers and its local sponsor, the South Florida Water Management District. The proposed Corps plan is estimated to cost over $8 billion. The plan and its Environmental Impact Statement (EIS) have received input from many government agencies and nongovernmental organizations, as well as from the public at large.

The plan to restore the Everglades is ambitious and comprehensive, involving change of the current hydrologic regime in the remnant Everglades to one that resembles a more natural one, reestablishment of marshes and wetlands , implementation of agricultural best management practices, enhancements for wildlife and recreation , and provisions for water supply and flood control.

Planning for and implementing the restoration effort requires application of state-of-the-art large systems analysis concepts, hydrological and hydroecological data and models incorporated within decision support systems, integration of social sciences, and monitoring for planning and evaluation of performance in an adaptive management context. These large, complex challenges of the greater Everglades restoration effort demand the most advanced, interdisciplinary, and scientifically sound analysis capabilities that are available. They also require the political will to make compromises and to put up with the lawsuits by anyone possibly disadvantaged by some restoration measure.

Who pays for all this? The taxpayers of Florida and the taxpayers of the U.S.

1.2.8 Restoration of Europe’s Rivers and Seas

1.2.8.1 north and baltic seas.

The North and Baltic Seas (shown in Fig.  1.12 ) are the most densely navigated seas in the world. Besides shipping, military, and recreational uses, an offshore oil industry and telephone cables cover the seabed. The seas are rich and productive with resources that include not only fish but also crucial minerals (in addition to oil) such as gas, sand, and gravel. These resources and activities play major roles in the economies of the surrounding countries.

Europe’s major rivers and seas

Being so intensively used and surrounded by advanced industrialized countries, pollution problems are serious. The main pollution sources include various wastewater outfalls, dumping by ships (of dredged materials, sewage sludge, and chemical wastes) and operational discharges from offshore installations. Deposition of atmospheric pollutants is an additional major source of pollution.

Those parts of the seas at greatest risk from pollution are where the sediments come to rest, where the water replacement is slowest and where nutrient concentrations and biological productivity are highest. A number of warning signals have occurred.

Algal populations have changed in number and species. There have been algal blooms, caused by excessive nutrient discharge from land and atmospheric sources. Species changes show a tendency toward more short-lived species of the opportunistic type and a reduction, sometimes to the point of disappearance, of some mammals and fish species and the sea grass community. Decreases of ray, mackerel, sand eel, and echinoderms due to eutrophication have resulted in reduced plaice, cod, haddock and dab, mollusk and scoter.

The impact of fishing activities is also considerable. Sea mammals, sea birds, and Baltic fish species have been particularly affected by the widespread release of toxins and pollutants accumulate in the sediments and in the food web. Some animals, such as the gray seal and the sea eagle, are threatened with extinction.

Particular concern has been expressed about the Wadden Sea that serves as a nursery for many North Sea species. Toxic PCB contamination, for example, almost caused the disappearance of seals in the 1970s. Also, the 1988 massive seal mortality in the North and Wadden Seas, although caused by a viral disease, is still thought by many to have a link with marine pollution.

Although the North Sea needs radical and lengthy treatment it is probably not a terminal case. Actions are being taken by bordering countries to reduce the discharge of wastes into the sea. A major factor leading to agreements to reduce discharges of wastewaters has been the verification of predictive pollutant circulation models of the sea that identify the impacts of discharges from various sites along the sea boundary.

1.2.8.2 The Rhine

The map of Fig.  1.13 shows the areas of the nine countries that are part of river Rhine basin. In the Dutch area of the Rhine basin, water is partly routed northward through the IJssel and westward through the highly interconnected river systems of the Rhine, Meuse, and Waal.

The Rhine River Basin of Western Europe and its extension in The Netherlands

About 55 million people live in the Rhine River basin and about 20 million of those people drink the river water.

In the mid 1970s, some called the Rhine the most romantic sewer in Europe. In November 1986, a chemical spill degraded much of the upper Rhine’s aquatic ecosystem. This damaging event was reported worldwide. The Rhine was again world news in the first 2 months of 1995, when its water level reached a height that occurs on average once in a century. In the Netherlands, some 200,000 people, 1,400,000 pigs and cows, and 1,000,000 chickens had to be evacuated. During the last 2 months of the same year there was hardly enough water in the Rhine for navigation . It is fair to say these events have focused increased attention on what needs to be done to “restore” and protect the Rhine.

To address just how to restore the Rhine, it is useful to look at what has been happening to the river during the past 150 years. The Rhine was originally a natural watercourse. It is the only river connecting the Alps with the North Sea. To achieve greater economic benefits from the river, it was engineered for navigation, hydropower, water supply, and flood protection . Flood plains now “protected” from floods, provided increased land areas suitable for development. The main stream of the Rhine is now considerably shorter and narrower and deeper than it was originally.

From an economic development point of view, the engineering works implemented in the river and its basin worked. The Rhine basin is now one of the most industrialized regions in the world. The basin is characterized by intensive industrial and agricultural activities. Some 20% of the world’s chemical industry is located in the Rhine River basin. The River is reportedly the busiest shipping waterway in the world, containing long canals with regulated water levels. These canals connect the Rhine and its tributaries with the rivers of almost all the surrounding river basins including the Danube River. This provides water transport to and from the North and Black Seas.

From an environmental and ecological viewpoint, and from the viewpoint of flood control as well, the economic development that has taken place over the past two centuries has not worked perfectly. The concerns growing from the recent toxic spill and floods as from a generally increasing interest by the inhabitants of the basin in environmental and ecosystem restoration and the preservation of natural beauty, has resulted in basin-wide efforts to rehabilitate the basin to a more “living” sustainable entity.

A Rhine Action Programme was created to revive the ecosystem. The goal of that program is the revival of the main stream as the backbone of the ecosystem, particularly for migratory fish, and the protection, maintenance, and the revival of ecologically important areas along the Rhine. The plan, implemented in the 1990s, was given the name “Salmon 2000”. The return of salmon to the Rhine is seen as a symbol of ecological revival. A healthy salmon population will need to swim throughout the river length. This will pose a challenge, as no one pretends that the engineering works that provide navigation and hydropower benefits, but which also inhibit fish passage, are no longer needed or desired.

1.2.8.3 The Danube

The Danube River (shown in Fig.  1.14 ) is in the heartland of Central Europe. Its basin includes to a larger extent the territories of 15 countries. It additionally receives runoff from small catchments located in four other countries. About 90 million people live in the basin. This river encompasses perhaps more political, economic, and social variations than arguably any other river basin in Europe.

The Danube River in Central Europe

The river discharges into the Black Sea. The Danube delta and the banks of the Black Sea have been designated a Biosphere Reserve by UNESCO. Over half of the Delta has been declared a “wet zone of international significance.” Throughout its length the Danube River provides a vital resource for drainage, communications, transport , power generation, fishing, recreation , and tourism. It is considered to be an ecosystem with irreplaceable environmental values.

More than 40 dams and large barrages plus over 500 smaller reservoirs have been constructed on the main Danube River and its tributaries. Flood control dikes confine most of the length of the main stem of the Danube River and the major tributaries. Over the last 50 years natural alluvial flood plain areas have declined from about 26,000 km 2 to about 6000 km 2 .

There are also significant reaches with river training works and river diversion structures. These structures trap nutrients and sediment in the reservoirs. This causes changes in downstream flow and sediment transport regimes that reduce the ecosystems ’ habitats both longitudinally and transversely, and decrease the efficiency of natural purification processes. Thus while these engineered facilities provide important opportunities for the control and use of the river’s resources, they also illustrate the difficulties of balancing these important economic activities with environmentally sound and sustainable management.

The environmental quality of the Danube River is also under intense pressure from a diverse range of human activities, including point source and nonpoint source agricultural, industrial, and municipal wastes. Because of the poor water quality (sometimes affecting human health) the riparian countries of the Danube river basin have been participating in environmental management activities on regional , national, and local levels for several decades. All Danube countries signed a formal Convention on Cooperation for the Protection and Sustainable Use of the Danube River in June 1994. The countries have agreed to take “…all appropriate legal, administrative and technical measures to improve the current environmental and water quality conditions of the Danube River and of the waters in its catchment area and to prevent and reduce as far as possible adverse impacts and changes occurring or likely to be caused.”

1.2.9 Flood Management on the Senegal River

As on many rivers in the tropical developing world, dam constructions on the Senegal (and conventional dam management strategies) can change not only the riverine environment but also the social interactions and economic productivity of farmers, fishers, and herders whose livelihoods depend on the annual flooding of valley bottomlands. Although much of the Senegal River flows through a low rainfall area, the naturally occurring annual flooding supported a rich and biologically diverse ecosystem. Living in a sustainable relationship with their environment, small-land holders farmed sandy uplands during the brief rainy season, and then cultivated the clay plains as floodwaters receded to the main channel of the river. Livestock also benefited from the succession of rain-fed pastures on the uplands and flood-recession pastures on the plains. Fish were abundant. As many as 30,000 tons were caught yearly. Since the early 1970s, small irrigated rice schemes added a fifth element to the production array: rain-fed farming, recession farming, herding, fishing, and irrigation.

Completion of the Diama salt intrusion barrage near the mouth of the river between Senegal and Mauritania and Manantali High Dam more than 1000 km upstream in Mali (Fig.  1.15 ), and the termination of the annual flood have had adverse effects on the environment. Rather than insulating the people from the ravages of drought, the dam release policy can accelerate desertification and intensify food insecurity. Furthermore, anticipation of donor investments in huge irrigation schemes has, in this particular case, lead to the expulsion of non-Arabic-speaking black Mauritanians from their floodplain lands.

Senegal River and its Manantali Reservoir more than 1000 km upstream in Mali

This is a common impact of dam construction: increased hardships of generally politically powerless people in order that urban and industrial sectors may enjoy electricity at reduced costs.

Studies in the Senegal Valley by anthropologists, hydrologists, agronomists, and others suggest that it may be entirely economically feasible to create a controlled annual “artificial flood,” assuring satisfaction of both urban, industrial, and rural demands for the river’s water and supporting groundwater recharge, reforestation, and biodiversity.

Because of these studies, the government of Senegal ended its opposition to an artificial flood, and its development plans for the region are now predicated on its permanence. However, due to the common belief that releasing large quantities of water to create an artificial flood is incompatible with maximum hydropower production, the other members of the three-country consortium managing the dams—Mali and Mauritania—have resisted accepting this policy.

1.2.10 Nile Basin Countries Striving to Share Its Benefits

The Nile River (Fig.  1.16 ) is one of the major rivers of the world, serving millions and giving birth to entire civilizations. It is one of the world’s longest rivers , traversing about 6695 km from the farthest source of its headwaters in Rwanda and Burundi through Lake Victoria, to its delta in Egypt on the Mediterranean Sea. Its basin includes 11 African countries (Burundi, DR Congo, Egypt, Eritrea, Ethiopia, Kenya, Rwanda, South Sudan, The Sudan, and Tanzania) and extends for more than 3 million square kilometers which represents about 10% of Africa’s land mass area. The basin includes the Sudd wetland system in South Sudan.

The Nile River Basin

Nile Basin countries are today home to more than 437 million people and of these, 54% (238 million) live within the basin and expect benefits from the management and use of the shared Nile Basin water resources.

Notwithstanding the basin’s natural and environmental endowments and rich cultural history, its people face considerable challenges including persistent poverty with millions living on less than a dollar a day; extreme weather events associated with climate variability and change such as floods and droughts; low access to water and sanitation services; deteriorating water quality ; and very low access rate to modern energy with most countries below 20% access level . The region also has a history of tensions and instability both between states and internal to states.

Cooperative management and development could bring a vast range of benefits including increased hydropower and food production; better access to water for domestic use; improved management of watersheds and reduced environmental degradation; reduced pollution and more control over damage from floods and droughts. Recognizing this the Nile Basin Initiative was created as a regional intergovernmental partnership that seeks to develop the River Nile in a cooperative manner, share substantial socioeconomic benefits, and promote regional peace and security. The partnership includes 10 Member States namely Burundi, DR Congo, Egypt, Ethiopia, Kenya, Rwanda, South Sudan, The Sudan, Tanzania, and Uganda. Eritrea participates as an observer. NBI was conceived as a transitional institution until a permanent institution can be created.

The partnership is guided by a Shared Vision: “To achieve sustainable socio-economic development through equitable utilization of, and benefit from, the common Nile Basin Water resources.” The shared belief is that countries can achieve better outcomes for all the peoples of the Basin through cooperation rather than competition. It is supported by a “Shared Vision Planning Model” built by experts from all the basin countries. The model is designed to run different scenarios and assess the basin-wide impacts of different management policies and assumptions that any country may wish to perform.

1.2.11 Shrinking Glaciers at Top of the World

As shown in Fig.  1.17 , Tibet lies north of India, Nepal, Bhutan, and Myanmar, west of China, and south of East Turkistan. The highest and largest plateau on Earth, it stretches some 1500 miles (2400 km) from east to west, and 900 miles (1448 km) north to south, an area equivalent in size to the United States region east of the Mississippi River. The Himalayas form much of its southern boundary, and Tibet’s average altitude is so high—11,000 feet (3350 km) above sea level—that visitors often need weeks to acclimate.

China, India, and Southeast Asia, highlighting the Tibetan Plateau

The Tibetan Plateau serves as the headwaters for many of Asia’s largest rivers, including the Yellow, Yangtze, Mekong, Brahmaputra, Salween, and Sutlej, among others. A substantial portion of the world’s population lives in the watersheds of the rivers whose sources lie on the Tibetan Plateau.

Recent studies—including several by the Chinese Academy of Sciences—have documented a host of serious environmental challenges involving the quantity and quality of Tibet’s freshwater reserves, most of them caused by industrial activities. Deforestation has led to large-scale erosion and siltation. Mining, manufacturing, and other human and industrial activities are producing record levels of air and water pollution in Tibet, as well as elsewhere in China (Wong 2013 ). Together, these factors portend future water scarcity that could add to the region’s political volatility.

Most important is that the region’s glaciers are receding at one of the fastest rates anywhere in the world, and in some regions of Tibet by three 3 m per year (IPPC 2007 ). The quickening melting and evaporation is raising serious concerns in scientific and diplomatic communities, in and outside China, about Tibet’s historic capacity to store more freshwater than anyplace on earth, except the North and South Poles. Tibet’s water resources, they say, have become an increasingly crucial strategic political and cultural element that the Chinese are intent on managing and controlling.

1.2.12 China, a Thirsty Nation

Why does China care about the freshwater in Tibet? With more than a quarter of its land classified as desert, China is one of the planet’s most arid regions. Beijing is besieged each spring by raging dust storms born in Inner Mongolia where hundreds of square miles of grasslands are turning to desert each year. In other parts of the nation, say diplomats and economic development specialists, Chinese rivers are either too polluted or too filled with silt to provide all of China’s people with adequate supplies of freshwater.

Chinese authorities have long had their eyes on Tibet’s water resources. They have proposed building dams for hydropower and spending billions of dollars to build a system of canals to tap water from the Himalayan snowmelt and glaciers and transport it hundreds of miles north and east to the country’s farm and industrial regions.

But how long that frozen reservoir will last is in doubt. In attempting to solve its own water crisis, China could potentially create widespread water shortages among its neighbors.

While the political issues involving Tibet are complex, there is no denying that water plays a role in China’s interest in the region. The water of Tibet may prove to be one of its most important resources in the long run—for China, and for much of southern Asia. Figuring out how to sustainably manage that water will be a key to reducing political conflicts and tensions in the region.

1.2.13 Managing Sediment in China’s Yellow River

The scarcity of water is not the only issue China has to address. So is sediment, especially in the Yellow River (Fig.  1.18 ). The Yellow River basin is the cradle of Chinese civilization, with agricultural societies appearing on the banks of the river more than 7000 years ago. The Yellow River originates in the Qinghai–Tibetan plateau and discharges into the Bohai Gulf in the Yellow sea. The basin is traditionally divided into the upper, middle, and lower reaches, which can be described as three down-sloping steps: the Tibetan Plateau, the Loess Plateau, and the alluvial plain. Key management issues are many, but the most visible one is sediment (Figs.  1.19 and 1.20 ).

The Yellow River Basin in China

The high sediment load of the Yellow River is a curse if the sediment deposits on the bed of the channel and reduces its capacity, thereby increasing the risk of flooding. Also, rapid deposition of sediment in reservoirs situated along the river is a problem as it reduces their effectiveness for flood control and water storage.

Another major management issue is the ecosystem health of the river. The relative scarcity of water creates a tension between allocating water for the benefit of river health, and for direct social and economic benefit. Irrigation uses 80% of the water consumed from the river, with the rest supplying industry, and drinking water for cities along the river and outside of the basin (Tianjin, Cangzhou and Qingdao). During the 1980s and 1990s the lower river dried up nearly every year, resulting in lost cereal production, suspension of some industries, and insufficient water supplies for more than 100,000 residents, who had to queue daily for drinking water. As well as costing around RmB40 billion in lost production, there was a serious decline in the ecological health of the river.

The diversity of habitat types and extensive areas of wetlands within the Ramsar-listed Yellow River Delta support at least 265 bird species. The birds, fish, and macroinvertebrates in the delta rely on healthy and diverse vegetation communities, which in turn depend upon on annual freshwater flooding and the associated high sediment loads. Degradation of the ecosystem of the Delta has been documented, especially from the late-1990s, due to increased human activities and a significant decrease in the flow of freshwater to the Delta wetlands. This has led to saltwater intrusion and increased soil salinity. Restoration activities involving the artificial delivery of freshwater to the wetlands began in 2002.

figure 19

Sediment flows in China’s Yellow River. http://yellowriver-china.blogspot.com/2011/09/book-review-on-flood-discharge-and.html

figure 20

Dams can be designed and operated to remove some of the sediment that is trapped in the upstream reservoir

1.2.14 Damming the Mekong (S.E. Asia), the Amazon, and the Congo

The world’s most biodiverse river basins—the Amazon, Congo, and Mekong—are attracting hydropower developers. While hydropower projects address energy needs and offer the potential of a higher standard of living, they also can impact the river’s biodiversity, especially fisheries. The Amazon, Congo, and Mekong basins hold roughly one-third of the world’s freshwater fish species, most of which are not found elsewhere. Currently more than 450 additional dams are planned for these three rivers (see Figs.  1.22 and 1.23 ) (Winemiller et al. 2016 ). Many of the sites most appropriate for hydropower production also are the habitats of many fish species. Given recent escalation of hydropower development in these basins, planning is needed to reduce biodiversity loss , as well as other adverse environmental, social, and economic impacts while meeting the energy needs of the basins.

The Mekong River (Fig.  1.21 ) flows some 4200 km through Southeast Asia to the South China Sea through Tibet, Myanmar (Burma), Vietnam, Laos, Thailand, and Cambodia. Its “development” has been restricted over the past several decades due to regional conflicts, indeed conflicts that have altered the history of the world. Now that these conflicts are not resulting in military battles (at this writing), investment capital is becoming available to develop the Mekong’s resources for improved fishing, irrigation, flood control, hydroelectric power , tourism, recreation , and navigation . The potential benefits are substantial, but so are the environmental, ecological, and social risks (Orr et al. 2012 ).

The Lower Mekong River Basin including Tonle Sap Lake in Cambodia and the Mekong Delta in Vietnam

The economic value of hydroelectric power currently generated from the Mekong brings in welcome income however the environmental impacts are harder to quantify. Today some 60 million people (12 million households) live in the Lower Mekong Basin, and 80% rely directly on the river system for their food and livelihoods. Most of these households would be affected by alterations to fish availability since fish is their main source of dietary protein. The food security impacts on these people due to the existing and proposed dam building and operation in Cambodia, Laos, Thailand, and Vietnam remain relatively unexplored. Dam builders have often failed to recognize, or wish to ignore, the crucial role of inland fisheries in meeting food security needs.

During some months of the year the lack of rainfall causes the Mekong to fall dramatically. Salt water may penetrate as much as 500 km inland. In other months the flow can be up to 30 times the low flows, causing the water in the river to back up into wetlands and flood some 12,000 km 2 of forests and paddy fields in the Vietnamese delta region alone. The ecology of a major lake, Tonle Sap, in Cambodia depends on these backed up waters.

While flooding imposes risks on the inhabitants of the Mekong flood plain, there are also distinct advantages. High waters deposit nutrient-rich silts on the low-lying farmlands, thus sparing the farmers from having to transport and spread fertilizers on their fields. Also, shallow lakes and submerged lands provide spawning habitats for about 90% of the fish in the Mekong basin. Fish yield totals over half a million tons annually.

What will happen to the social fabric and to the natural environment if the schemes to build big dams (see Fig.  1.22 a) across the mainstream of the Mekong are implemented? Depending on their design , location, and operation, they could disrupt the current fertility cycles and the habitats and habits of the fish in the river resulting from the natural flow and sediment regimes. Increased erosion downstream from major reservoirs is also a threat. Add to these possible adverse impacts the need to evacuate and resettle thousands of people displaced by the lake behind the dams. How will they be resettled? And how long will it take them to adjust to new farming conditions? And will there even be a Delta? Together with sea level rise and a blockage of Mekong’s sediment to the Delta, its survival as a geologic feature, and as a major source of food, is in doubt.

Lancang/Mekong River where reservoirs are being planned on the river itself ( a ) and on many of its tributaries ( b ). a http://khmerization.blogspot.com/2013/10/wwf-expresses-alarm-over-laos-decision.html , 6/10/13, and b reprinted from Wild and Loucks 2014, with permission. © 2014. American Geophysical Union

There have been suggestions that a proposed dam in Laos could cause deforestation in a wilderness area of some 3000 km 2 . Much of the wildlife, including elephants, big cats, and other rare animals, would have to be protected if they are not to become endangered. Malaria-carrying mosquitoes, liver fluke, and other disease bearers might find ideal breeding grounds in the mud flats of the shallow reservoir. These are among the types of issues that need to be considered now that increased development seems likely.

Similar issues face those who are planning similar hydropower dam developments in the other two most biodiverse river basins in the world—the Amazon and the Congo (Fig.  1.23 ). Clarifying the trade-offs between energy (economic), environmental, and social goals can inform governments and funding institutions as they make their dam siting, design , and operating decisions.

Fish diversity and dam locations in the Amazon and Congo basins. In addition to basin-wide biodiversity summaries ( upper left ), each basin can be divided into ecoregions ( white boundaries ). Approximate number of species ( black numbers ) and the total species richness ( shades of green ) found in ecoregions differ widely (Winemiller et al. 2016 )

Hydropower accounts for more than two-thirds of Brazil’s energy supply, and over 300 new Amazon dams have been proposed. Impacts of these dams would extend beyond direct effects on rivers to include relocation of human populations and expanding deforestation associated with new roads. Scheduled for completion in 2016, Brazil’s Belo Monte hydropower complex was designed with installed capacity of 11,233 MW, ranking it the world’s third largest. But it could also set a record for biodiversity loss owing to selection of a site that is the sole habitat for many species. The Congo has far fewer dams than the Amazon or Mekong, yet most power generated within the basin is from hydropower. Inga Falls, a 14.5-km stretch of the lower Congo that drops 96 m to near sea level, has greater hydropower potential than anywhere else. The Inga I and II dams, constructed in the 1970s and 1980s, currently yield 40% of the 2132-MW installed capacity. Planned additional dams (Inga III and Grand Inga) would harness as much as 83% of the Congo’s annual discharge, with most of the energy to be exported. Grand Inga would divert water and substantially reduce flow for at least 20 km downstream from the falls. Again, many trade-offs involved with dam building, and all calling for comprehensive systems planning and analyses to identify them.

1.3 So, Why Plan, Why Manage?

Water resources planning and management activities are usually motivated, as they were in each of the previous section’s case examples, by the realization that there are problems to solve and/or opportunities to obtain increased benefits by changing the management and use of water and related land resources. These benefits can be measured in many different ways. The best way to do it is often not obvious. Whatever way is proposed may provoke conflict. Hence there is the need for careful study and research, as well as full stakeholder involvement, in the search for the best compromise plan or management policy.

Reducing the frequency and/or severity of the adverse consequences of droughts, floods, and excessive pollution are common goals of many planning and management exercises. Other reasons include the identification and evaluation of alternative measures that may increase the available water supplies, hydropower, improve recreation and/or navigation, and enhance water quality and aquatic ecosystems . Quantitative system performance criteria can help one judge the relative net benefits , however measured, of alternative plans and management policies.

System performance criteria of interest have evolved over time. They have ranged from being primarily focused on safe drinking water just a century ago to multipurpose economic development a half-century ago to goals that now include environmental and ecosystem restoration and protection, aesthetic and recreational experiences, and more recently, sustainability (ASCE 1998 ; GTT 2014 ).

Some of the multiple purposes served by a river can be conflicting. A reservoir used solely for hydropower, or water supply, is better able to meet its objectives when it is full of water. On the other hand, a reservoir used solely for downstream flood control is best left empty so it can store more of the flood flows when they occur. A single reservoir serving all three purposes introduces conflicts over how much water to store in it and discharge from it, i.e., how it should be operated. In basins where diversion demands exceed the available supplies, conflicts will exist over water allocations . Finding the best way to manage, if not resolve, these conflicts are reasons for planning.

1.3.1 Too Little Water

Issues involving inadequate supplies to meet demands can result from too little rain or snow. They can also result from patterns of land and water use. They can result from growing urbanization, the growing needs to meet instream flow requirements, and conflicts over private property and public rights regarding water allocations . Other issues can involve transbasin water transfers and markets, objectives of economic efficiency versus the desire to keep nonefficient activities viable, and demand management measures, including incentives for water reuse and water reuse financing.

Measures to reduce the demand for water in times of supply scarcity should be identified and agreed upon before everyone must cope with an actual water scarcity. The institutional authority to implement drought measures when their designated “triggers”—such as storage volumes in reservoirs—have been met should be established before they are needed. Such management measures may include increased groundwater abstractions to supplement low-surface water flows and storage volumes. Conjunctive use of ground and surface waters can be sustainable as long as the groundwater aquifers are recharged during conditions of high flow and surface storage volumes. Many aquifers are subject to withdrawals exceeding recharge, and hence continued withdrawals from them cannot be sustained.

1.3.2 Too Much Water

Damage due to flooding is a direct result of floodplain development that is incompatible with floods. This is a risk many take, and indeed on average it may result in positive private net benefits, especially when public agencies subsidize these private risk takers who incur losses in times of flooding. In many river basins of developed regions, annual expected flood damages are increasing over time, in spite of increased expenditures in flood damage reduction measures. This is in part due to increased economic development taking place on river flood plains, not only of increased frequencies and magnitudes of floods.

The increased economic value of developments on floodplains often justifies increased development and increased expenditures on flood damage reduction measures. Flood protection works decrease the risks of flood damage, creating an even larger incentive for increased economic development. Then when a flood exceeding the capacity of existing flood protection works occurs, and it will, even more damage results. This cycle of increasing flood damages and costs of protection is a natural result of increasing values of flood plain development. Just what is the appropriate level of risk? It may depend, as Fig.  1.24 illustrates, on the level of flood insurance or subsidy provided when flooding occurs.

The lowest risk of flooding on a floodplain does not always mean the best risk, and what risk is acceptable may depend on the amount of insurance or subsidy provided when flood damage occurs

Flood damages will decrease only if there are restrictions placed on floodplain development. Analyses carried out during planning can help identify the appropriate level of development and flood damage protection works based on the beneficial as well as adverse economic, environmental, and ecological consequences of flood plain development. People are increasingly recognizing the economic as well as environmental and ecological benefits of allowing floodplains to do what they were formed to do—store flood waters when floods occur.

Industrial development and related port development may result in the demand for deeper and wider rivers to allow the operation of larger draft cargo vessels in the river. River channel improvement cannot be detached from functions such as water supply and flood control. Widening and deepening a river channel for shipping purposes may also decrease flood water levels.

1.3.3 Too Polluted

Wastewater discharges by industry and households can have considerable detrimental effects on water quality and hence on public and ecosystem health. Planning and management activities should pay attention to these possible negative consequences of industrial development and the intensive use and subsequent runoff of pesticides and fertilizers in urban as well as in agricultural areas.

Issues regarding the environment and water quality include:

Upstream versus downstream conflicts on meeting water quality standards,

Threats from aquatic nuisance species,

Threats from the chemical, physical, and biological water quality of the watershed’s aquatic resources,

Quality standards for recycled water,

Nonpoint source pollution discharges including sediment from erosion, and

Inadequate groundwater protection, compacts, and concerned institutions.

We still know too little about the environmental and health impacts of many of the wastewater constituents found in river waters. As more is learned about, for example, the harmful effects of heavy metals and dioxins, pharmaceutical products, and micropollutants and nanoparticles in our water supplies, water quality standards, plans and management policies should be adjusted accordingly. The occurrence of major fish kills and algae blooms also point to the need to manage water quality as well as quantity.

1.3.4 Too Expensive

Too many of the world’s population do not have adequate water to meet all of their drinking and sanitation needs. Much of this is not due to the lack of technical options available to provide water to meet those needs. Rather those options are deemed to be too expensive. Doing so is judged to be beyond the ability of those living in poverty to pay and recover the costs of implementing, maintaining, and operating the needed infrastructure. Large national and international aid grants devoted to reducing water stress—demands for clean water exceeding usable supplies—in stressed communities have not been sustainable in the long run where recipients have been unable to pay for the upkeep of whatever water resource systems are developed and provided. If financial aid is to be provided, to be effective it has to address all the root causes of such poverty, not only the need for clean water.

1.3.5 Ecosystem Too Degraded

Aquatic and riparian ecosystems may be subject to a number of threats. The most important ones include habitat loss due to river training and reclamation of floodplains and wetlands for urban and industrial development, poor water quality due to discharges of pesticides, fertilizers and wastewater effluents, and the infestation of aquatic nuisance species.

Exotic aquatic nuisance species can be major threats to the chemical, physical, and biological water quality of a river’s aquatic resources and a major interference with other uses. The destruction and/or loss of the biological integrity of aquatic habitats caused by introduced exotic species is considered by many ecologists to be among the most important problems facing natural aquatic and terrestrial ecosystems. Biological integrity of natural ecosystems is controlled by habitat quality, water flows or discharges, water quality , and biological interactions including those involving exotic species.

Once exotic species are established, they are usually difficult to manage and nearly impossible to eliminate. This creates a costly burden for current and future generations. The invasion in North America of nonindigenous aquatic nuisance species such as the sea lamprey, zebra mussel, purple loosestrife, European green crab, and various aquatic plant species, for example, has had pronounced economic and ecological consequences for all who use or otherwise benefit from aquatic ecosystems.

Environmental and ecological effectiveness as well as economic efficiency should be a guiding principle in evaluating alternative solutions to problems caused by aquatic nuisance organisms. Funds spent in prevention and early detection and eradication of aquatic nuisance species may reduce the need to spend considerably more funds on management and control once such aquatic nuisance species are well established.

1.3.6 Other Planning and Management Issues

1.3.6.1 navigation.

Dredging river beds is a common practice to keep river channels open for larger draft cargo ships. The use of jetties as a way to increase the flow in the main channel and hence increase bottom scour is a way to reduce the amount of dredging that may be needed, but any modification of the width and depth of a river channel can impact its flood carrying capacity. It can also alter the periodic flooding of the floodplain that in turn can have ecological impacts.

1.3.6.2 River Bank Erosion

Bank erosion can be a serious problem where towns are located close to morphologically active (eroding) rivers. Predictions of changes in river courses due to bank erosion and bank accretion are important inputs to land use planning in river valleys and the choice of locations for bridges, buildings, and hydraulic structures.

1.3.6.3 Reservoir Related Issues

Degradation of the riverbeds upstream of reservoirs may increase the risks of flooding in those areas. Reservoir construction inevitably results in loss of land and forces the evacuation of residents due to impoundment. Reservoirs can be ecological barriers for migrating fish species such as salmon. The water quality in the reservoir may deteriorate and the inflowing sediment may settle and accumulate, reducing the active (useful) water storage capacity of the reservoir and causing more erosion downstream. Other potential problems may include those stemming from stratification , water-related diseases, algae growth , and abrasion of hydropower turbines.

Environmental and morphological impacts downstream of the dam are often due to a changed river hydrograph and decreased sediment load in the water released from the reservoir. Lower sediment concentrations result in higher risks of scouring of downstream riverbeds and consequently a lowering of their elevations. Economic as well as social impacts include the risk of a dam break. Environmental impacts may result from sedimentation control measures (e.g., sediment flushing as shown in Fig.  1.19 ) and reduced oxygen content of the outflowing water.

1.4 System Planning Scales

1.4.1 spatial scales for planning and management.

Watersheds or river basins are usually considered logical regions for water resources planning and management. This makes sense if the impacts of decisions regarding water resources management are contained within the watershed or basin. How land and water are managed in one part of a river basin can impact the land and water in other parts of the basin. For example, the discharge of pollutants or the clearing of forests in the upstream portion of the basin may degrade the quality and increase the variability of the flows and sedimentation downstream. The construction of a dam or weir in the downstream part of a river may block vessels and fish from traveling up- or downstream through the dam site. To maximize the economic and social benefits obtained from the entire basin, and to insure that these benefits and accompanying costs are equitably distributed, planning and management on a basin scale is often undertaken.

While basin boundaries make sense from a hydrologic point of view, they may be inadequate for addressing particular water resources problems that are caused by events taking place outside the basin. What is desired is the highest level of performance, however defined, of the entire physical, social-economic, and administrative water resource system. To the extent that the applicable problems, stakeholders, and administrative boundaries extend outside the river basin, then the physically based “river basin” focus of planning and management should be expanded to include the entire applicable “problem-shed.” Hence consider the term “river basin” used in this book to mean problem-shed when appropriate.

1.4.2 Temporal Scales for Planning and Management

Planning is a continuing iterative process. Water resources plans need to be periodically updated and adapt to new information, new objectives , and updated forecasts of future demands, costs , and benefits. Current decisions should not preclude future generations from options they may want to consider, but otherwise current decisions should be responsive to current needs and opportunities, and have the ability to be adaptable in the future to possible changes in those needs and opportunities.

The number and duration of within-year time periods explicitly considered in the planning process will depend in part on the need to consider the variability of the supplies of and demands for water resources and on the purposes to be served by the water resources. Irrigation planning and summer season water recreation planning may require a greater number of within-year periods during the summer growing and recreation season than might be the case if one were considering only municipal water supply planning, for example. Assessing the impacts of alternatives for conjunctive surface and groundwater management , or for water quantity and quality management, require attention to processes that typically take place on different spatial and temporal scales.

1.5 Planning and Management Approaches

There are two general approaches to planning and management. One is from the top-down, often called command and control. The other is from the bottom-up, often called the grassroots approach. Both approaches, working together, can lead to an integrated plan and management policy.

1.5.1 Top-Down Planning and Management

Over much of the past half-century water resources professionals have been engaged in preparing integrated, multipurpose “master” development plans for many of the world’s river basins. These plans typically consist of a series of reports, complete with numerous appendices, describing all aspects of water resources management and use. In these documents alternative structural and nonstructural management options are identified and evaluated. Based on these evaluations, the preferred plan is recommended.

This master planning exercise has typically been a top-down approach. Professionals have dominated the top-down approach. Using this approach there is typically little if any active participation of interested stakeholders . The approach assumes that one or more institutions have the ability and authority to develop and implement the plan, i.e., to oversee and manage the coordinated development and operation of the basin’s activities impacting the surface and ground waters of the basin. In today’s environment where publics are calling for less government oversight, regulation and control, and increasing participation in planning and management activities, strictly top-down approaches are becoming less desirable or acceptable.

1.5.2 Bottom-Up Planning and Management

Within the past several decades water resources planning and management processes have increasingly involved the active participation of interested stakeholders—those potentially affected by the decision being considered. Plans are being created from the bottom-up rather than top-down through a process of consensus building. Concerned citizens, nongovernmental organizations, as well as professionals in governmental agencies are increasingly working together toward the creation of adaptive comprehensive water management programs, policies, and plans.

Experiences trying to implement plans developed primarily by professionals without significant citizen involvement have shown that even if such plans are technically sound they have little chance of success if they do not take into consideration the concerns and objectives of affected stakeholders . To gain their support, concerned stakeholders must be included in the decision-making process as early as possible. They must become part of the decision-making process, not merely spectators, or even advisors, to it. This will help gain their cooperation and commitment to the plans eventually adopted. Participating stakeholders will consider the resulting plans as their plans as much as someone else’s. They will have a sense of ownership, and as such will strive to make them work. Such adopted plans, if they are to be successfully implemented, must fit within existing legislative, permitting, enforcement, and monitoring programs. Stakeholder participation improves the chance that the system being managed will be sustainable.

Successful planning and management involves motivating all potential stakeholders and sponsors to join and participate in the water resources planning and management process. It will involve building a consensus on goals and objectives and on how to achieve them. Ideally this should occur before addressing conflicting issues so that all involved know each other and are able to work together more effectively. Agreements on goals and objectives and on the organization (or group formed from multiple organizations) that will lead and coordinate the water resources planning and management process should be reached before stakeholders bring their individual priorities or problems to the table. Once the inevitable conflicts become identified, the settling of administrative matters does not get any easier.

Bottom-up planning must strive to achieve a common or “shared” vision among all stakeholders. It must either comply with all applicable laws and regulations, or propose changes to them. It should strive to identify and evaluate multiple alternatives and performance criteria —including sustainability criteria, and yet keep the process from producing a wish list of everything each stakeholder wants. In other words, it must identify trade-offs among conflicting goals or measures of performance, and prioritizing appropriate strategies. It must value and compare, somehow, the intangible and nonmonetary impacts of environmental and ecosystem protection and restoration with other activities whose benefits and costs can be expressed in monetary units. In doing all this, planners should use modern information technology, as available, to improve both the process and product. This technology, however, will not eliminate the need to reach conclusions and make decisions on the basis of incomplete and uncertain data and scientific knowledge.

These process issues emphasize the need to make water resources planning and management as efficient and effective as possible and remain participatory. Many issues will arise in terms of evaluating alternatives and establishing performance criteria (prioritizing issues and possible actions), performing incremental cost analysis, and valuing monetary and nonmonetary benefits. Questions must be answered as to how much data must be collected and with what precision, and what types of modern information technology (e.g., geographic information systems (GIS), remote sensing, Internet and mobile Internet networks , decision support systems, etc.) can be beneficially used both for analyses as well as communication.

1.5.3 Integrated Water Resources Management

The concept of integrated water resources management (IWRM) has been developing over the past several decades. IWRM is the response to the growing pressure on our water resources systems caused by growing populations and socioeconomic developments. Water shortages and deteriorating water quality have forced many countries in the world to reconsider their development policies with respect to the management of their water resources. As a result water resources management (WRM) has been undergoing a change worldwide, moving from a mainly supply-oriented, engineering-biased approach toward a demand-oriented, multisectoral approach, often labeled integrated water resources management.

The concept of IWRM moves away from top-down “water master planning” that usually focuses on water availability and development, and toward “comprehensive water policy planning” that addresses the interaction between different subsectors (Fig.  1.25 ), seeks to establish priorities, considers institutional requirements, and deals with the building of management capacity.

Interactions among the natural, administrative, and socioeconomic water resource subsectors and between them and their environment

Box 1.1 Definition of IWRM

IWRM is a process which promotes the coordinated development and management of water, land, and related resources, in order to maximize the resultant economic and social welfare in an equitable manner without compromising the sustainability of vital ecosystems.

(GWP 2000 )

IWRM (Box 1.1) considers the use of the resources in relation to social and economic activities and functions. These determine the need for laws and regulations pertaining to the sustainable and beneficial use of the water resources. Infrastructure together with regulatory measures allows more effective use of the resource including meeting ecosystem needs.

1.5.4 Water Security and the Sustainable Development Goals (SDGs)

While IWRM focuses on the process to improve water management (the how), the term “water security” focuses on the output (the what). The World Economic Forum has identified Water Security as one of the biggest global economic development issues. Water Security is defined by UN-Water ( 2013 ) as

the capacity of a population to safeguard sustainable access to adequate quantities of acceptable quality water for sustaining livelihoods, human well-being, and socio-economic development, for ensuring protection against water-borne pollution and water-related disasters, and for preserving ecosystems in a climate of peace and political stability.

Attempts are being made to identify the many dimensions of water security and to quantify them (van Beek and Arriens 2014 ; ADB 2016 ). In 2015 the UN adopted the Sustainable Development Goals 2015–2030 that specify specific targets for various goals such as the provision of water for drinking and sanitation, water productivity in agriculture , industry and energy, environment, and reduction of floods and droughts. It is expected that many countries will expect their water managers to use the SDGs as objectives in water resources planning. This means that our planning and management proposals need to be able to quantify the impacts of possible plans and policies in terms of the SDG targets.

1.5.5 Planning and Management Aspects

1.5.5.1 technical.

Technical aspects of planning include hydrologic assessments. Hydrologic assessments identify and characterize the properties of, and interactions among, the resources in the basin or region. This includes the land, the rainfall, the runoff , the stream and river flows, and the groundwater .

Existing watershed land use and land cover, and future changes in this use and cover, result in part from existing and future changes in regional population and economy. Planning involves predicting changes in land use/covers and economic activities at watershed and river basin levels. These will influence the amount of runoff , and the concentrations of sediment and other quality constituents (organic wastes, nutrients, pesticides, etc.) in the runoff resulting from any given pattern of rainfall over the land area. These predictions will help planners estimate the quantities and qualities of flows throughout a watershed or basin, associated with any land use and water management policy. This in turn provides the basis for predicting the type and health of terrestrial and aquatic ecosystems in the basin. All of this may impact the economic development of the region, which is what, in part, determines the future demands for changes in land use and land cover.

Technical aspects also include the estimation of the costs and benefits of any measures taken to manage the basin’s water resources. These measures might include:

Engineering structures for making better use of scarce water.

Canals and water-lifting devices.

Dams and storage reservoirs that can retain excess water from periods of high flow for use during the periods of low flow. By storage of floodwater they may also reduce flood damage below the reservoir.

Open channels that may take the form of a canal, flume, tunnel, or partly filled pipe.

Pressure conduits.

Diversion structures, ditches, pipes, checks, flow dividers, and other engineering facilities necessary for the effective operation of irrigation and drainage systems.

Municipal and industrial water intakes, including water purification plants and transmission facilities.

Sewerage and industrial wastewater treatment plants, including waste collection and ultimate disposal facilities.

Hydroelectric power storage, run-of-river, or pumped storage plants.

River channel regulation works, bank stabilization, navigation dams and barrages, navigation locks, and other engineering facilities for improving a river for navigation.

Levees and floodwalls for confining flows within predetermined channels.

Not only must the planning process identify and evaluate alternative management strategies involving structural and nonstructural measures that will incur costs and bring benefits, but it must also identify and evaluate alternative time schedules for implementing those measures. The planning of development over time involving interdependent projects, uncertain future supplies and demands as well as costs, benefits, and interest (discount) rates is part of all water resources planning and management processes.

With increasing emphasis placed on ecosystem preservation and enhancement, planning must include ecologic impact assessments. The mix of soil types and depths and land covers together with the hydrological quantity and quality flow and storage regimes in rivers, lakes, wetlands , and aquifers all impact the riparian and aquatic ecology of the basin. Water managers are being asked to consider ways of improving or restoring ecosystems by, for example, reducing the

destruction and/or loss of the biological integrity of aquatic habitats caused by introduced exotic species or changes in flow and sediment patterns due to upstream reservoir operation .

decline in number and extent of wetlands and the adverse impacts to wetlands of proposed land and water development projects.

conflicts between the needs of people for water supply, recreational, energy, flood control, and navigation infrastructure and the needs of ecological communities, including endangered species.

And indeed there are and will continue to be conflicts among alternative objectives and purposes of water management. Planners and managers must identify the trade-offs among environmental, ecologic, economic, and social impacts, however measured, and the management alternatives that balance these often-conflicting interests .

1.5.5.2 Financial and Economic

The overriding financial component of any planning process is to make sure that the recommended plans and projects will be able to pay for themselves. Revenues are needed to recover construction costs, if any, and to maintain, repair, and operate any infrastructure designed to manage the basin’s water resources. This may require cost-recovery policies that involve pricing the outputs of projects. Recognizing water as an economic good does not always mean that full costs should be charged. Poor people have the right to safe water and how this is to be achieved should be taken into account. Yet beneficiaries should be expected to pay at least something for the added benefits they get. Planning must identify equitable cost and risk-sharing policies and improved approaches to risk/cost management.

Financial viability is often viewed as a constraint that must be satisfied. It is not viewed as an objective whose maximization could result in a reduction in economic efficiency, equity , or other nonmonetary objectives . In many developing countries a distinction is made between the recovery of investment costs and the recovery of O&M costs. Recovery of O&M costs is a minimum condition for a sustainable project. Without that, it is likely that the performance of the project will deteriorate over time.

Many past failures in water resources management are attributable to the fact that water—its quantity, reliability , quality, pressure, location—has been and still is viewed as a free good. Prices paid for irrigation and drinking water are in many countries well below the full cost of the infrastructure and personnel needed to provide that water, which comprises the capital charges involved, the operation and maintenance (O&M) costs, the opportunity cost , economic and environmental externalities (see GWP 2000 ). Charging for water at less than full cost means that the government, society, and/or environment “subsidizes” water use and leads to an inefficient use of the resource.

1.5.5.3 Institutional and Governance

The first condition for the successful implementation of plans and policies is to have an enabling environment. There must exist national, provincial, and local policies, legislation and institutions that make it possible for the desired decisions to be taken and implemented. The role of the government is crucial. The reasons for governmental involvement are manifold:

Water is a resource beyond property rights: it cannot be “owned” by private persons. Water rights can be given to persons or companies, but only the rights to use the water and not to own it. Conflicts between users automatically turn up at the table of the final owner of the resource—the government.

Water is a resource that often requires large investments to develop, treat, store, distribute, and use, and then to collect, treat, and dispose or reuse. Examples are multipurpose reservoirs and the construction of dykes along coasts and rivers. The required investments are large and typically can only be made by governments or state-owned companies.

Water is a medium that can easily transfer external effects. The use of water by one activity often has negative effects on other water using activities (externalities). The obvious example is the discharge of wastewater into a river may save the discharger money but it may have negative effects on downstream users requiring cleaner water.

Only the government can address many of these issues and hence “good governance” is necessary for good water management. An insufficient institutional setting and the lack of a sound economic base are the main causes of water resources development project failure , not technical inadequacy of design and construction. This is also the reason why at present much attention is given to institutional developments and governance in both developed and developing regions and countries.

In Europe, various types of water agencies are operational (e.g., the Agence de l’Eau in France and the water companies in England), each having advantages and disadvantages. The Water Framework Directive of the European Union requires that water management be carried out at the scale of a river basin, particularly when this involves transboundary management. It is very likely that this will result in a shift in responsibilities of the institutions involved and the establishment of new institutions. In other parts of the world experiments are being carried out with various types of river basin organizations, combining local, regional, and sometimes national governments.

1.5.5.4 Models for Impact Prediction and Evaluation

Planning processes have undergone a significant transformation over the past five decades, mainly due to the continuing development of improved computational technology. Planning today is heavily dependent on the use of computer-based impact prediction models. Such models are used to assist in the identification and evaluation of alternative ways of meeting various planning and management objectives. They provide an efficient way of using spatial and temporal data in an effort to predict the interaction and impacts, over space and time, of various river basin components under alternative designs and operating policies.

Many of the systems analysis approaches and models discussed in the following chapters of this book have been, and continue to be, central to the planning and management process. Their usefulness is directly dependent on the quality of the data and models being used. Models can assist planning and management at different levels of detail. Some models are used for preliminary screening of alternative plans and policies, and as such do not require major data collection efforts. Screening models can also be used to estimate how significant certain data and assumptions are to the decisions being considered, and hence can help guide additional data collection activities. At the other end of the planning and management spectrum, much more detailed models can be used for engineering design . These more complex models are more data demanding, and typically require higher levels of expertise for their proper use.

The integration of modeling technology into the social and political components of the planning and management processes in a way that enhances those processes continues to be the main challenge of those who develop planning and management models . Efforts to build and apply interactive generic modeling programs or “shells” into which interested stakeholders can “draw in” their system, enter their data and operating rules at the level of detail desired, simulate it, and discover the effect of alternative assumptions and operating rules, has in many cases helped to create a common or shared understanding among these stakeholders . Getting stakeholders involved in developing and experimenting with their own interactive data-driven models has been an effective way of building a consensus—a shared vision.

1.5.5.5 Models for Shared Vision or Consensus Building

Participatory planning involves conflict management. Each stakeholder or interest group has its objectives, interests, and agendas. Some of these may be in conflict. The planning and management process is one of negotiation and compromise. This takes time but from it can come decisions that have the best chance of being considered the right decisions by most participants. Models can assist in this process of reaching a common understanding and agreement among different stakeholders. This has a greater chance of happening if the stakeholders themselves are involved in the modeling process.

Involving stakeholders in collaborative model building accomplishes a number of things. It gives them a feeling of ownership. They will have a much better understanding of just what their model can do and what it cannot do. If they are involved in model building, they will know the assumptions built into their model.

Being involved in a modeling exercise is a way to understand better the impacts of various assumptions one must make when developing and running models. While there may be no agreement on the best of various assumptions to make, stakeholders can learn which of those assumptions matter and which do not. In addition, the involvement of stakeholders in the process of model development will create discussions that will lead toward a better understanding of everyone’s interests and concerns. Though such model building exercises, it is just possible those involved will reach not only a better understanding of everyone’s concerns, but also a common or “shared” vision of at least how their system (as represented by their model, of course) works.

1.5.5.6 Models for Adaptive Management

Recent emphasis has shifted from structural engineering solutions to more nonstructural alternatives , especially for environmental and ecosystem restoration. Part of this shift reflects the desire to keep more options open for future generations. It reflects the desire to be adaptive to new information and to respond to surprises—impacts not forecasted. As we learn more about how river basins, estuaries, and coastal zones work, and how humans can better manage those resources, we do not want to regret what we have done in the past that may preclude this adaptation.

In some situations, it may be desirable to create a “rolling” plan—one based on the results of an optimization or simulation model of a particular water resource system that can be updated at any time. This permits responses to resource management and regulatory questions when they are asked, not just at times when new planning and management exercises take place. While this appears to be desirable, will planning and management organizations have the financing and support to maintain and update the modeling software used to estimate various impacts, collect and analyze new data, and maintain the expertise, all of which are necessary for continuous planning (rolling plans)?

1.6 Planning and Management Characteristics

1.6.1 integrated policies and development plans.

Clearly, a portion of any water resources planning and management study report should contain a discussion of the particular site-specific water resource management issues and options. Another part of the report might include a prioritized list of strategies for addressing existing problems and available development or management opportunities in the basin.

Recent emphasis has shifted from structural engineering solutions to more nonstructural alternatives , especially for environmental and ecosystem restoration. Part of this shift reflects the desire to keep more options open for future generations. It reflects the desire to be adaptive to new information and to respond to surprises—impacts not forecasted. As we learn more about how river basins, estuaries, and coastal zones work, and how humans can better manage their water resources, we do not want to be regretting what we have done in the past that may preclude this adaptation.

Consideration also needs to be given to improving the quality of the water resources planning and management review process and focusing on outcomes themselves rather than output measures. One of the outcomes should be an increased understanding of some of the relationships between various human activities and the hydrology and ecology of the basin, estuary, or coastal zone. Models developed for predicting the economic as well as ecologic interactions and impacts due to changes in land and water management and use could be used to address questions such as:

What are the hydrologic, ecologic, and economic consequences of clustering or dispersing human land uses such as urban and commercial developments and large residential areas? Similarly, what are the consequences of concentrated versus dispersed patterns of reserve lands, stream buffers, and forestland?

What are the costs and ecological benefits of a conservation strategy based on near-stream measures (e.g., riparian buffers) versus near-source (e.g., upland/site edge) measures? What is the relative cost of forgone upland development versus forgone valley or riparian development? Do costs strongly limit the use of stream buffer zones as mitigating for agriculture , residential, and urban developments?

Should large intensive developments be best located in upland or valley areas? Does the answer differ depending on economic, environmental, or aquatic ecosystem perspectives? From the same perspectives, is the most efficient and desirable landscape highly fragmented or highly zoned with centers of economic activity?

To what extent can riparian conservation and enhancement mitigate upland human land use effects? How do the costs of upland controls compare with the costs of riparian mitigation measures?

What are the economic and environmental quality trade-offs associated with different areas of different classes of land use such as commercial/urban, residential, agriculture , and forest?

Can adverse effects on hydrology, aquatic ecology, and water quality of urban areas be better mitigated with upstream or downstream management approaches ? Can land controls like stream buffers be used at reasonable cost within urban areas, and if so, how effective are they?

Is there a threshold size for residential/commercial areas that yield marked ecological effects?

What are the ecological states at the landscape scale that once attained become irreversible with reasonable mitigation measures? For example, once stream segments in an urban setting become highly altered by direct and indirect effects (e.g., channel bank protection and straightening and urban runoff), can they be restored with feasible changes in urban land use or mitigation measures?

Mitigating flood risk by minimizing floodplain developments coincides with conservation of aquatic life in streams. What are the economic costs of this type of risk avoidance?

What are the economic limitations and ecologic benefits of having light residential zones between waterways and commercial, urban, or agriculture lands?

What are the economic development decisions that are irreversible on the landscape? For example, once land is used for commercial development, it is normally too costly to return it to agricultural land. This would identify limits on planning and management for conservation and development.

What are the associated ecological and economic impacts of the trend in residential, commercial and forests lands replacing agricultural lands?

The answers to these and similar questions may well differ in different regions. However, if we can address them on a regional scale, i.e., in multiple river basins, we just might begin to understand and predict better the interactions among economy, environment ecology, and people as a function of how we manage and use its land and water. This in turn may help us better manage and use our land and water resources for the betterment of all—now and on into the future.

1.6.2 Sustainability

Sustainable water resource systems are those designed and managed to best serve people living in the future as well as those of us living today. The actions that we as a society take now to satisfy our own needs and desires should not only depend on what those actions will do for us but also on how they will affect our descendants. This consideration of the long-term impacts on future generations of actions taken now is the essence of sustainable development. While the word “sustainability ” can mean different things to different people, it always includes a consideration of the welfare of those living in the future. While the debate over a more precise definition of sustainability will continue, and questions over just what it is that should be sustained may remain unanswered, this should not delay progress toward achieving water resource systems that we judge best serves those of us living today as well as our children and their children living in the future.

The concept of environmental and ecological sustainability has largely resulted from a growing concern about the long-run health of our planet. There is increasing evidence that our present resource use and management activities and actions, even at local levels , can significantly affect the welfare of those living within much larger regions in the future. Water resource management problems at a river basin level are rarely purely technical and of interest only to those living within the individual river basins where those problems exist. They are increasingly related to broader societal structures, demands, and goals.

What would future generations like us to do for them? We do not know, but we can guess. As uncertain as these guesses will be, we should take them into account as we act to satisfy our own immediate needs, demands, and desires. There may be trade-offs between what we wish to do for ourselves in our current generation versus what we think future generations might wish us to do for them. These trade-offs , if any, between what present and future generations would like should be considered. Once identified, or at least estimated, just what decisions to make should be debated and decided in the political arena. There is no scientific theory to help us identify which trade-offs, if any, are optimal .

The inclusion of sustainability criteria along with the more common economic, environmental, ecological, and social criteria used to evaluate alternative water resources development and management strategies may identify a need to change how we commonly develop and use our water resources. We need to consider the impacts of change itself. Change over time is certain; just what it will be is uncertain. These changes will impact the physical, biological, and social dimensions of water resource systems. An essential aspect in the planning, design and management of sustainable systems is the anticipation of change. This includes change due to geomorphologic processes, to aging of infrastructure, to shifts in demands or desires of a changing society, and even due to increased variability of water supplies, possibly because of a changing climate. Change is an essential feature of sustainable water resources development and management.

Sustainable water resource systems are those designed and operated in ways that make them more adaptive, robust , and resilient to an uncertain and changing future. Sustainable water resource systems must be capable of effectively functioning under conditions of changing supplies, management objectives, and demands. Sustainable systems, like any others, may fail, but when they fail they must be capable of recovering and operating properly without undue costs.

In the face of certain changes, but with uncertain impacts, an evolving and adaptive strategy for water resources development, management, and use is a necessary condition of sustainable development. Conversely, inflexibility in the face of new information and new objectives and new social and political environments is an indication of reduced system sustainability. Adaptive management is a process of adjusting management actions and directions, as appropriate, in light of new information on the current and likely future condition of our total environment and on our progress toward meeting our goals and objectives. Water resources development and management decisions can be viewed as experiments, subject to modification—but with goals clearly in mind. Adaptive management recognizes the limitations of current knowledge and experience and that we learn by experimenting. It helps us move toward meeting our changing goals over time in the face of this incomplete knowledge and uncertainty. It accepts the fact that there is a continual need to review and revise management approaches because of the changing as well as uncertain nature of our socioeconomic and natural environments.

Changing the social and institutional components of water resource systems are often the most challenging because they involve changing the way individuals think and act. Any process involving change will require that we change our institutions—the rules under which we as a society function. Individuals are primarily responsible for, and adaptive to, changing political and social situations. Sustainability requires that public and private institutions also change over time in ways that are responsive to the needs of individuals and society.

Given the uncertainty of what future generations will want, and the economic, environmental, and ecological problems they will face, a guiding principle for the achievement of sustainable water resource systems is to provide options that allow future generations to alter such systems. One of the best ways to do this is to interfere as little as possible with the proper functioning of natural life cycles within river basins, estuaries, and coastal zones . Throughout the water resource system planning and management process, it is important to identify all the beneficial and adverse ecological, economic, environmental, and social effects—especially the long-term effects—associated with any proposed planning and management project.

1.7 Meeting the Planning and Management Challenges—A Summary

Planning (the formulation of development and management plans and policies) is an important and often indispensable means to support and improve operational management. Planning provides an opportunity to:

assess the current state of the water resources and the conflicts and priorities over their use, formulate visions, set goals and targets , and thus orient operational management,

provide a framework for organizing policy relevant research and public participation,

increase the legitimacy, public acceptance of, or even support for how the resources are to be allocated or controlled, especially in times of stress, and

facilitate the interaction, discussion, and coordination among managers and stakeholders, and generate a common point of reference—a management plan or policy.

Many of the concerns and issues being addressed by water resources planners and managers today are similar to those faced by planners and managers in the past. But some are different. Most of the new ones are the result of two trends: (1) a growing concern for the sustainability of natural ecosystems and (2) an increased recognition for the need of the bottom-up “grassroots” participatory approach to planning, managing, and decision-making.

Today planners work for economic development and prosperity as they did in the past, keeping in mind environmental impacts and goals as they have done in the past, but now recognizing ecological impacts and values as well. Water resources management may still be focused on controlling and mitigating the adverse impacts of floods and droughts and water pollution, on producing hydropower, on developing irrigation, on controlling erosion and sediment, and on promoting navigation , but only as these and similar activities are compatible with healthy ecosystems. Natural ecosystems generally benefit from the variability of natural hydrologic regimes. Other users prefer less variability. Much of our engineering infrastructure is operated so as to reduce hydrologic variability . Today water resource systems are increasing, required to provide rather than reduce hydrologic (and accompanying sediment load) variability. Reservoir operators, for example, can modify their water release policies to increase this variability. Farmers and land use developers must minimize rather than encourage land-disturbing activities. Floodplains may need to get wet occasionally. Rivers and streams may need to meander and fish species requiring habitats along the full length of rivers to complete their life cycles must have access to those habitats. Clearly these ecological objectives, added to all the other economic and environmental ones, can only compound the conflicts and issues with respect to land and water management and use.

So, how can we manage all this conflict and uncertainty? We know that water resources planning and management should be founded on sound science, efficient public program administration, and broad participation of stakeholders . Yet obtaining each of these three conditions is a difficult challenge. While the natural and social sciences can help us predict the economic, environmental, and ecological impacts of alternative decisions, those predictions are never certain. In addition, these sciences offer no help in determining the best decision to make in the face of multiple conflicting goals held by multiple stakeholders—goals that have changed, and no doubt will continue to change. Water resources planning and management and decision-making are not as easy as “we professionals can tell you what to do. All you need is the will to do it.” Very often it is not clear what should be done. Professionals administering the science, often from public agencies, nongovernmental organizations, or even from universities, are merely among all the stakeholders having an interest in and contributing to the management of water.

Each governmental agency, consulting firm, environmental interest group, and citizen typically has its own limitations, authorities, expertise and conflicts with other people, agencies and organizations, all tending to detract from achieving a fully integrated approach to water resources planning and management. But just because of this, the participation and contributions of all these stakeholders are needed. They must come together in a partnership if indeed an integrated approach to water resources planning and management is to be achieved and sustained. All views must be heard, considered, and acted upon by all involved in the water resources planning and management process.

Water resources planning and management is not simply the application and implementation of science. It is creating a social environment that gets all of us who should be involved, from the beginning, in a continuing planning process. This process is one of

educating ourselves about how our systems work and function,

identifying existing or potential options and opportunities for enhancement and resource development and use,

resolving the inevitable problems and conflicts that will result over who gets what and when and who pays who for what and when,

making and implementing decisions, and finally of

monitoring the impacts of those decisions.

This process is repeated as surprises or new opportunities or new knowledge dictates.

Successful water resources planning and management requires the active participation of all community institutions involved in economic development and resource management. How can this begin at the local stakeholder level? How does anyone get others interested in preventing problems before those problems are apparent, or especially before “unacceptable” solutions are offered to deal with them? And how do you deal with the inevitable group or groups of stakeholders who see it in their best interest not to participate in the planning process, but to just criticize it from the outside? Who is in a position at the local level to provide that leadership and needed financial support? In some regions, nongovernmental institutions have been instrumental in initiating and coordinating this process at local grassroot levels .

Water resources planning and management processes should identify a vision that guides development and operational activities in the affected region. Planning and management processes should

recognize and address the goals and expectations of the region’s stakeholders,

identify and respond to the region’s water-related problems,

function effectively within the region’s legal/institutional frameworks,

accommodate both short- and long-term issues,

generate a diverse menu of alternatives ,

integrate the biotic and abiotic parts of the basin,

take into account the allocation of water for all needs, including those of natural systems,

be stakeholder-driven,

take a global perspective,

be flexible and adaptable,

drive regulatory processes, not be driven by them,

be the basis for policy making,

foster coordination among planning partners and consistency among related plans,

be accommodating of multiple objectives,

be a synthesizer, recognize and deal with conflicts, and

produce recommendations that can be implemented.

All too often integrated planning processes are hampered by the separation of planning, management and implementing authorities, turf-protection attitudes, shortsighted focusing of efforts, lack of objectivity on the part of planners, and inadequate funding. These deficiencies need addressing if integrated holistic planning and management is to be more than just something to write about.

Effective water resources planning and management is a challenge today, and will be an increasing challenge into the foreseeable future. This book introduces some of the tools that are being used to meet these challenges. We consider it only a first step toward becoming an accomplished planner or manager.

ADB (Asia Development Bank). (2016). Asian Water Development Outlook, Strengthening Water Security in Asia and the Pacific . Mandaluyong City, Philippines.

Google Scholar  

ASCE (American Society of Civil Engineers). (1998). Sustainability criteria for water resource systems . Reston, VA: ASCE.

Gulbenkian Think Tank (GTT). (2014). Water and the future of humanity . Revaluating Water Security, Calouste Gulbenkian Foundation, New York: Springer. ISBN: 978-3-319-01456-2. doi: 10.1007/978-3-319-01457-9_1

GWP (Global Water Partnership). (2000). Integrated water resources management. TAC Background Papers No. 4. Stockholm, Sweden: GWP.

IPPC. (2007). Report of the intergovernmental panel on climate change , May.

NRC (National Research Council). (2001). Compensating for wetland losses under the clean water act . Committee on Mitigating Wetland Losses, Board on Environmental Studies and Toxicology, Water Science and Technology Board.

Orr, S., Pittock, J., Chapagain, A., & Dumaresq, D. (2012). Dams on the Mekong River: Lost fish protein and the implications for land and water resources, Global Environmental Change, 22 , 925–932.

UN-Water. (2013). UN-water analytical brief on water security and the global water agenda .

van Beek, E., & Arriens, W. L. (2014). Water security, putting the concept into practise . TEC Background Paper No. 20. Stockholm: GWP.

Winemiller, K. O., McIntyre, P. B. , Castello, L., Fluet-Chouinard, E., Giarrizzo, T., Nam, S., et al. (2016). Balancing hydropower and biodiversity in the Amazon, Congo, and Mekong Basin-scale planning is needed to minimize impacts in mega-diverse rivers. In Insights perspectives (Vol. 351 Issue 6269 p. 129). AAAS Science. sciencemag.org. January 8, 2016.

Additional References (Further Reading)

Abdullah, A., Masih, I.,Van Der Zaag, P., Karim, U. F.A., Popescu, I., Suhail, Q. A. (2015). Shatt al Arab River system under escalating pressure: A preliminary exploration of the issues and options for mitigation. International Journal of River Basin Management, 13 (2), 215–227.

Abu-Zeid, M. A., & Biswas, A. K. (Eds.). (1996). River basin planning and management . Calcutta: Oxford University Press.

American Society of Civil Engineers (ASCE). (1998). Sustainability criteria for water resource systems . Reston, VA: ASCE Press.

American Society of Civil Engineers (ASCE). (2011). Toward a sustainable water future: Visions for 2050 . Reston, VA, USA: ASCE Press.

Barrow, C. J. (1998). River basin development planning and management: A critical review. World-Development, Oxford, United Kingdom, 26 (1), 171–186.

Bateman, B., & Rancier, R. (Eds.). (2012). Case studies in integrated water resources management: From local stewardship to national vision . American Water Resources Association Policy Committee, 4 West Federal Street, P.O. Box 1626, Middleburg, Virginia 20118-1626, 60 pp.

Bates, B. C., Kundzewicz, Z. W., Wu, S., & Palutikof, J. P. (2008). Climate change and water . IPCC Technical Paper VI. Geneva, Switzerland: Intergovernmental Panel on Climate Change.

Biswas, A. K. (Ed.). (1997). Water resources: Environmental planning, management, and development (738 pp). New York, NY: McGraw-Hill.

Cai, X., Vogel, R., & Ranjithan, R. (Eds.). (2013). Role of systems analysis in watershed management. Journal of Water Resources Planning and Management, 139 (5), 461–592.

Chartres, C., & Varma, S. (2010). Out of water: From abundance to scarcity and how to solve the world’s water problems . Upper Saddle River, NJ, USA: Pearson Education Inc.

Cooper, A. B., & Bottcher, A. B. (1993). Basin-scale modeling as a tool for water-resource planning. Journal of Water Resources Planning and Management (ASCE), 119 (3), 306–323. May/June 6 fig, 4 tab, 41 ref.

Priscoli, J. D. (2004). What is public participation in water resources management and why is it important? Water International, 29 (2).

Diamantini, C., & Zanon, B. (1996). River basin planning in Italy: Resource and risk management. European-Environment (United Kingdom), 6 (4), 119–125.

Eckstein, O. (1958). Water resource development: The economics of project evaluation . Cambridge, MA: Harvard University Press.

Frederick, K. D., Major, D. C., & Stakhiv, E. Z. (1997). Water resources planning principles and evaluation criteria for climate change: Summary and conclusions. Climate Change, 37 (1), 291–313.

Article   Google Scholar  

Gershon, M., & Duckstein, L. (1983). Multiobjective approaches to river basin planning. Journal-Water-Resources-Planning-Management-Division, American Society of Civil Engineers USA), 109 (1), 13–28.

Gleick, P. H. (2002). Soft water paths. Nature, 418 , 373.

Gleick, P. H. (2003). Water use. Annual Review of Environment and Resources, 28 , 275–314.

Gleick, P. H., & Palaniappan, M. (2010). Peak water: Conceptual and practical limits to freshwater withdrawal and use. Proceedings of the National Academy of Sciences of the United States of America, 107 (25), 11155–11162.

Global Water Partnership (GWP). (2000). Water as a social and economic good: How to put the principle into practice . TAC Background Papers No. 2. Stockholm, Sweden: GWP.

Global Water Partnership (GWP). (2000). Effective water governance . TAC Background Papers No. 7. Stockholm, Sweden: GWP.

Global Water Partnership (GWP). (2012). The handbook for integrated water resources management in transboundary basins of rivers, lakes and aquifers (120 pp). International Office for Water (Permanent Technical Secretariat of the International Network of Basin Organizations). ISBN: 978-91-85321-85-8.

Goulter, I. C. (1985). Equity issues in the implementation of river basin planning. Strategies for river basin management: Environmental integration of land and water in a river basin (pp. 287–292, 15 refs.). Dordrecht, Holland: D. Reidel Publishing Co.

Gulbenkian Think Tank. (2014). Water and the future of humanity. Revisiting water security (241 pp). New York: Springer. doi: 10.1007/978-3-319-01457-9

Haasnoot, M., Kwakkel, J. H., Walker, W. E., & ter Maat, J. (2013). Dynamic adaptive policy pathways: A method for crafting robust decisions for a deeply uncertain world. Global Environmental Change, 23 , 485–498.

Habersack, H., Haspel, D., & Campbell, I. (Eds.). (2013). Integrated management of large river systems. International Journal of River Basin Management, 11 (2), 137–236.

Hoekstra, A. Y., & Chapagain, A. K. (2008). Globalization of water. Sharing the planet’s freshwater resources . Oxford, UK: Blackwell Publishing.

Hoekstra, A. Y., & Mekonnem, M. M. (2012). The water footprint of humanity. Proceedings of the National Academy of Sciences, Washington DC, 109 (9), 3232–3237.

Howe, C. W. (1996). Water resources planning in a federation of states: Equity versus efficiency. Natural Resources Journal, 36 (1), 29–36.

Huaicheng, Guo, & Beanlands, G. (1994). A comparative study on Canadian and Chinese river basin planning. Journal of Environmental Science China, 6 (2), 224–233.

IPCC (Intergovernmental Panel on Climate Change). (2001). Climate change 2001: Synthesis report, summary for policymakers. Third Assessment Report, IPCC.

IPCC (Intergovernmental Panel on Climate Change). (2007). Climate change 2007: The physical science basis. Fourth Assessment Report, IPCC.

IWMI (International Water Management Institute). (2007). Water for food, water for life. A comprehensive assessment of water management in agriculture . London, UK: Earthscan, and Colombo, Sri Lanka: IWMI.

Karamouz, M., Szidarovszky, F., & Banafsheh, Z. (2003). Water resources systems analysis . Boca Raton, FL: Lewis.

Kulshreshtha, S. (1998). A global outlook for water resources to the year 2025. Water Resources Management, 12 (3), 167–184.

Krutilla, J. V., & Eckstein, O. (1958). Multiple purpose river development . Baltimore, MD: Johns Hopkins Press.

Lee, D. J., & Dinar, A. (1996). Integrated models of river basin planning, development, and management. Water International, 21 (4), 213–222. Also see: (1995). Review of integrated approaches to river basin planning, development and management . World Bank, Agriculture and Natural Resources Department, Washington, DC.

Lins, H. F., Wolock, D. M., & McCabe, G. J. (1997). Scale and modeling issues in water resources planning. Climate Change, 37 (1), 63–88.

Loucks, D. P., Stedinger, J.R., & Haith, D.A. (1981). Water resources systems planning and analysis (559 pp). Englewood Cliffs, NJ: Prentice-Hall.

Loucks, D. P., & da Costa, J. R. (Eds.). (1991). Decision support systems: Water resources planning and research . Berlin: Springer.

Loucks, D. P. (Ed.). (1998). Restoration of degraded rivers: Challenges, issues and experiences (484 pp). Dordrecht, NL: Kluwer Academic Publishers.

Maidment, D. R. (Ed.). (1993). Handbook of hydrology . New York, NY: McGraw-Hill.

Maass, A., et al. (1962). Design of water resource systems . Cambridge, MA: Harvard University Press.

Book   Google Scholar  

Major, D. C., & Lenton, R. L. (Eds.). (1979). Applied water resource systems planning (248 pp). Englewood Cliffs, NJ: Prentice-Hall, Inc.

Mays, L. W. (Ed.). (1996). Water Resources Handbook . NY, NY: McGraw-Hill.

McMillan, T. (1990). Water resource planning in Canada. Journal of Soil and Water Conservation, 45 (6),614–616.

Mimikou, M. A., Baltas, E. A., & Tsihrintzis, V. A. (2016). Hydrology and water resource systems analysis (456 pp). CRC Press.

Mitchell, B. (1983). Comprehensive river basin planning in Canada: Problems and opportunities. Water International, 8 (4), 146–153.

MRC (Mekong River Commission) Secretariat. (2009). Inception report: MRC SEA for hydropower on the Mekong mainstream . Phnom Penh, Cambodia: MRC and International Center for Environmental Management.

National Research Council (NRC). (2001). Compensating for Wetland Losses Under the Clean Water Act (348 pp). Committee on Mitigating Wetland Losses, Board on Environmental Studies and Toxicology, Water Science and Technology Board.

Nijhuis, M. (2015). Harnessing the Mekong, or killing it? National Geographic, Journal of National Geographic Society, 227 (5), 102–129.

O’Riordan, J. (1981). New strategies for water resource planning in British Columbia. Canadian Water Resources Journal, 6 (4), 13–43. 6 Figs, 5 Tabs.

Razavian, D.,Bleed, A. S., Supalla, R. J., & Gollehon, N. R. (1990). Multistage screening process for river basin planning. Journal of Water Resources Planning and Management (ASCE), 116 (3), 323–334. May/June 3 fig, 1 tab, 19 refs, 3 append.

Reitsma, R. F., & Carron, J. C. (1997). Object-oriented simulation and evaluation of river basin operations. Journal of Geographic Information and Decision Analysis, 1 (1), 9–24.

Reynolds, P. J. (1985). Ecosystem approaches to river basin planning strategies for river basin management: Environmental integration of land and water in a river basin (pp. 41–48, 1 fig, 18 refs). Dordrecht, Holland: D. Reidel Publishing Co.

Sadoff, C. W., Hall, J. W., Grey, D., Aerts, J. C. J. H., Ait-Kadi, M., Brown, C., et al. (2015). Securing water, sustaining growth: Report of the GWP/OECD task force on water security and sustainable growth (180 pp). UK: University of Oxford.

Saha, S. K., & Barrow, C. J. (Eds.). (1981). River basin planning: Theory and practice (357 pp). Chichester, UK: Wiley Interscience.

Savenije, H. H. G., & van der Zaag, P. (Eds.). (1998). The management of shared river basins (164 pp). The Hague, NL: Ministry of Foreign Affairs, Neda.

Schramm, G. (1980). Integrated river basin planning in a holistic universe. Natural Resources Journal, 20 (4), 787–806. 2 Fig, 1 tab, 48 refs.

Smith, S. C., & Castle, E. N. (Eds.). (1964). Economics and public policy in water resources development . Ames, Iowa: Iowa University Press.

Somlyody, L. (1997). Use of optimization models in river basin water quality planning. In M. B. Beck & P. Lessard (Eds.), WATERMATEX ‘97. Systems analysis and computing in water quality management. Towards a new agenda (391 pp).

Stout, G.E. (1998). Sustainable development requires the full cooperation of water users. Water International, 23 (1), 3–7.

Thanh, N. C., & Biswas, A. K. (Eds.). (1990). Environmentally-sound water management (276 pp). Delhi: Oxford University Press.

Thiessen, E. M., Loucks, D. P., & Stedinger, J. R. (1998). Computer-assisted negotiations of water resources conflicts. Group Decision and Negotiation, 7 (2).

Thissen, W. A. H., & Walker, W. E. (Eds.). (2013). Public policy analysis: New developments (286 pp). New York, Heidelberg, Dordrecht, London: Springer. ISBN: 978-1-4614-4601-9; ISBN: 978-1-4614-4602-6 (eBook). doi: 10.1007/978-1-4614-4602-6

Tolley, G. S., & Riggs, F. E. (Eds.). (1961). Economics of watershed planning . Ames, Iowa: Iowa State University Press.

UN WWAP (United Nations World Water Assessment Programme). (2009). The United Nations World Water Development Report 3: Water in a changing world . Paris, France: UNESCO and London, UK: Earthscan.

UN WWAP (United Nations World Water Assessment Programme). (2011). World water scenarios to 2050, exploring alternative futures of the world’s water and its use to 2050 . Paris, France: UNESCO.

UN WWAP (United Nations World Water Assessment Programme). (2012). The United Nations World Water Development Report 4: Managing water under risk and uncertainty . Paris, France: UNESCO.

UNDP (United Nations Development Programme). (2011). Human Development Report. In Sustainability and equity: A better future for all . New York, NY, USA: UNDP.

UNEP (United Nations Environment Programme). (2002). Global environmental outlook 3: Past, present and future perspectives . London, UK: Earthscan and Nairobi, Kenya: UNEP.

UNEP (United Nations Environment Programme). (2006). Marine and coastal ecosystems and human well-being: A synthesis report based on the findings of the millennium ecosystem assessment . Nairobi, Kenya: UNEP.

UNEP (United Nations Environment Programme). (2009). Towards sustainable production and sustainable use of resources: Assessing biofuels . France: UNEP, produced by the International Panel for Sustainable Resource Management, Division of Technology Industry and Economics, France.

Viessman, W. (1996). Integrated water management. Water Resources Update, (106), 2–12).

Viessman, W. (1998). Water policies for the future. Water Resources Update, (111), 4–7, 104–110.

Vörösmarty, C. J., Green, P., Salisbury, J., & Lammers, R. B. (2000). Global water resources: Vulnerability from climate change and population growth. Science, 289 (5477), 284–288.

Vörösmarty, C. J., McIntyre, P. B., Gessner, M. O., Dudgeon, D., Prusevich, A., Green, P., et al. (2010). Global threats to human water security and river biodiversity. Nature, 467 , 555–561.

Walker, W. E., Haasnoot, M., & Kwakkel, J. H. (2013). Adapt or perish: A review of planning approaches for adaptation under deep uncertainty. Sustainability, 5 , 955–979.

Watkins, D. W. Jr. (Ed.). (2013). Water resources systems analysis through case studies: Data and models for decision making (168 pp). Reston, VA: ASCE Press.

WCD. (2000). Dams and developments — A new framework for decision-making : The report of the World Commission on Dams . UK: Earthscan.

White, G. F. et al. (1999). Water for the future: The West Bank and Gaza Strip, Israel, and Jordan . Water Science and Technology Board and the Board on Environmental Studies and Toxicology, National Research Council, National Academy Press, Washington, DC.

Wong, E. (2013). Pollution rising, Chinese fear for soil and food. NY Times . December 31, 2013.

Wood, A. W., Lettenmaier, D. P., & Palmer, R. N. (1997). Assessing climate change implications for water resources planning. Climate Change, 37 (1), 203–228.

Wright, W. C., Cohen, R., & Heath, J. H. (1982). Decentralizing water resource planning and management. Journal of the American Water Works Association, 74 (7), 6, 334–345. July, 5 Fig, 2 Tab, 37 Ref.

WWAP, (United Nations World Water Assessment Programme). (2012). World water development report 4, 2012. Managing   water under uncertainty and   risk (867 pp). Paris: UNESCO.

WWAP (United Nations World Water Assessment Programme). (2015). World water development report 2015. Water for a sustainable world (224 pp; Case studies, 61 pp). Paris: UNESCO.

WWAP (United Nations World Water Assessment Programme). (2014). The United Nations world water development report 2014: Water and energy (133 pp). Paris: UNESCO.

Xie, J., Liebenthal, A., Warford, J. J., et al. (2009). Addressing China’s water scarcity: Recommendations for selected water resource management issues . Washington, DC, USA: World Bank.

Zhang, R., Zhou, J., Zhang, H., Liao, X., & Wang, X. (2014). Optimal operation of large-scale cascaded hydropower systems in the Upper Reaches of the Yangtze River, China. Journal of Water Resources Planning and Management, 140 (4), 480–495.

Download references

Author information

Authors and affiliations.

Cornell University, Ithaca, NY, USA

Daniel P. Loucks

Deltares, Delft, The Netherlands

Eelco van Beek

You can also search for this author in PubMed   Google Scholar

Corresponding authors

Correspondence to Daniel P. Loucks or Eelco van Beek .

How would you define “Integrated Water Resources Management” and what distinguishes it from “Sustainable Water Resources Management”?

Can you identify some common water management issues that are found in many parts of the world?

Comment on the common practice of governments giving aid to those in drought or flood areas without any incentives to alter land use management practices in anticipation of the next drought or flood.

What tools and information are available for developing integrated water resources plans and management policies?

What structural and nonstructural measures can be taken to address water resources issues?

Find the following statistics:

Percent of all freshwater resources worldwide available for drinking;

Number of people who die each year from diseases associated with unsafe drinking water;

Percent of total freshwater resources in polar regions;

Per capita annual withdrawal of cubic meters of freshwater in various countries;

Average world per capita annual withdrawal of cubic meters of freshwater;

Tons of pollutants entering lakes and rivers daily in various regions;

Average number of gallons of water consumed by humans in a lifetime;

Average number of kilometers per day a woman in a developing country must walk to fetch fresh water.

Identify and briefly describe the six greatest rivers in the world.

Identify some of the major water resource management issues in the region where you live. What management alternatives might effectively reduce some of the problems or provide additional economic, environmental, or social benefits.

Describe some water resource systems consisting of various interdependent natural, physical, and social components. What are the inputs to the systems and what are their outputs? How did you decide what to include in the system and what not to include?

Sustainability is a concept applied to renewable resource management. In your words define what that means and how it can be used in a changing and uncertain environment both with respect to water supplies and demands. Over what space and timescales is it applicable, and how can one decide whether or not some plan or management policy will be sustainable? How does this concept relate to the adaptive management concept?

Identify and discuss briefly some of the major issues and challenges facing water managers today.

Rights and permissions

Open Access    This chapter is distributed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License ( http://creativecommons.org/licenses/by-nc/4.0/ ), which permits any noncommercial use, duplication, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

The images or other third party material in this chapter are included in the work's Creative Commons license, unless indicated otherwise in the credit line; if such material is not included in the work’s Creative Commons license and the respective action is not permitted by statutory regulation, users will need to obtain permission from the license holder to duplicate, adapt or reproduce the material.

Reprints and permissions

Copyright information

© 2017 The Author(s)

About this chapter

Loucks, D.P., van Beek, E. (2017). Water Resources Planning and Management: An Overview. In: Water Resource Systems Planning and Management. Springer, Cham. https://doi.org/10.1007/978-3-319-44234-1_1

Download citation

DOI : https://doi.org/10.1007/978-3-319-44234-1_1

Published : 04 March 2017

Publisher Name : Springer, Cham

Print ISBN : 978-3-319-44232-7

Online ISBN : 978-3-319-44234-1

eBook Packages : Engineering Engineering (R0)

Share this chapter

Anyone you share the following link with will be able to read this content:

Sorry, a shareable link is not currently available for this article.

Provided by the Springer Nature SharedIt content-sharing initiative

  • Publish with us

Policies and ethics

  • Find a journal
  • Track your research

U.S. flag

An official website of the United States government

The .gov means it’s official. Federal government websites often end in .gov or .mil. Before sharing sensitive information, make sure you’re on a federal government site.

The site is secure. The https:// ensures that you are connecting to the official website and that any information you provide is encrypted and transmitted securely.

  • Publications
  • Account settings

Preview improvements coming to the PMC website in October 2024. Learn More or Try it out now .

  • Advanced Search
  • Journal List
  • HHS Author Manuscripts

Logo of hhspa

Awareness, adoption and implementation of the water safety plan methodology: insights from five Latin American and Caribbean experiences

Brian hubbard.

Department of Health and Human Services, Environmental Health Services Branch, National Center for Environmental Health, United States Centers for Disease Control and Prevention, 4770 Buford Highway, NE, MS F-60, Atlanta, GA 30341, USA

Richard Gelting

Maria del carmen portillo.

Past Regional Coordinator, International Water Association, Latin American and Caribbean Office, Lima, Peru

Tom Williams

International Water Association, Den Haag Office, Koningin Julianaplein 2–7th floor, 2595 AA The Hague, The Netherlands

Ricardo Torres

Pan American Health Organization, Calle Victor Sanjinez No. 2678, Edificio Torre Barcelona Pisos 1, 6 and 7, Zona Sopocachi, La Paz, Bolivia

Considerable effort has been made worldwide to disseminate information and provide technical assistance to encourage the adoption and implementation of the water safety plan (WSP) methodology. Described since the third edition of the World Health Organization (WHO) Guidelines for Drinking-water Quality, a WSP provides guidance for water utilities to ensure the delivery of safe drinking water and protect health. Attention is now being given to understand the success of efforts to advance adoption of the WSP methodology in the Latin America and Caribbean (LAC) region. More specifically, there is interest in knowing how early adopters developed strategies to implement the WSP methodology and what challenges exist for further implementation. To better understand adoption and implementation trends, key informants from five LAC countries were interviewed and case studies were developed to reveal the diversity of WSP approaches applied in the region. Results indicate that WSP implementation is more widespread than previously reported. Respondents affirmed that the WHO Guidelines for Drinking-water Quality are routinely used as a model for country-level drinking-water regulations, which has led to uptake of the WSP methodology. Interview respondents also revealed innovative national strategic approaches for WSP implementation.

INTRODUCTION

The water safety plan (WSP) methodology is one of the most effective ways to systematically guarantee the safety of drinking water ( WHO 2004 ). The methodology recommends a preventive risk management approach that incorporates system assessment, operational monitoring, and the development of improved management plans. It guides water utilities and partners to focus on all stages of the water supply system – from catchment to the point of use by consumers – instead of only on the operations and infrastructure under the control of the utility company.

The objectives of the WSP methodology are to protect source waters (i.e. watersheds and aquifers); optimize operations to improve the disinfection process; and prevent recontamination during storage, distribution and household management. The WSP approach is based on principles and concepts applied in other risk management systems such as the Hazard Analysis and Critical Control Points (HACCP) methodology ( Havelaar 1994 ; Gunnarsdottir & Gissurarson 2008 ; Jayaratne 2008 ) applied in the food industry, and the Bonn Charter promoted by the International Water Association (IWA) (2009) .

Significant effort has been made globally to promote awareness and encourage adoption of the WSP approach. There is also growing interest to evaluate the variety of potential impacts – increased institutional collaboration, strengthened operational and management capacity, improved level of client satisfaction, cost recovery and better health – that may result from implementation efforts (see, e.g., Gelting et al . 2012 ). In 2007, a survey conducted by the IWA ( Zimmer & Hinkfuss 2007 ) sought to understand the global progress toward WSP adoption and to identify implementation challenges. Results of the survey revealed low rates of adoption and ineffective implementation at the global level. The authors offered a range of explanations for the poor acceptance of WSPs at that time. Notable among the results was the fact that most survey respondents were from developed countries (i.e. North America and Europe) and there was a poor response from the Latin American and Caribbean (LAC) region (e.g. there was only one respondent from South America). Since the 2007 Zimmer and Hinkfuss survey, significant work related to the awareness, implementation and adoption of the WSP methodology has continued to be accomplished in the LAC region. The Centers for Disease Control and Prevention (CDC), Pan American Health Organization (PAHO) and Environmental Protection Agency (EPA) collaborated to support demonstration projects first in Jamaica, and later in Guyana and Brazil ( Rinehold et al . 2011 ). Other organizations (i.e. Inter-American Association of Sanitary and Environmental Engineering [AIDIS] and IWA) supported country and regional implementation efforts, and provided technical assistance and funding. PAHO, with support from AIDIS and CDC, has conducted regional training events throughout the LAC region. This paper presents the results of those efforts by examining the experiences of five Latin American countries during WSP implementation, and also summarizes the lessons, recommendations and next steps to expand use of the WSP methodology in the region.

To better understand WSP adoption and implementation trends in the LAC region, we gathered information about the WSP/LAC Network – whose goal is to promote the improvement of drinking-water supply systems in the region through the implementation and accelerated development of the WSPs – as well as about WSP implementation in specific countries in the region. We reviewed WSP/LAC Network documents and incorporated historical observations from the network’s interactions with country-level WSP activities. We also interviewed key informants from five LAC countries – Jamaica, Brazil, Honduras, Peru and Costa Rica – to reveal the diversity of approaches being applied during WSP implementation in the region. Key informants were chosen based on their

  • proven leadership in promoting preventive risk management approaches in their respective countries,
  • participation in WSP/LAC Network events, and
  • willingness to participate in unstructured interviews.

Key informant interviews were conducted with representatives from universities, national water and sanitation utilities, national water agencies and national water committees. The key informant interviews were conducted individually and focused on the following topics:

  • How respondents and their agencies were exposed to information about the WSP methodology and the WSP/LAC Network.

Implementation and Adoption Strategies:

  • Whether the WSP methodology had been adopted (and if so, what were the strategies to include the methodology in drinking-water regulations and implementation).
  • What difficulties and barriers were encountered in adoption and implementation of the WSP methodology.

Lessons learned, recommendations and next steps:

  • What are the important lessons, recommendations, and next steps for the WSP/LAC Network and others to encourage dissemination, adoption, and implementation.

RESULTS: FINDINGS FROM THE WSP/LAC CASE STUDIES

Many countries in the LAC region first became aware of the WSP methodology from the World Health Organization’s (WHO’s) Drinking-water Guidelines, which water regulators in countries such as Jamaica, Brazil, Honduras and Costa Rica were already using to update their own national water regulations. Once aware of the preventive risk management approach outlined in the WHO Guidelines , these countries began incorporating the approach into their own national drinking-water policies. In some cases – such as Brazil – the WSP process was identified as a practical way to apply these preventive concepts. Another country – Peru – officially mandated the preventive risk management approach in their national guidelines but did not explicitly require use of WSPs.

The CDC/EPA/PAHO partnership was an early source of information and support for the WSP methodology, and exposed various LAC countries to the WSP process. In the case of Jamaica, representatives from the Ministry of Health and the Jamaican National Water Commission attended a WSP workshop in Buenos Aires, Argentina, in 2005, in which the CDC, EPA and PAHO introduced the WSP methodology to potential pilot project participants from ten countries in the LAC region. Resulting from the workshop, Spanish Town, Jamaica, was selected as the initial WSP pilot project for the LAC region.

Another example of a country’s increased exposure to the WSP methodology occurred in Peru, where advocacy efforts by the WSP/LAC network led to the signing of a one-year agreement in 2009 with the General Environmental Health Directorate of Peru (Spanish acronym: DIGESA) to allow the network to conduct activities from DIGESA offices in Lima, Peru. Peruvian officials received a great deal of information from the WSP/LAC network during this time, which later informed their revision of the national drinking-water regulations. Moreover, advocacy efforts by the WSP/LAC Network in their DIGESA headquarters led to the signing of an agreement with the United Nations Human Settlements Programme (UN HABITAT) and initiated a partnership with the Inter-American Association of Waterworks Sector Regulators (Spanish acronym: ADERASA) to disseminate information about the WSP methodology.

Implementation and adoption strategies

For some countries, implementing the WSP methodology did not require a complete overhaul of existing activities, but only an integration of new concepts from the WHO guidelines and an adjustment to the country’s context. For example, when Jamaica initiated the WSP pilot project in Spanish Town in July 2006 with training and technical assistance from CDC, EPA and PAHO, it became clear that fundamental elements of the WSP process were already being used by Jamaican practitioners. A similar case was found in Costa Rica, where authorities simultaneously promoted WSP implementation and worked on changing national policy related to drinking water. In May 2009, the Costa Rican Ministry of Health enacted a resolution that encouraged implementation of the WSP methodology at the national level. This resolution was carried out by integrating the WSP methodology into the Costa Rican Sanitary Quality Reward Program, an existing country-wide initiative that already included many fundamental aspects of preventive risk management. Because such an established program already existed, adoption of preventive practices had already occurred in water utilities throughout Costa Rica, and integrating improvements recommended in the WSP approach was less difficult than if such practices were not widespread. By 2010, the methodology was gaining steady acceptance – a total of five sites had started implementation – and was being considered by a growing number of Costa Rican organizations with a role in the water sector.

Another common factor among several LAC countries implementing WSPs is the level of increased institutional collaboration. Multiple partners at the international, national and municipal levels carried out the Spanish Town, Jamaica, WSP pilot. Like Jamaica, Brazil carried out its WSP pilot project in the city of Viçosa with local partners and financial support and technical assistance from the CDC/EPA/PAHO partnership. The Viçosa site is actually two WSPs: one conducted for the water system of the Federal University of Viçosa and one for the municipal water system in the city of Viçosa. The Viçosa WSP efforts have been iterative and continue to be an educational environment for university engineering students to learn and work alongside engineers at the municipal water utility. In addition, the Viçosa water utility is a member and leader of a regional association of about 15 water utilities. Benefits and best practices emerging from the Viçosa experiences are expected to inform subsequent WSP implementation within that association.

While WSPs have, in some cases, been formally promoted at the national policy level, the WSP methodology has been carried out in less formalized ways as well. As of 2010, the WSP methodology had not been integrated into the Honduran national legislation, but the WSP was still widely encouraged in practice. Implementers in Honduras used a decentralized approach to conduct WSPs and, as of 2010, 25 WSPs had been completed nationally. In Peru, regulators did not formally endorse WSPs as an exclusive method for water-quality protection, but still incorporated the WSP principles and practices into the national drinking-water regulations. These new policies designated the Peruvian agencies that were responsible for managing water supply systems (this corresponds directly to Module 1: Assembling a WSP Team, in the WSP Manual) and detailed how those agencies should collaborate when responding to incidents and deficiencies in the water-supply system; the regional Ministry of Health agencies were designated as the lead ( DIGESA 2011 ). Before full approval of the new drinking-water regulations, a plan was implemented to provide training on these principles and practices, and WSP manuals were disseminated to 35 areas throughout the country in anticipation of the new policies. In this way, Peru formally adopted the principles reflected in the WSP methodology, and informally promoted WSPs as an optional method for implementation.

Several countries in the LAC region encountered challenges and barriers while carrying out WSPs. Facilitators in Jamaica and Honduras reported that solutions required institutional collaboration because sometimes the lead institution in the WSP process did not have the regulatory mandate to address identified issues. For example, the Jamaican National Environment and Planning Agency (NEPA) only has authority to regulate point source pollution. However, non-point source pollution affecting the watershed (e.g. agricultural practices and erosion, pesticide use and location of informal settlements) is complicated by land tenure issues and the fact that NEPA has no regulatory authority in these matters. The Spanish Town WSP process led to better collaboration between partners to address non-point sources of pollution by addressing the land tenure issues. The local municipality of Spanish Town, the Social Development Commission (a government agency within the Office of the Prime Minister that works with informal settlements) and NEPA worked together to reduce contamination of water entering the intake to the Spanish Town treatment plant.

In the case of Honduras, efforts by the National Autonomous Water and Sewerage Service (Spanish acronym: SANAA) to formally integrate the WSP methodology into the national drinking-water legislation were hampered by limited epidemiological support and lack of evidence base to define health impact. Sweeping political changes filtering down through the health sector made it difficult to incorporate and maintain the epidemiological expertise for WSP activities throughout the country. Representatives of SANAA had hoped they could produce the required health impact evidence for legislative documentation – a necessary step for adoption of new water policy – by October 2010, but without epidemiological personnel to work on the health impact, the documentation was not completed.

In other settings, namely Brazil, Costa Rica and Honduras, facilitators felt that existing guidance documents for WSP implementation contained language that was often unclear for water utility staff and consequently led to an incomplete understanding of WSP principles. In Brazil, for example, those involved in the Viçosa WSPs found the language in the WHO Guidelines for Drinking-water Quality to be overly theoretical and without practical advice for utilities unfamiliar with the preventive risk management approach. Brazilian water utilities accustomed to relying only on verification of finished (e.g. treated) water were not familiar with the ways in which operational monitoring could minimize risk and provide additional barriers against contamination. Implementers in Costa Rica, like in Brazil, encountered a similar challenge in the language used in the WHO Guidelines . The National Water Laboratory (Spanish Acronym: LNA), a strong proponent of the WSP methodology, reported that water utilities lacked an understanding of the important role laboratories play in improved operational monitoring (e.g. measuring turbidity, pH and other water quality parameters to assure proper treatment) and this was a barrier to WSP implementation. The failure to consistently measure water quality throughout the water supply system and rely solely on verification of treated water weakened the preventive risk approach encouraged in the WSP methodology. In Honduras implementers felt that the language of WSP resources applied only to large-scale municipal systems. This resource gap was addressed when the Water and Sanitation Network of Honduras, in partnership with SANAA, developed the Guide for the Implementation of Water Safety Plans in the Rural Sector of Honduras ( RASHON 2009 ). This document offers an important model for WSP implementation in rural and poor areas where community members (i.e. local water and sanitation committees) are responsible for managing small water supply systems.

Lessons learned, recommendations and next steps

For the five case study countries in the LAC region, the lessons learned, recommendations and anticipated next steps are nuanced because each country’s experience with WSP implementation was unique. In Jamaica, implementers found that the Spanish Town WSP process led to better collaboration between partners at the national and municipal levels to address non-point sources of pollution and to reduce contamination at the treatment plant water intake. A broader outcome of increased collaboration during the Spanish Town experience has been a proposal to develop a framework for land use. Jamaican representatives recommended that future WSP facilitators take advantage of these non-traditional collaborations to address contamination in watersheds. Despite the outcomes in Spanish Town, by 2010, some WSP team members mentioned that maintaining stakeholder participation was difficult and that disinterest had led to the dissolution of the WSP team ( IWA 2010 ).

The Brazilian experience of adopting a preventive risk management approach and implementing the WSP methodology has resulted in important lessons and legislative changes. In the broader context of the WSP/LAC Network, it was suggested that strengthening linkages between Brazilian utilities in the region through IWA’s Water Operators Partnership program would result in positive impacts. Specific ideas for interchange and linkages included sharing documentation procedures and encouraging visits between national utilities that have successfully implemented WSPs (e.g. Jamaica, Malaysia and Portugal).

Water utilities in Brazil have traditionally followed the lead of the Ministry of Health when implementing new drinking-water guidelines. Utilities interested in carrying out WSPs have expressed the need for one single guideline to ensure there is uniformity during implementation. Expectations were high in Brazilian water utility associations that the Ministry of Health would incorporate best practices from pilot project results into new directives that would describe a national approach for WSP implementation. In fact, on December 12, 2011, the WSP methodology was accepted into national legislation defined by ordinance N° 2914, and many of the recommendations and efforts of pilots and workgroups were instrumental in helping to define this legislative objective.

In Honduras, where new WSP policies have not yet been adopted, best practices are needed to help WSP teams overcome unintended political barriers (e.g. extensive administrative changes following elections) that obstruct WSP implementation. An important role for the WSP/LAC Network, according to Honduran representatives, is to continue advocacy efforts and to disseminate resources and model best practices. Honduran representatives from SANAA mentioned that case studies from Colombia and Costa Rica, shared during WSP/LAC Network sponsored events, revealed useful insights from WSP implementation in those country settings. WSP implementation experiences from Costa Rica addressing the intangible (e.g. administrative) risks were particularly useful for Honduran representatives. Additionally, Honduran implementers from SANAA find great merit in the innovative strategy Costa Rica used to incorporate the WSP methodology into the Sanitary Quality Reward Program.

In Peru, there is general recognition that the WSP manual is the appropriate tool to guide water utility operators to comply with the new Peruvian drinking-water regulations. Peruvian authorities believe that continued technical assistance from members of the WSP/LAC Network will help to disseminate the WSP methodology (i.e. by sharing WSP manuals and other resources) and organize training sessions for the regionally decentralized Ministry of Health agencies – known as DIRESAs in Peru. Additionally, greater collaboration between the health and housing sectors (i.e. the Ministry of Housing, Construction and Sanitation) could serve to improve application of the WSP methodology for newly constructed water supply systems.

In addition to lessons learned from individual countries, there are also some key themes shared by several countries, particularly in regards to recommended future actions for the WSP/LAC network and other WSP proponents. For example, in Brazil and Costa Rica, implementers felt that guidance documents – in particular the WHO Drinking-water Guidelines – used language that was too theoretical, while Costa Rican and Honduran representatives believed the WSP materials referred only to the context of large-scale water utilities without being relevant for smaller supply systems (e.g. rural small water supply systems and household water treatment systems). To address this need for clearer and more relevant guidance, several key informants specifically mentioned having expectations that the subsequent version of the WHO Drinking-water Guidelines would be less theoretical, offer more practical guidance for WSP implementation and build on worldwide WSP implementation experiences.

WSP experiences in the LAC region are not limited to the five countries presented in this paper as case studies. Additional implementation activities have taken place in Argentina, Bolivia, Colombia, Guyana, St Lucia, Uruguay and along the Peru-Ecuador border. In Cali, Colombia, a WSP experience being led by Valle University and the Cali water utility will provide a model for other interested municipalities – Manizales and Zipaquira – in the country. In Mexico, the National Water Commission has indicated that the WSP serves as the applicable methodology for utility companies and is highlighted in the operational regulations of the National Clean Water Program. Starting in 2011, the WSP methodology was being promoted with greater intensity at the national level in Mexico, and state and municipal authorities are now able to apply for federal subsidies to develop WSP training programs.

An important factor affecting WSP implementation in some of the LAC countries has been the substantial support in resources from the Spanish Cooperation Fund for water and sanitation to meet the Millennium Development Goals. The fund is managed by the Inter-American Development Bank and disseminated through United Nations Development Programme efforts to strengthen public institutions in the water and sanitation sector. Particular emphasis has been placed on improving drinking-water quality, and the WSP has increasingly become recognized as the tool of choice to achieve water quality assurance in public water supply systems. Honduras, one of the five case studies presented here, is an example of WSP implementation that received resources from the Spanish Cooperation Fund. Other countries working to strengthen water quality programs with support from this fund include Paraguay, Mexico and Panama.

Information gathered from participant dialogue in LAC WSP trainings and during key informant interviews indicates that most agencies (e.g. public health authorities and water utilities) considering implementation already understand the potential benefits of a WSP. However, many entities remain divided on the most effective way to initiate the WSP process and how to integrate the water sector stakeholders as recommended in Module I (i.e. assemble a WSP team) of the WSP Manual. Without fail these questions always arise: ‘Who should lead the WSP technical team?’ and ‘How should the WSP technical team approach implementation?’ Anecdotal experience from the field and gathered during these five key informant interviews shows that advances in WSP implementation have been most effective when the public health authority (e.g. Ministry of Health) initiates and catalyses the WSP process in close coordination with the water utility that is responsible for day-to-day water supply operations. This approach was clearly evident from experiences in Peru, Costa Rica, Jamaica and Brazil. In contrast, it was evident how intermittent involvement by the public health authority detracted from SANNAA’s efforts to introduce the WSP methodology into national legislation.

The public health authority most often assumes the role of WSP catalyst because of its enforcement capacity, convening power and knowledge of the risks that most significantly affect drinking-water quality and human health. Similarly, some ( Summerill et al . 2010 ) have argued that public health advocacy is an essential component of WSP implementation success. Others ( Jalba et al . 2010 ) specifically indicate that before applying a methodology, such as the WSP, public health authority-water utility partnerships must first come together and define what effectiveness means for the partnership. Once defined, the public health authority-water utility partnership needs to determine indicators to measure their agreed-upon definition of effectiveness regarding the collaboration.

Adoption of the WSP methodology in these five countries demonstrates how modules and components of the WSP methodology have been incorporated into existing national drinking-water guidelines or established in practice. More specifically, integration of the WSP methodology has generated innovative adaptations for small water systems (as in Honduras) or a thoughtful, long-term readjustment of drinking-water regulations and alignment of water sector actors (as in Peru). Summerill et al . (2010) propose that the WSP methodology has arrived at a semi-institutionalization stage; knowledge of the methodology is widespread but institutionalization is not permanent. It now appears that the WSP methodology is more than a passing trend in the LAC region. However, widespread scaling up of national WSP efforts has been hindered by

  • different methodological approaches used at the utility level,
  • lack of tools – educational, monitoring, surveillance and research – to facilitate implementation efforts and
  • infrequent reliance on indicators and benchmarks to monitor performance improvements and make obvious the value of implementation.

WSP champions in LAC countries describe similar constraints and have emphasized the need for defining country-level strategic approaches so that implementation proceeds more uniformly. Examples of country-level strategies for rolling out the WSP methodology do exist; an example is the approach ( Veira 2011 ) proposed for WSP development in Portugal, and a WHO-IWA publication to support country-level implementation ( WHO/IWA 2010b ). Likewise, inventive and emerging approaches have been described here in the five case studies.

To strengthen emerging WSP efforts, proponents (e.g. donors, professional WSP networks, Ministries of Health, water utilities, laboratories and others) have the challenge of working together collaboratively and with local implementation partners to disseminate information about successful strategic implementation frameworks and to strengthen such frameworks with current research and support programs (e.g. WSP facilitation guidance, operator training, development of reliable indicators and benchmarks and technical assistance). Although several case study countries share the expectation that future versions of the WHO Guidelines for Drinking-water Quality will be less theoretical and offer more practical advice on WSP implementation, it is more likely that practical guidance will continue to come from other sources. Some tools and strategies already exist to help support these efforts such as the WHO/IWA Water Safety Plan Quality Assurance Tool ( WHO/IWA 2010a ), WHO’s Water Safety Planning for Small Community Water Supplies ( WHO 2012 ) and the CDC framework for evaluating the outcomes and impacts of WSPs ( Gelting et al . 2012 ). More tools will become available as WSP implementation becomes more widespread.

ACKNOWLEDGEMENTS

The authors are grateful to the following organizations and their representatives for sharing information about water safety plan efforts in the LAC region: Rafael Bastos, Federal University of Viçosa, Brazil; Darner Mora, Institute of Water and Sanitation of Costa Rica; Patricia Torres Lozada, Valle University, Cali, Colombia; Mirna Argueta, National Water and Sewage Services of Honduras; Argentina Martinez, Water and Sanitation Network of Honduras; Michelle Watts, Water Resources Authority of Jamaica; Lucio Dominguez Rodriguez, National Water Commission of Mexico; and Magaly Guevara, General Director’s Office of Environmental Health of Peru.

This paper is in the public domain: verbatim copying and redistribution of this paper are permitted in all media for any purpose, provided this notice is preserved along with the paper’s original DOI. Anyone using the paper is requested to properly cite and acknowledge the source as Journal of Water, Sanitation and Hygiene for Development 3(4), 541–548.

Contributor Information

Brian Hubbard, Department of Health and Human Services, Environmental Health Services Branch, National Center for Environmental Health, United States Centers for Disease Control and Prevention, 4770 Buford Highway, NE, MS F-60, Atlanta, GA 30341, USA.

Richard Gelting, Department of Health and Human Services, Environmental Health Services Branch, National Center for Environmental Health, United States Centers for Disease Control and Prevention, 4770 Buford Highway, NE, MS F-60, Atlanta, GA 30341, USA.

Maria del Carmen Portillo, Past Regional Coordinator, International Water Association, Latin American and Caribbean Office, Lima, Peru.

Tom Williams, International Water Association, Den Haag Office, Koningin Julianaplein 2–7th floor, 2595 AA The Hague, The Netherlands.

Ricardo Torres, Pan American Health Organization, Calle Victor Sanjinez No. 2678, Edificio Torre Barcelona Pisos 1, 6 and 7, Zona Sopocachi, La Paz, Bolivia.

  • Gelting RJ, Delea K & Medlin E 2012. A conceptual framework to evaluate the outcomes and impacts of water safety plans . J. Water Sanit. Hyg. Dev 2 ( 2 ), 103–111. [ PMC free article ] [ PubMed ] [ Google Scholar ]
  • Gunnarsdottir MJ & Gissurarson LR 2008. HACCP and water safety plans in Icelandic water supply: preliminary evaluation of experience . J. Water Health 6 ( 3 ), 377–382. [ PubMed ] [ Google Scholar ]
  • Havelaar A 1994. Application of HACCP to drinking water supply . Food Control 5 ( 3 ), 145–152. [ Google Scholar ]
  • IWA (International Water Association) 2009. [homepage on the Internet] IWA, London [updated 2009; cited 12 August 2010]. Bonn Charter for Safe Drinking Water [1 screen] . Available from: http://www.iwahq.org/Home/Themes/Water_and_health/Drinking_water_quality/Bonn_Charter/ .
  • IWA (International Water Association) 2010. WSP contributes to better water service in Spanish Town, Jamaica . Drinking Water Saf. Int.: Newsl. Bonn Netw 1 ( 4 ), 13. [ Google Scholar ]
  • Jalba DI, Cromar NJ, Pollard SJ, Charrois JW, Bradshaw R & Hrudey SE 2010. Safe drinking water: critical components of effective inter-agency relationships . Environ. Int 36 ( 1 ), 51–59. [ PubMed ] [ Google Scholar ]
  • Jayaratne A 2008. Application of a risk management system to improve drinking water safety . J. Water Health 6 ( 4 ), 547–557. [ PubMed ] [ Google Scholar ]
  • RASHON (Water and Sanitation Network of Honduras) 2009. Guía para la implementación de Planes de Seguridad de Agua en el Sector Rural de Honduras: Metodología basada en la gestión de riesgos . [Online] Available at: http://www.bvsde.paho.org/bvsacg/red_lac_psa/casos/honduras/guiaPSAHonduras.pdf (accessed May 23, 2011).
  • Reglamento de la calidad de Agua para Consumo Humano: D.S. N° 031-2010-SA/Ministerio de Salud Dirección General de Salud Ambiental (DIGESA) – Lima: Ministerio de Salud, 2011. [ Google Scholar ]
  • Rinehold A, Corrales L, Medlin E & Gelting RJ 2011. Water safety plan demonstration projects in Latin America and the Caribbean: lessons from the field . Water Sci. Technol 11 ( 3 ), 297–308. [ Google Scholar ]
  • Summerill C, Smith J, Webster J & Pollard S 2010. An international review of the challenges associated with securing ‘buy-in’ for water safety plans within providers of drinking water supplies . J. Water Health 8 ( 2 ), 387–398. [ PubMed ] [ Google Scholar ]
  • Veira J 2011. A strategic approach for water safety plans implementation in Portugal . J. Water Health 9 ( 1 ), 107–116. [ PubMed ] [ Google Scholar ]
  • WHO (World Health Organization) 2004. Guidelines for Drinking-water Quality: Volume 1 Recommendations , Third Edition. World Health Organization, Geneva. [ Google Scholar ]
  • WHO (World Health Organization) 2012. Water Safety Planning for Small Community Water Supplies: Step-by-Step Risk Management Guidance for Drinking-Water Supplies in Small Communities . World Health Organization, Geneva. [ Google Scholar ]
  • WHO/IWA (World Health Organization/International Water Association) 2010a. User Manual: Water Safety Plan Quality Assurance Tool . World Health Organization, Geneva. [ Google Scholar ]
  • WHO/IWA (World Health Organization/International Water Association) 2010b. Think Big, Start Small, Scale Up: A Road Map to Support Country-level Implementation of Water Safety Plans . World Health Organization, Geneva. [ Google Scholar ]
  • Zimmer H & Hinkfuss S 2007. Global Water Supplier Survey: Synthesis of main trends IWA survey report . International Water Association, London. [ Google Scholar ]

Water Treatment

How Water Treatment Plants Make Water Safe

Public drinking water systems use different water treatment methods to provide safe drinking water for their communities. Public water systems often use a series of water treatment steps that include coagulation, flocculation, sedimentation, filtration, and disinfection.

Graphic showing common water treatment steps

Water treatment steps

Coagulation.

Coagulation is often the first step in water treatment. During coagulation, chemicals with a positive charge are added to the water. The positive charge neutralizes the negative charge of dirt and other dissolved particles in the water. When this occurs, the particles bind with the chemicals to form slightly larger particles. Common chemicals used in this step include specific types of salts, aluminum, or iron.

Flocculation

Flocculation follows the coagulation step. Flocculation is the gentle mixing of the water to form larger, heavier particles called flocs. Often, water treatment plants will add additional chemicals during this step to help the flocs form.

Sedimentation

Sedimentation is one of the steps water treatment plants use to separate out solids from the water. During sedimentation, flocs settle to the bottom of the water because they are heavier than water.

Once the flocs have settled to the bottom of the water, the clear water on top is filtered to separate additional solids from the water. During filtration, the clear water passes through filters that have different pore sizes and are made of different materials (such as sand, gravel, and charcoal). These filters remove dissolved particles and germs, such as dust, chemicals, parasites, bacteria, and viruses. Activated carbon filters also remove any bad odors.

Water treatment plants can use a process called ultrafiltration in addition to or instead of traditional filtration. During ultrafiltration, the water goes through a filter membrane with very small pores. This filter only lets through water and other small molecules (such as salts and tiny, charged molecules).

Reverse osmosis external icon is another filtration method that removes additional particles from water. Water treatment plants often use reverse osmosis when treating recycled water external icon (also called reused water) or salt water for drinking.

Disinfection

After the water has been filtered, water treatment plants may add one or more chemical disinfectants (such as chlorine, chloramine, or chlorine dioxide ) to kill any remaining parasites, bacteria, or viruses. To help keep water safe as it travels to homes and businesses, water treatment plants will make sure the water has low levels of the chemical disinfectant when it leaves the treatment plant. This remaining disinfectant kills germs living in the pipes  between the water treatment plant and your tap.

In addition to or instead of adding chlorine, chloramine, or chlorine dioxide, water treatment plants can also disinfect water using ultraviolet (UV) light pdf icon [PDF – 7 pages] external icon or ozone pdf icon [PDF – 7 pages] external icon . UV light and ozone work well to disinfect water in the treatment plant, but these disinfection methods do not continue killing germs as water travels through the pipes between the treatment plant and your tap.

Water treatment plants also commonly adjust water pH and add fluoride after the disinfection step. Adjusting the pH improves taste, reduces corrosion (breakdown) of pipes, and ensures chemical disinfectants continue killing germs as the water travels through pipes. Drinking water with the right amount of fluoride  keeps teeth strong and reduces cavities.

Surface water collects on the ground or in a stream, river, lake, reservoir, or ocean.

Ground water is located below the surface of the earth in spaces between rock and soil.

Water treatment differs by community

Water may be treated differently in different communities depending on the quality of the source water that enters the treatment plant. The water that enters the treatment plant is most often either surface water or ground water . Surface water typically requires more treatment and filtration than ground water because lakes, rivers, and streams contain more sediment (sand, clay, silt, and other soil particles), germs, chemicals, and toxins than ground water.

Some water supplies may contain radionuclides (small radioactive particles), specific chemicals (such as nitrates ), or toxins (such as those made by cyanobacteria ). Specialized methods to control or remove these contaminants can also be part of water treatment. To learn more, visit EPA’s Ground Water and Drinking Water site external icon .

  • Water Disinfection with Chlorine and Chloramine
  • Well Treatment
  • Community Water Fluoridation
  • A Guide to Drinking Water Treatment Technologies for Household Use
  • EPA: Drinking Water Distribution Systems external icon
  • EPA: Drinking Water Regulations external icon
  • EPA: Drinking Water Contaminants external icon
  • Drinking Water
  • Healthy Swimming
  • Global WASH
  • Other Uses of Water
  • WASH-related Emergencies & Outbreaks
  • Water, Sanitation, & Environmentally-related Hygiene

To receive updates highlighting our recent work to prevent infectious disease, enter your email address:

Exit Notification / Disclaimer Policy

  • The Centers for Disease Control and Prevention (CDC) cannot attest to the accuracy of a non-federal website.
  • Linking to a non-federal website does not constitute an endorsement by CDC or any of its employees of the sponsors or the information and products presented on the website.
  • You will be subject to the destination website's privacy policy when you follow the link.
  • CDC is not responsible for Section 508 compliance (accessibility) on other federal or private website.

Join TheConstructor to ask questions, answer questions, write articles, and connect with other people. When you join you get additional benefits.

Confirm Password *

First Name *

Last Name *

Country Select a country… Åland Islands Afghanistan Albania Algeria Andorra Angola Anguilla Antarctica Antigua and Barbuda Argentina Armenia Aruba Australia Austria Azerbaijan Bahamas Bahrain Bangladesh Barbados Belarus Belau Belgium Belize Benin Bermuda Bhutan Bolivia Bonaire, Saint Eustatius and Saba Bosnia and Herzegovina Botswana Bouvet Island Brazil British Indian Ocean Territory British Virgin Islands Brunei Bulgaria Burkina Faso Burundi Cambodia Cameroon Canada Cape Verde Cayman Islands Central African Republic Chad Chile China Christmas Island Cocos (Keeling) Islands Colombia Comoros Congo (Brazzaville) Congo (Kinshasa) Cook Islands Costa Rica Croatia Cuba CuraÇao Cyprus Czech Republic Denmark Djibouti Dominica Dominican Republic Ecuador Egypt El Salvador Equatorial Guinea Eritrea Estonia Ethiopia Falkland Islands Faroe Islands Fiji Finland France French Guiana French Polynesia French Southern Territories Gabon Gambia Georgia Germany Ghana Gibraltar Greece Greenland Grenada Guadeloupe Guatemala Guernsey Guinea Guinea-Bissau Guyana Haiti Heard Island and McDonald Islands Honduras Hong Kong Hungary Iceland India Indonesia Iran Iraq Isle of Man Israel Italy Ivory Coast Jamaica Japan Jersey Jordan Kazakhstan Kenya Kiribati Kuwait Kyrgyzstan Laos Latvia Lebanon Lesotho Liberia Libya Liechtenstein Lithuania Luxembourg Macao S.A.R., China Macedonia Madagascar Malawi Malaysia Maldives Mali Malta Marshall Islands Martinique Mauritania Mauritius Mayotte Mexico Micronesia Moldova Monaco Mongolia Montenegro Montserrat Morocco Mozambique Myanmar Namibia Nauru Nepal Netherlands Netherlands Antilles New Caledonia New Zealand Nicaragua Niger Nigeria Niue Norfolk Island North Korea Norway Oman Pakistan Palestinian Territory Panama Papua New Guinea Paraguay Peru Philippines Pitcairn Poland Portugal Qatar Republic of Ireland Reunion Romania Russia Rwanda São Tomé and Príncipe Saint Barthélemy Saint Helena Saint Kitts and Nevis Saint Lucia Saint Martin (Dutch part) Saint Martin (French part) Saint Pierre and Miquelon Saint Vincent and the Grenadines San Marino Saudi Arabia Senegal Serbia Seychelles Sierra Leone Singapore Slovakia Slovenia Solomon Islands Somalia South Africa South Georgia/Sandwich Islands South Korea South Sudan Spain Sri Lanka Sudan Suriname Svalbard and Jan Mayen Swaziland Sweden Switzerland Syria Taiwan Tajikistan Tanzania Thailand Timor-Leste Togo Tokelau Tonga Trinidad and Tobago Tunisia Turkey Turkmenistan Turks and Caicos Islands Tuvalu Uganda Ukraine United Arab Emirates United Kingdom (UK) United States (US) Uruguay Uzbekistan Vanuatu Vatican Venezuela Vietnam Wallis and Futuna Western Sahara Western Samoa Yemen Zambia Zimbabwe

By registering, you agree to the Terms of Service and Privacy Policy . *

Log in to TheConstructor to ask questions, answer people’s questions, write articles & connect with other people. When you join you get additional benefits.

Join for free or log in to continue reading...

Username or email *

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Sorry, you do not have permission to ask a question, You must log in to ask a question. Join now!

The Constructor Logo

The Constructor

How to plan and prepare for water supply projects.

Do you need to remove the ads? Join now!

🕑 Reading time: 1 minute

A water supply project generally consists of a water collection unit, conveyance system, and units for treatment, purification, and distribution. It is necessary to plan, prepare, and design the entire water supply scheme before constructing the units. A proper plan will ensure that an efficient and economical system is finalized with minimum expenses. The scheme should be such that it can be constructed within the allotted budget while permitting future expansion.

1. Data Collection

Before planning for the water supply project, the following data have to be collected:

1.1 Hydrological Data

Hydrological data gives an overview of the long-term monitoring of the water sources that exist in the vicinity. The data will help in estimating the total availability of surface water.

1.2 Geological Data

The geological data will help in understanding the rock composition and other aspects of the ground surface. This will help in estimating the availability of land.

1.3 Water Requirement of the City

It is necessary to know the population count and its water needs. In case there is an industry in the vicinity, information regarding its water requirements also need to be found out. The current water demand and future requirements can be forecasted with this data.

1.4 Existing Water Supply Projects

The data on existing water supply projects in the vicinity will help determine the additional net availability of water. Moreover, the extra requirement of water can be calculated.

1.5 Sanitary Conditions of the Area

Along with the data on the sanitary conditions of the area, other sources of pollution must also be known. In case there is contamination of water due to multiple sources such as industries, factories, etc., then the cause should be identified, and remedial measures should be taken for the same.

1.6 Topography of the Area

This information is very important as it will highlight the low-lying areas and ridges concerning the available source, population density, etc. The intakes, treatment works, and distribution reservoirs can then be planned accordingly by considering an economic conveyance system.

1.7 Legal Data

The legal data is essential to stay out of any legal issues involving water rights, land ownership, land zoning, clearances, etc. The land options should be evaluated and the location with minimum legal approvals would pose as an ideal location for setting up the treatment plant.

1.8 Public Opinion

The public opinion will not only help in counteracting the claims of the government in an event of dispute regarding land acquisition, but also be helpful while seeking expenditure sanctions and approvals from the authorities.

2. Project Formulation

Once all the necessary data has been collected, it should be analyzed and the future needs must be evaluated. The following activities should be carried out in the project formulation stage:

  • Estimation of the population trend for the present and future based on the local conditions to identify the quantity of water required to be fulfilled by the project.
  • Locating a reliable source(s) of water so that all the demands of the community are met.
  • If needed, make provisions for the storage of water and design the system required to transmit the water from its source to the consumers.
  • Determination of the characteristics (physical, chemical, and biological) of the available water.
  • If needed, design the water treatment facility to improve water quality up to the standard of potable water.
  • Design the layout and units of the distribution system. It must include pumping stations, storage facility, size of pipes, fire hydrants, valves, and other important details.
  • Make provisions for the establishment of an organization to look after, maintain, and operate the units after construction.

3. Project Drawings

Drawings are a crucial part of the project as the entire plan and design of the components of the project are expressed by it. The following drawings are generally prepared and used for execution purposes:

3.1 Topographical Map

The topographical map shows the features of the area and includes sources of supply, roads, etc. In certain maps, the layout of the pipes that convey water from the source to the city may also be included. The scale of the map may be 1:500 or so.

3.2 Site Plan

A site plan of the town showing the location of the scheme and the area to be served by the scheme should be prepared. A scale of 1:500 may be used.

3.3 Contour Plan

A contour plan is essential as it shows the location of the water main, sub-mains, valves, branches, hydrants, pumping stations, etc. Sometimes, the contour plan and the site plan are combined to form one plan.

3.4 Flow Diagrams

The flow diagram includes the line plan and section and also shows the sequence of operations.

3.5 Detailed Drawing

Detailed drawings include components and units along with their dimensions and both structural and hydraulic details. The drawing should include different sections of the mains and branches, treatment units, etc.

4. Project Estimates

A preliminary estimate can be prepared once the preliminary drawings are made. It will give a tentative idea about the cost, and the same can be communicated to the authorities for seeking approval and sanctioning expenditure. In addition to the cost of the components and units of the system, the rough estimate must also include the cost of pump houses, staff quarters, etc. The tentative costs of the water supply system are given in Table-1.

After the formalities regarding the project approvals are completed, the detailed drawing and estimates are to be prepared. On obtaining the administrative approval, the competent authority of the concerned engineering department will sanction the estimate. After that, the bidding procedure for the execution of work can be carried out.

5. Project Reports

The project estimates and the drawings should always be supported by a report. It should justify the necessity of the project, the economic feasibility along with the benefits, and must have the pros and cons of any alternative proposals, the actual designs, proposed water rates, etc.

The basic components of a water supply system include a water collection unit, conveyance system, and units for treatment, purification, and distribution.

A proper plan ensures that an efficient and economic scheme is finalized along with minimum expenses. Thus, it is pivotal to devise a good plan for constructing a water supply scheme.

The project report justifies the project estimates and the drawings. It also states the necessity of the project, the economic feasibility along with the benefits, and must have the pros and cons of any alternative proposals, the actual designs, water rates proposed, etc.

Population Forecasting for Water Supply System

Water Demand in Water Supply System

Manya Kotian

Manya Kotian

Related posts.

Specifications of Brickwork in Superstructure

Specifications of Brickwork in Superstructure

Backfilling in Foundation : Types and Procedure

Backfilling in Foundation : Types and Procedure

  • Contact sales
  • Start free trial

The Ultimate Guide…

Waterfall Model

Brought to you by projectmanager, the online project planning tool used by over 35,000 users worldwide..

ProjectManager's Gantt chart, showing a waterfall project

What Is the Waterfall Methodology in Project Management?

The phases of the waterfall model, waterfall software development life cycle.

  • What Is Waterfall Software?
  • Desktop vs Online Waterfall Software

Must-Have Features of Waterfall Software

  • The Waterfall Model & ProjectManager.com

Waterfall vs. Agile

  • Pros & Cons of the Waterfall Model

Benefits of Project Management Software for Waterfall Projects

Waterfall methodology resources.

The waterfall methodology is a linear project management approach, where stakeholder and customer requirements are gathered at the beginning of the project, and then a sequential project plan is created to accommodate those requirements. The waterfall model is so named because each phase of the project cascades into the next, following steadily down like a waterfall.

It’s a thorough, structured methodology and one that’s been around for a long time, because it works. Some of the industries that regularly use the waterfall model include construction, IT and software development. As an example, the waterfall software development life cycle, or waterfall SDLC, is widely used to manage software engineering projects.

Related: 15 Free IT Project Management Templates for Excel & Word

Gantt charts are the preferred tool for project managers working in waterfall method. Using a Gantt chart allows you to map subtasks, dependencies and each phase of the project as it moves through the waterfall lifecycle. ProjectManager’s waterfall software offers these features and more.

A screenshot of the gantt chart interface in ProjectManager

Manage waterfall projects in minutes with ProjectManager— learn more .

The waterfall approach has, at least, five to seven phases that follow in strict linear order, where a phase can’t begin until the previous phase has been completed. The specific names of the waterfall steps vary, but they were originally defined by its inventor, Winston W. Royce, in the following way:

Requirements: The key aspect of the waterfall methodology is that all customer requirements are gathered at the beginning of the project, allowing every other phase to be planned without further customer correspondence until the product is complete. It is assumed that all requirements can be gathered at this waterfall management phase.

Design: The design phase of the waterfall process is best broken up into two subphases: logical design and physical design. The logical design subphase is when possible solutions are brainstormed and theorized. The physical design subphase is when those theoretical ideas and schemas are made into concrete specifications.

Implementation: The implementation phase is when programmers assimilate the requirements and specifications from the previous phases and produce actual code.

Verification: This phase is when the customer reviews the product to make sure that it meets the requirements laid out at the beginning of the waterfall project. This is done by releasing the completed product to the customer.

Maintenance: The customer is regularly using the product during the maintenance phase, discovering bugs, inadequate features and other errors that occurred during production. The production team applies these fixes as necessary until the customer is satisfied.

Related: Free Gantt Chart Template for Excel

Let’s hypothesize a simple project, then plan and execute it with the waterfall approach phases that you just learned. For our waterfall software development life cycle example, we’ll say that you’re building an app for a client. The following are the steps you’d take to reach the final deliverable.

Requirements & Documents

First, you must gather all the requirements and documentation you need to get started on the app.

  • Project Scope: This is one of the most important documents in your project, where you determine what the goals associated with building your app are: functional requirements, deliverables, features, deadlines, costs, and so on.
  • Stakeholder Expectations: In order to align the project scope with the expectations of your stakeholders—the people who have a vested interest in the development of the app—you want to conduct interviews and get a clear idea of exactly what they want.
  • Research: To better serve your plan, do some market research about competing apps, the current market, customer needs and anything else that will help you find the unserved niche your app can serve.
  • Assemble Team: Now, you need to get the people and resources together who will create the app, from programmers to designers.
  • Kickoff: The kickoff meeting is the first meeting with your team and stakeholders where you cover the information you’ve gathered and set expectations.

System Design

Next, you can begin planning the project proper. You’ve done the research, and you know what’s expected from your stakeholders . Now, you have to figure out how you’re going to get to the final deliverable by creating a system design. Based on the information you gathered during the first phase, you’ll determine hardware and software requirements and the system architecture needed for the project.

  • Collect Tasks: Use a work breakdown structure to list all of the tasks that are necessary to get to the final deliverable.
  • Create Schedule: With your tasks in place, you now need to estimate the time each task will take. Once you’ve figured that out, map them onto a Gantt chart , and diligently link dependencies. You can also add costs to the Gantt, and start building a budget.

Implementation

Now you’re ready to get started in earnest. This is the phase in which the app will be built and tested. The system from the previous phase is first developed in smaller programs known as units. Then each goes through a unit testing process before being integrated.

  • Assign Team Tasks: Team members will own their tasks and be responsible for completing them, and for collaborating with the rest of the team. You can make these tasks from a Gantt chart and add descriptions, priority, etc.
  • Monitor & Track: While the team is executing the tasks, you need to monitor and track their progress in order to make sure that the project is moving forward per your schedule.
  • Manage Resources & Workload: As you monitor, you’ll discover issues and will need to reallocate resources and balance workload to avoid bottlenecks.
  • Report to Stakeholders: Throughout the project, stakeholders need updates to show them progress. Meet with them and discuss a regular schedule for presentations.
  • Test: Once the team has delivered the working app, it must go through extensive testing to make sure everything is working as designed.
  • Deliver App: After all the bugs have been worked out, you’re ready to give the finished app to the stakeholders.

System Testing and Deployment

During this phase you’ll integrate all the units of your system and conduct an integration testing process to verify that the components of your app work properly together.

Once you verify that your app is working, you’re ready to deploy it.

Verification

Though the app has been delivered, the software development life cycle is not quite over until you’ve done some administrative tasks to tie everything up. This is technically the final step.

  • Pay Contracts: Fulfil your contractual obligations to your team and any freelance contractors. This releases them from the project.
  • Create Template: In software like ProjectManager, you can create a template from your project, so you have a head start when beginning another, similar one.
  • Close Out Paperwork: Make sure all paperwork has been rubber stamped and archived.
  • Celebrate: Get everyone together, and enjoy the conclusion of a successful project!

Maintenance

Of course, the nature of any software development project is that, through use by customers, new bugs will arise and must be squashed. So, past the verification stage, it’s typically expected that you will provide maintenance beyond launch. This is an ongoing, post-launch phase that extends for as long as your contract dictates.

What Is Waterfall Project Management Software?

Waterfall project management software is used to help you structure your project processes from start to finish. It allows managers to organize their tasks, sets up clear schedules in Gantt charts and monitor and control the project as it moves through its phases.

Project management training video (fgc8zj1dix)

A waterfall project is broken up into phases, which can be achieved on a Gantt chart in the waterfall project management software. Managers can set the duration for each task on the Gantt and link tasks that are dependent on one another to start or finish.

While waterfall software can be less flexible and iterative than more agile frameworks, projects do change frequently—and there must be features that can capture these changes in real-time with dashboards and reports, so that the manager can clear up bottlenecks or reallocate resources to keep teams from having their work blocked. Microsoft Project is one of the most commonly used project management software, but it has major drawbacks that make ProjectManager a great alternative .

Desktop vs Online Project Management Waterfall Software

When it comes to waterfall software, you can choose from either a desktop application or online, cloud-based project management software. This might not seem to be a big issue, but there are important distinctions between these two types of offerings.

That’s because there are differences between the two applications, and knowing those differences will help you make an informed decision.

Desktop waterfall software tends to have a more expensive up-front cost, and that cost can rise exponentially if you are required to pay per-user licensing fees for every member of your team.

Online waterfall software, on the other hand, is typically paid for on a subscription basis, and that subscription is usually a tiered payment plan depending on the number of users.

Connectivity

Online software, naturally, must be connected to the internet. This means your speed and reliability can vary depending on your internet service provider. It also means that if you lose connectivity, you can’t work.

Although the difference is minor, desktop waterfall software never has to worry about connection outages.

If security is a concern, rest assured that both options are highly secure. Desktop software that operates on a company intranet is nigh impenetrable, which can provide your company with a greater sense of security.

Strides in web security, like two-factor authentication and single-sign have made online, cloud-based waterfall software far more secure. Also, online tools have their data saved to the cloud, so if you suffer a crash on your desktop that might mean the end of your work.

Accessibility

Desktops are tied to the computers they are installed to or, at best, your office’s infrastructure. That doesn’t help much if you have distributed teams or work off site, in the field, at home and so on.

Online software is accessible anywhere, any time—so long as you have an internet connection. This makes it always accessible, but even more importantly, it delivers real-time data, so you’re always working on the current state of the project.

Waterfall software helps to organize your projects and make them run smoothly. When you’re looking for the right software to match your needs, make sure it has the following features.

Phases & Milestones icon

Keep Your Project Structured

Managing a project with the waterfall method is all about structure. One phase follows another. To break your project into these stages, you need an online Gantt chart that has a milestone feature. This indicates the date where one phase of the waterfall process stops and another begins.

Phases & Milestones image

Control Your Task and Schedule

The Gantt chart is a waterfall’s best friend. It organizes your tasks, sets the duration and links tasks that are dependent to keep work flowing later on. When scheduling, you want a Gantt that can automatically calculate your critical path to help you know how much float you have.

Dependencies & CPM image

Have Your Files Organized

Waterfall projects, like all projects, collect a lot of paperwork. You want a tool with the storage capacity to hold all your documents and make them easy to find when you need them. Also, attaching files to tasks gives teams direction and helps them collaborate.

Attachments image

Know If You’re on Schedule

Keeping on track means having accurate information. Real-time data makes it timely, but you also need to set your baseline and have dashboard metrics and reporting to compare your actual progress to your planned progress. This makes sure you stay on schedule.

Planned vs Actuals image

Get an Overview of Performance

Dashboards are designed to collect data and display it over several metrics, such as overall health, workload and more. This high-level view is important, so you want to have a feature that automatically calculates this data and doesn’t require you to manually input it.

Dashboards image

Make Data-Based Decisions

Reports dive deeper into data and get more details on a project’s progress and performance. Real-time data makes them accurate. Look for ease of use—it should only take a single click to generate and share. You’ll also want to filter the results to see only what you’re interested in.

Reports image

The Waterfall Model & ProjectManager

ProjectManager is an award-winning project management software that organizes teams and projects. With features such as online Gantt charts, task lists, reporting tools and more, it’s an ideal tool to control your waterfall project management.

Sign up for a free 30-day trial and follow along to make a waterfall project in just a few easy steps. You’ll have that Gantt chart built in no time!

1. Upload Requirements & Documents

Waterfall project management guarantees one thing: a lot of paperwork. All the documentation and requirements needed to address for the project can quickly become overwhelming.

You can attach all documentation and relevant files to our software, or directly on a task. Now, all of your files are collected in one place and are easy to find. Don’t worry about running out of space—we have unlimited file storage.

2. Use a Work Breakdown Structure to Collect Tasks

Getting to your final deliverable will require many tasks. Planning the waterfall project means knowing every one of those tasks, no matter how small, and how they lead to your final deliverable. A work breakdown structure is a tool to help you figure out all those steps.

To start, use a work breakdown structure (WBS) to collect every task that is necessary to create your final deliverable. You can download a free WBS template here . Then, upload the task list to our software.

A screenshot of a gantt chart in ProjectManager

3. Open in Gantt Project View

Gantt charts are essential project management tools used for planning and scheduling. They collect your tasks in one place on a timeline . From there, you can link dependencies, set milestones, manage resources and more.

In the software, open the Gantt chart view and add deadlines, descriptions, priorities and tags to each task.

4. Create Phases & Milestones

Milestones are what separates major phases in a waterfall method project. Waterfall methodology is all about structure and moving from one phase to the next, so breaking your project into milestones is key to the waterfall method.

In the Gantt view, create phases and milestones to break up the project. Using the milestone feature, determine when one task ends and a new one begins. Milestones are symbolized by a diamond on the Gantt.

5. Set Dependencies in a Gantt Chart

Dependent tasks are those that cannot start or finish until another starts or finishes. They create complexities in managing any waterfall project.

Link dependent tasks in the Gantt chart. Our software allows you to link all four types of dependencies: start-to-start, start-to-finish, finish-to-finish and finish-to-start. This keeps your waterfall project plan moving forward in a sequential order and prevents bottlenecks.

6. Assign From Gantt Charts

Although you’ve planned and scheduled a project, it’s still just an abstraction until you get your team assigned to execute those tasks. Assigning is a major step in managing your waterfall project and needs to happen efficiently.

Assign team members to tasks right from the Gantt chart. You can also attach any related images or files directly to the task. Collaboration is supported by comments at the task level. Anyone assigned or tagged will get an email alert to notify them of a comment or update.

ProjectManager's Gantt charts are ideal for waterfall project management

7. Manage Resources & Workload

Resources are anything you need to complete the project. This means not only your team, but also the materials and tools that they need. The workload represents how many tasks your team is assigned, and balancing that work keeps them productive.

Keep track of project resources on the Workload view. See actual costs, and reallocate as needed to stay on budget. Know how many tasks your team is working on with easy-to-read color-coded charts, and balance their workload right on the page.

A screenshot of ProjectManager’s resource management window, each team member has a row that shows their workload

8. Track Progress in Dashboard & Gantt

Progress must be monitored to know if you’re meeting the targets you set in your waterfall method plan. The Gantt shows percentage complete, but a dashboard calculates several metrics and shows them in graphs and charts.

Monitor your project in real time and track progress across several metrics with our project dashboard . We automatically calculate project health, costs, tasks and more and then display them in a high-level view of your project. Progress is also tracked by shading on the Gantt’s duration bar.

ProjectManager’s dashboard view, which shows six key metrics on a project

9. Create Reports

Reporting serves two purposes: it gives project managers greater detail into the inner-workings of their waterfall project to help them make better decisions, and acts as a communication tool to keep stakeholders informed.

Easily generate data-rich reports that show project variance, timesheets , status and more. Get reports on your planned vs. the actual progress. Filter to show just the information you want. Then, share with stakeholders during presentations and keep everyone in the loop.

A screenshot of a project report generated by ProjectManager

10. Duplicate Plan for New Projects

Having a means to quickly copy projects is helpful in waterfall methodology, as it jumpstarts the next project by recreating the major steps and allowing you to make tweaks as needed.

Create templates to quickly plan any recurring waterfall projects. If you know exactly what it takes to get the project done, then you can make it into a template. Plus, you can import proven project plans from MSP, and task lists from Excel and Word.

The waterfall methodology is one of two popular methods to tackle software engineering projects; the other method is known as Agile .

It can be easier to understand waterfall when you compare it to Agile. Waterfall and Agile are two very different project management methodologies , but both are equally valid, and can be more or less useful depending on the project.

Waterfall Project Management

If the waterfall model is to be executed properly, each of the phases we outlined earlier must be executed in a linear fashion. Meaning, each phase has to be completed before the next phase can begin, and phases are never repeated—unless there is a massive failure that comes to light in the verification or maintenance phase.

Furthermore, each phase is discrete, and pretty much exists in isolation from stakeholders outside of your team. This is especially true in the requirements phase. Once the customer’s requirements are collected, the customers cease to play any role in the actual waterfall software development life cycle.

Agile Project Management

The agile methodology differs greatly from the waterfall approach in two major ways; namely in regards to linear action and customer involvement. Agile is a nimble and iterative process, where the product is delivered in stages to the customer for them to review and provide feedback.

Instead of having everything planned out by milestones, like in waterfall, the Agile software development method operates in “sprints” where prioritized tasks are completed within a short window, typically around two weeks.

These prioritized tasks are fluid, and appear based on the success of previous sprints and customer feedback, rather than having all tasks prioritized at the onset in the requirements phase.

Understanding the Difference Between Waterfall & Agile

The important difference to remember is that a waterfall project is a fixed, linear plan. Everything is mapped out ahead of time, and customers interact only at the beginning and end of the project. The Agile method, on the other hand, is an iterative process, where new priorities and requirements are injected into the project after sprints and customer feedback sessions.

Pros & Cons of the Waterfall Project Management

There are several reasons why project managers choose to use the waterfall project management methodology. Here are some benefits:

  • Project requirements are agreed upon in the first phase, so planning and scheduling is simple and clear.
  • With a fully laid out project schedule , you can give accurate estimates for your project cost, resources and deadlines.
  • It’s easy to measure progress as you move through the waterfall model phases and hit milestones.
  • Customers aren’t perpetually adding new requirements to the project, which can delay production.

Of course, there are drawbacks to using the waterfall method as well. Here are some disadvantages to this approach:

  • It can be difficult for customers to articulate all of their needs at the beginning of the project.
  • If the customer is dissatisfied with the product in the verification phase, it can be very costly to go back and design the code again.
  • A linear project plan is rigid, and lacks flexibility for adapting to unexpected events.

Although it has its drawbacks, a waterfall project management plan is very effective in situations where you are encountering a familiar scenario with several knowns, or in software engineering projects where your customer knows exactly what they want at the onset.

Using a project management software is a great way to get the most out of your waterfall project. You can map out the steps and link dependencies to see exactly what needs to go where.

As illustrated above, ProjectManager is made with waterfall methodology in mind, with a Gantt chart that can structure the project step-by-step. However, we have a full suite of features, including kanban boards that are great for Agile teams that need to manage their sprints.

With multiple project views, both agile and waterfall teams and more traditional ones can work from the same data, delivered in real time, only filtered through the project view most aligned to their work style. We take the waterfall methodology and bring it into the modern world.

Now that you know how to plan a waterfall project, give yourself the best tools for the job. Take a free 30-day trial and see how ProjectManager can help you plan with precision, track with accuracy and deliver your projects on time and under budget.

Start My Free Trial

  • Gantt Chart Software
  • Project Planning Software
  • Project Scheduling Software
  • Requirements Gathering Template
  • Gantt Chart Template
  • Change Request Form
  • Project Management Trends (2022)
  • SDLC – The Software Development Life Cycle
  • IT Project Management: The Ultimate Guide
  • Project Management Methodologies – An Overview
  • Project Management Framework Types, Key Elements & Best Practices

Start your free 30-day trial

Deliver faster, collaborate better, innovate more effectively — without the high prices and months-long implementation and extensive training required by other products.

L.A. County captures 96 billion gallons of water during ‘super year’ of storms

After heavy rains, water flows down the concrete-lined Los Angeles River.

  • Show more sharing options
  • Copy Link URL Copied!

Heavy rains this winter and spring sent torrential flows down local creeks and rivers, and L.A. County managed to capture and store a significant amount of that stormwater, officials say.

To be exact, they snared an estimated 295,000 acre-feet of water since last October, or 96.3 billion gallons.

That’s enough water to supply about 2.4 million people a year — nearly one-fourth of the county’s population.

“This year has really been a super year,” said Mark Pestrella, director of L.A. County Public Works.

methodology of water plan

Aggressive and impactful reporting on climate change, the environment, health and science.

The county, working with the Los Angeles Department of Water and Power and other agencies, was able to capture and store this amount of water thanks in part to investments totaling more than $1 billion since 2001, Pestrella said. Some of the money has gone toward raising dams and increasing the capacity of spreading grounds, where water is sent into basins and then percolates underground into aquifers.

“Our investments are paying off,” Pestrella said.

The county has also spent more than $1 billion since 2001 on removing sediment from reservoirs to ensure their water-catching capacity isn’t diminished.

A large portion of the funds have come from the L.A. County Flood Control District, which receives revenues from property taxes.

Money for stormwater-catching infrastructure has also come through the Safe, Clean Water Program , which was established after county voters passed Measure W in 2018.

Though the amount of runoff captured since October has been substantial, the county’s facilities took in more water during the major storms over the previous 12 months — an estimated 626,000 acre-feet, or enough to supply about 5 million residents for a year.

The last two wet seasons have dumped exceptional amounts of rain, approaching the record set between 1888 and 1890 .

A bar chart shows the five wettest rain seasons in downtown LA. October 1888 to 1890 had the most rain at 54.1 inches, followed by 2022 to 2024.

The runoff has collected behind 14 county dams and flowed downstream to spreading grounds that recharge groundwater at 27 county-operated facilities. Much of the water collected over the past winter is now banked underground.

Not only does the captured rain add to the supplies of local cities, it’s much cheaper than importing water from Northern California or the Colorado River.

Storm runoff that doesn’t get captured flows into the Pacific Ocean via the San Gabriel and Los Angeles rivers, as well as other waterways.

Capturing more stormwater and reducing reliance on imported water are among the main goals of L.A. County’s water plan, which the Board of Supervisors adopted in December .

LONG BEACH, CALIF. - DEC. 6, 2023. A heron takes flight off of an abandoned shopping cart in the bed of the Los Angeles River in Long Beach on Tuesday, Dec. 6, 2023. L.A. County aims to collect billions more gallons of local water by 2045. (Luis Sinco / Los Angeles Times)

Climate & Environment

L.A. County aims to collect billions more gallons of local water by 2045

The L.A. County Board of Supervisors has adopted the county’s first water plan, which outlines how the region must stop importing 60% of its water by 2045.

Dec. 6, 2023

County officials developed the plan to make the region more resilient to the effects of climate change, including more severe droughts as well as storms that are projected to unleash more intense downpours. By 2045, the plan calls for L.A. County to become 80% reliant on local water supplies by capturing more stormwater, recycling wastewater and boosting conservation.

“We know with weather volatility, we have to save every drop of water that we can. So this has to continue to be a trend that we invest in,” said Lindsey P. Horvath, chair of the Board of Supervisors.

Horvath said she was pleased to see the amount of rainwater captured, and that the county’s plan lays out a path for taking advantage of downpours when they come.

“The more we see investment in infrastructure, the more we’re going to be able to capture and make a difference, and keep that water resource local.”

Officials at the L.A. Department of Water and Power said the agency captured about 99,000 acre-feet of stormwater between Oct. 15 and April 15 — a portion of that through joint efforts with the county.

That included more than 12,200 acre-feet of stormwater that flowed into the city’s Tujunga Spreading Grounds, which was expanded in a project completed in 2022.

“We’ve been really building capacity to catch major storm flows,” said Martin Adams, the DWP’s general manager. “The fact that we actually caught more is directly the result of the efforts that the water agencies have made locally to grab that water before it gets to the ocean.”

Since 2008, the DWP has invested more than $130 million in stormwater infrastructure projects.

City officials plan to further boost local water supplies by investing in more stormwater capture, as well as recycling wastewater and cleaning up contaminated groundwater in the San Fernando Valley.

Projects that divert storm runoff for storage underground make economic sense, Adams said.

“If we put water in the ground, it makes us more drought-proof, it makes us more resilient,” Adams said. “We’re going to have a much bigger portion of the city’s water supply right here under our old feet.”

Pestrella said L.A. County officials are working toward a goal of doubling the area’s stormwater capture capacity.

Lone Pine, CA - February 14: Clouds and the Sierra crest are reflected in the Owens River at the LADWP Pumpback Station on Wednesday, Feb. 14, 2024 in Lone Pine, CA. (Brian van der Brug / Los Angeles Times)

L.A.’s water supplies are in good shape. But is the city ready for the next drought?

Current conditions are promising, but L.A. must maintain its ethos of conservation and prepare for an inevitable return to dry times ahead, LADWP officials say.

April 15, 2024

Environmental advocates have supported efforts to harness more runoff, recycle water and lessen reliance on supplies from the Sacramento-San Joaquin River Delta and the depleted reservoirs of the Colorado River .

The amount of water captured this year represents a significant step forward, said Conner Everts, executive director of the Southern California Watershed Alliance.

“It’s impressive how much more we’ve done now with the projects that have been in play in the last five to 10 years,” Everts said. “We have to be more reliant on local water supplies, and we have a great potential to continue to do that.”

Toward a more sustainable California

Get Boiling Point, our newsletter exploring climate change, energy and the environment, and become part of the conversation — and the solution.

You may occasionally receive promotional content from the Los Angeles Times.

More to Read

Metropolitan Water District headquarters located at 700 Alameda Street in downtown Los Angeles.

Editorial: Even with the coming tax and rate hikes, water in SoCal is pretty cheap

April 30, 2024

HOOVER DAM, NV and AZ - APRIL 03: View of the Colorado River continuing past Hoover Dam, on the border between Nevada and Arizona, on Monday, April 3, 2023. (Brian van der Brug / Los Angeles Times)

SoCal will see spike in water rates, taxes to cover rising costs and conservation efforts

April 10, 2024

CASTAIC, CA - FEBRUARY 27: A recreational vehicle lays at the bottom of a cliff in the Santa Clara River at Valencia Travel Village RV Resort in Castaic, CA on Monday, Feb. 27, 2023. The damage was caused by the previous storm. The weather forecast calls for a few more days of rain. (Myung J. Chun / Los Angeles Times)

L.A. County faces $12.5 billion in climate costs through 2040, study says

April 4, 2024

methodology of water plan

Ian James is a reporter who focuses on water in California and the West. Before joining the Los Angeles Times in 2021, he was an environment reporter at the Arizona Republic and the Desert Sun. He previously worked for the Associated Press as a correspondent in the Caribbean and as bureau chief in Venezuela. He is originally from California.

More From the Los Angeles Times

Sherry Padgett looks at the gray barrier at the Stauffer Chemical Co./AstraZeneca site on Monday, May 6, 2024 in Richmond.

Revelations of possible radioactive dumping around the Bay Area trigger new testing at parks

May 14, 2024

VENTURA, CA - JANUARY 07, 2016 - Forceful and beautiful waves crash into the sea walls of homes at Mondo's Beach under the mountains of the recent Solimar fire at high tide sunrise west of Ventura Thursday morning January 07, 2016 as El Nino storms move through Southern California with more rain and heavy surf. (Al Seib / Los Angeles Times)

Like water sloshing in a giant bathtub, El Niño begins an inevitable retreat

May 12, 2024

Silverwood Lake in San Bernardino County.

People and pets urged to avoid San Bernardino lake due to toxic algal bloom

May 8, 2024

DUNNIGAN, YOLO COUNTY, CALIFORNIA-Jan. 21, 2023-In Yolo County, near the town of Dunnigan, officials from the state Department of Water Resources are working with farmers on a project to recharge the underground aquifers. The water is allowed to percolate into the ground to replenish the aquifers, while also providing habitat for threatened shore birds and other birds. Sunrise over the flooded fields that are part of the program on Jan. 21, 2023. (Carolyn Cole / Los Angeles Times)

A wet year boosted California’s groundwater, but not enough to address long-term declines

May 7, 2024

UN-Water

Step-by-step methodology for monitoring integrated water resources management (6.5.1)

integrated_monitoring_PICTURE_WEB-07

The Integrated Monitoring Guide provides a basis for national governments to monitor progress towards the new Sustainable Development Goal on water and sanitation (SDG 6). The Guide includes step-by-step methodologies outlining how countries can monitor each of the SDG 6 global indicators.

The methodologies have been designed to allow countries to monitoring SDG 6 at a level in line with their capacity and resource availability, and they promote harmonization and the use of international standards.

The step-by-step methodology for 6.5.1 explains how to monitor the degree of integrated water resources management implementation (0-100), including definitions, computational steps, and recommendations on spatial and temporal resolutions.

UN Environment is the custodian agency of indicator 6.5.1, and they have developed this methodology in a consultative process that included countries, international agencies and other experts.

Learn more about water and sanitation in the 2030 Agenda for Sustainable Development, and the Integrated Monitoring Initiative for SDG 6  here .

  • Step-by-step methodology 6.5.1 on integrated water resources management Arabic ,
  • Step-by-step methodology 6.5.1 on integrated water resources management Chinese ,
  • Step-by-step methodology 6.5.1 on integrated water resources management English ,
  • Step-by-step methodology 6.5.1 on integrated water resources management French ,
  • Step-by-step methodology 6.5.1 on integrated water resources management Russian ,
  • Step-by-step methodology 6.5.1 on integrated water resources management Spanish

UN-Water Publications

UN-Water’s publications can be divided into two main groups: the publications that represent all Members and Partners of UN-Water – the collective products – and the publications that are under the UN-Water umbrella but produced by groups or individual UN-Water Members and/or Partners – the related products.

Related Publications

  • Integrated Monitoring Guide for SDG 6 – AR, CH, EN, FR, RU, SP Read more

StarTribune

Mall of america water park plan prompts climate change concerns.

The vision for the new water park at the Mall of America features colorful swirling slides, a wave pool, a lazy river and a retractable roof.

Members of the Sustainability Commission in Bloomington see something else: high water and energy use that conflicts with the city's goals to fight climate change.

The City Council approved the use of public financing for the $373 million Mystery Cove project, along with the project's basic terms and conditions, in April. But that approval of the water park plan, which had already been scaled back, came despite the Bloomington Sustainability Commission's apprehension.

The commission had sent a letter to city officials outlining members' "significant concerns" with the park, including a reminder that the city declared a climate emergency in 2022 and adopted an Energy Action Plan that calls for a 75% reduction in greenhouse gas emissions by 2035.

"A water park is a major energy user and a major water user. We can't get past that," said Angie Begosh, chair of the commission. "We need to be doing everything we can to curb our energy use and our resource use."

But Triple Five Group, the mall's owners, say updated plans will already reduce electricity use due to a smaller footprint and retractable roof feature. The Canadian company can't commit to additional sustainability certifications, officials said, because building standards for "green" water parks don't yet exist.

Triple Five also can't quantify how much energy the new plans will save because the project is just entering the engineering phase, said Kurt Hagen, senior vice president of development for Triple Five at the Mall of America.

Even so, Hagen said, "It is our goal that this become the most sustainable water park in the country."

More than a mall

Plans for a water park date back to before the mall was even built, said Bloomington Mayor Tim Busse, noting that other Triple Five malls, including the West Edmonton Mall in Alberta, have water parks.

"There's always been the goal for Triple Five and the Mall of America to diversify [offerings] so they don't fall into the 'retail only' trap," Busse said, adding that a 50/50 mix of retail and entertainment is ideal.

Despite several significant pushes over the years, the water park — slated for a parking lot near IKEA north of the mall — has never materialized.

The latest iteration is about 30% smaller than previous plans to reduce costs. It would include a 220,000-square-foot building with one wave pool instead of two, accommodate 3,000 people and incorporate 30 different rides and slides, said Holly Masek, Bloomington's port authority administrator.

A retractable roof that opens to reduce heat and humidity inside, decreasing the need for air conditioning, is "part of the 'wow' factor that will make this project different," Masek said.

Masek said she believes there's enough demand for the park even with the Great Wolf Lodge water park and hotel nearby.

"I honestly think there is room in this market for both," she said, citing the many water parks at Wisconsin Dells. "As these entertainment features start to grow … I think we will see a cluster effect."

The project will use $160 million in tax-increment financing, some of which will dry up if it's not used by December 2025.

"We really need to move this project forward at an accelerated pace or this funding will no longer be available," she said.

Sustainability requirements?

The Sustainability Commission's letter said the city should ensure that a project with that much public financing "aligns with the city's values" as the time to address climate change dwindles.

The group, which has an advisory role, also wrote a second letter to city officials casting doubt on whether the retractable roof, to be manufactured by a Canadian company called OpenAire, would work as Triple Five officials have said, achieving 30% energy savings. Commissioners noted that the energy reduction estimate was from a case study of a small, 6,000-square-foot pool with a retractable roof in Massachusetts.

Begosh said the group doesn't want the roof to be the only sustainable element.

The commission suggested broader goals, such as having the building achieve LEED Silver certification — or another similar standard — plus the addition of $5 million in features like natural landscaping, sustainable materials and energy-efficient equipment. If those standards can't be achieved, the commission said the developer should spend $7.5 million on landscaping and other other efficient features.

Hagen of Triple Five said he's met with the council that certifies LEED projects. They want to create a new LEED category for water parks, he said, adding that Mystery Cove could then be the first certified water park in the U.S.

Other water parks in the U.S. already feature retractable roofs, Hagen said, and he's "very confident" that the roof will reduce energy consumption.

Busse said that while he appreciated the commission's input, he didn't think it was fair for it to suggest specific criteria for making the project "green" when the city doesn't have any official guidelines. Establishing broad criteria for buildings across the city is "probably work we need to do as we move forward," he said.

Erin Adler is a suburban reporter covering Dakota and Scott counties for the Star Tribune, working breaking news shifts on Sundays. She previously spent three years covering K-12 education in the south metro and five months covering Carver County.

  • Golden Bachelorette announced, and it's not Minnesota's Leslie Fhima
  • Minnesota legislation targets health insurers' power to block medical care, medications
  • Counterpoint: So you're leaving Minneapolis. I'm staying.
  • Red Lobster closes dozens of locations across the US just months after 'endless shrimp' losses

Heather Edelson wins Hennepin County Board seat in special election

In April, demonstrators stood along Kenwood Trail during a rally before a school board meeting at the Lakeville District Office.

Lakeville teachers approve contract agreement with district

Kayaker's body found in central minnesota lake.

Mike Randolph is headed to Northern Lakes, a co-op that went 18-10 last season.

Randolph is back in the game, at Class 1A boys hockey co-op

A mosque would be part of the Madinah Lakes development in Lino Lakes.

Developer vows to push forward on Lino Lakes mosque project even if city tries to stop it

A rendering of the proposed Mystery Cove Waterpark at Mall of America

  • Heather Edelson wins Hennepin County Board seat in special election • Local
  • Southern Minnesota man pleads guilty for role in Jan. 6 Capitol riot • Rochester
  • Charges: Twin Cities firefighter was killed in furious crossfire between groups • West Metro
  • Minnesota legislation targets health insurers' power to block medical care, medications • Local
  • New high-end Duluth development poised to change low-key neighborhood • Local

methodology of water plan

© 2024 StarTribune. All rights reserved.

methodology of water plan

A Simple Technique for Removing Microplastics from Drinking Water Revealed by Research

A s microplastic fragments increasingly infiltrate our systems, largely through consumption of contaminated food and drink, scientists are seeking effective solutions to combat this issue.

Researchers from China’s Guangzhou Medical University and Jinan University have discovered a straightforward method to extract these tiny plastic pieces from water.

The team experimented with both softened water and mineral-rich hard tap water , introducing nanoplastics and microplastics (NMPs) to the samples, following which they boiled and subsequently filtered the mixture to remove the remaining solids.

In some experiments, this boiling and filtering process successfully eliminated up to 90 percent of the NMPs, depending on the nature of the water being treated. This technique is especially convenient since it can be carried out using common kitchen equipment.

The research team states, “This uncomplicated boiling strategy can ‘decontaminate’ NMPs from household tap water, potentially reducing human consumption of NMPs from drinking water,” in their published work .

Hard water, well-known for its tendency to develop limescale, or calcium carbonate , upon heating, showed greater NMP removal. The kettle’s familiar white deposits capture the microplastics as the calcium carbonate separates from the water during boiling.

The method proved effective even with softened water, which contains less calcium carbonate—approximately one-quarter of the NMPs were caught in this case. Trapped within a calcium carbonate layer, these plastic particles were then filtered out using a simple tool, such as a thin stainless steel mesh typical for tea-straining, according to the researchers.

Previous research has detected traces of various plastics like polystyrene and polyethylene in drinking water, leading to routine ingestion. To test their solution further, the researchers introduced an excess of nanoplastics, which subsequently saw a reduced presence.

As stated by the researchers, “Drinking boiled water appears to be a feasible long-term solution for diminishing worldwide NMP exposure,” despite the fact that this practice is not common globally and is mostly traditional in a few regions. [source]

The study aims to encourage the habit of water boiling prior to consumption, especially with microplastic contamination on the rise globally.

While the exact health implications of microplastic ingestion remain to be fully understood, there is increasing concern regarding its contribution to disturbance of gut microbiota and antibiotic resistance in humans.

The authors of this study express a need for further exploration into the role of boiled water in preventing the introduction of synthetic materials into our systems and mitigating the alarming impacts of microplastics.

“Our outcomes affirm a highly practical approach to minimize human NMP exposure and contribute to the groundwork for conducting broader investigations involving a much larger sample collection,” the team shares .

The research was detailed in the journal Environmental Science & Technology Letters .

FAQ Section:

Q: What are microplastics?

A: Microplastics are small plastic fragments typically less than five millimeters in size, resulting from the breakdown of larger plastic debris or from manufactured products such as microbeads in personal care items.

Q: How do microplastics end up in drinking water?

A: Microplastics enter water systems through various sources, including industrial runoff, waste water discharge, and the breakdown of larger plastics in the environment. They have been found in both tap and bottled water.

Q: Is boiling water an effective way to remove microplastics?

A: Yes, according to the study by researchers from Guangzhou Medical University and Jinan University, boiling water and then filtering it can remove a significant portion of microplastics from drinking water.

Q: Are there health risks associated with consuming microplastics?

A: The health effects of consuming microplastics are not yet fully understood, but there is concern that they can lead to changes in the gut microbiome and increased antibiotic resistance.

Q: How can the average person remove microplastics from their drinking water at home?

A: Based on the study, individuals can boil their tap water and use a household filter, such as one made of stainless steel mesh typically used for straining tea, to remove any trapped microplastics.

Conclusion:

Microplastic contamination in drinking water is a growing concern with potential health implications. However, the study from Guangzhou Medical University and Jinan University offers a practical solution for individuals looking to reduce their exposure to microplastics. By boiling and filtering their water, people can take an active step toward limiting their intake of these synthetic particles. As research continues, there is a collective hope for broader acceptance of this water purification practice and a deeper understanding of the impacts of microplastics on human health.

drinking water glass

UPitt Logo

  • open search

From the latest big breakthrough to the most influential and inspiring figures on campus to Pitt in the community, Pittwire is your official source for what’s happening now.

  • Health and Wellness
  • Technology and Science
  • Arts and Humanities
  • Community Impact
  • Diversity, Equity, and Inclusion
  • Innovation and Research
  • Our City/Our Campus
  • Pitt Magazine
  • Features & Articles
  • Accolades & Honors
  • Ones to Watch
  • Announcements and Updates
  • Life at Pitt
  • Arts & Sciences
  • Computing & Information
  • Dental Medicine
  • Engineering
  • General Studies
  • Health & Rehabilitation
  • Honors College
  • Public & Intl Affairs
  • Public Health
  • Social Work
  • COVID-19 Response
  • Sustainability

A gloved hand picks a vial from among a number of water vials.

Making batteries takes a lot of lithium. Some of it could come from wastewater.

  • Kenneth P. Dietrich School of Arts and Sciences

FPO Tower

Subscribe to Pittwire Today

Most batteries used in technology like smart watches and electric cars are made with lithium that travels across the world before even getting to manufacturers. But what if nearly half of the lithium used in the U.S. could come from Pennsylvania wastewater? 

A new analysis using compliance data from the Pennsylvania Department of Environmental Protection suggests that if it could be extracted with complete efficiency, lithium from the wastewater of Marcellus shale gas wells could supply up to 40% of the country’s demand.

Already, researchers in the lab can extract lithium from water with more than 90% efficiency according to Justin Mackey, a researcher at the National Energy Technology Laboratory and PhD student in the lab of Daniel Bain , associate professor of geology and environmental sciences in the Kenneth P. Dietrich School of Arts and Sciences.

The US Geological Survey lists lithium as a critical mineral , (although, as Mackey was quick to point out, lithium is an element, not a mineral). The designation means the U.S. government wants all lithium to be produced domestically by 2030, and so the search for sources has intensified. Currently, much of it is extracted from brine ponds in Chile. Then it’s shipped to China, where it’s processed.

There are lithium mining operations in the U.S., but, Mackey said, “This is different. This is a waste stream and we’re looking at a beneficial use of that waste.”

Finding lithium in the wastewater in Marcellus shale wasn’t a surprise: Researchers had analyzed the water recycled in hydraulic fracking and knew that it picked up minerals and elements from the shale. “But there hadn’t been enough measurements to quantify the resource,” Mackey said. We just didn’t know how much was in there.”

Thanks to Pennsylvania regulatory requirements, the research team was able to figure it out. They published their results  in the journal Scientific Reports .

Companies are required to submit analyses of wastewater used in each well pad, and lithium is one of the substances they have to report, Mackie said. “And that’s how we were able to conduct this regional analysis.”

Meeting 30% to 40% of the country’s lithium needs would bring the country much closer to the 2030 requirements. But there’s lithium-rich wastewater outside of the state’s boundaries, too. “Pennsylvania has the most robust data source for Marcellus shale,” Mackey said, “But there’s lots of activity in West Virginia, too.”

The next step toward making use of this lithium is to understand the environmental impact of extracting it and to implement a pilot facility to develop extraction techniques.

“Wastewater from oil and gas is a burgeoning issue,” Mackey said. “Right now, it’s just minimally treated and reinjected.” But it has to potential to provide a lot of value. After all, he said, “It’s been dissolving rocks for hundreds of millions of years — essentially, the water has been mining the subsurface.”

— Brandie Jefferson, photography by Aimee Obidzinski

This work was performed in support of the U.S. Department of Energy’s Fossil Energy and Carbon Management and executed through the National Energy Technology Laboratory (NETL) Research and Innovation Center’s Critical Minerals field work proposal.

Pitt is updating its Campus Master Plan

Employees, benefits open enrollment is may 1-15, pitt is launching an office of sustainability in the health sciences.

IMAGES

  1. 2 The surface water management planning process

    methodology of water plan

  2. Integrated Water Management Resource Center

    methodology of water plan

  3. Integrated Water Resource Planning

    methodology of water plan

  4. A Comprehensive Guide to Waterfall Methodology in Project Management

    methodology of water plan

  5. Planning & Execution of Water Supply Schemes

    methodology of water plan

  6. The 5 Phases of Waterfall Project Management

    methodology of water plan

COMMENTS

  1. PDF Basic Guidelines for Preparing Water Conservation Plans

    PREPARING WATER CONSERVATION PLA S. These Basic Guidelines are designed 10,000 or fewer. Some water systems, may be included in a conservation through state Section 5 of Part 1.) Systems should and guidance about capacity. Which Guidelines are appropriate also affecting water systems and their need systems with constrained water supply Guidelines.

  2. PDF Methodology for monitoring and evaluating progress in water supply

    5.2 Participatory methods (changes at community level) 5.3 Structured questionnaire for institutions 5.4 Field survey monitoring ... Water provision under GWI takes place in the context of securing the resource base and developing new or improved approaches to water management, and forms part of a larger ...

  3. Step-by-step methodology for monitoring water quality (6.3.2)

    The step-by-step methodology for 6.3.2 explains how to monitor the proportion of bodies of water with good ambient water quality, including definitions, computational steps, and recommendations on spatial and temporal resolutions. UN Environment is the custodian agency of indicator 6.3.2, and they have developed this methodology in a ...

  4. Water Resources Planning and Management: An Overview

    Water resources plans need to be periodically updated and adapt to new information, new objectives , and updated forecasts of future demands, costs , and benefits. ... Dynamic adaptive policy pathways: A method for crafting robust decisions for a deeply uncertain world. Global Environmental Change, 23, 485-498. Article Google Scholar ...

  5. Step-by-step methodology for monitoring drinking water and sanitation

    6.1.1 Step-by-step methodology for monitoring drinking water and sanitation English. Target 6.1 is: "By 2030, achieve universal and equitable access to safe and affordable drinking water for all .". Indicator 6.1.1 monitors the proportion of population using safely managed drinking water services. A safely managed service is defined as an ...

  6. PDF Guidance for Quality Assurance Project Plans for Water Quality Modeling

    the data and/or calculation method for estimating source contributions to receiving waters. D. Data Availability and Quality This section describes the available data for the project, the organizations that collected the data, and quality assurance of the data. For water quality modeling, general categories of data commonly include:

  7. Approaches to Planning Water Resources

    Water resources planning is an ancient problem, dating back to flood control and water supply activities of the earliest civilizations. The success of most civilizations has rested, in part, on their ability to manage water (China, Indus, Europe, South and Central America) (Mithen 2012).The demise of several civilizations has been traced directly to failed regional water management (Peru ...

  8. Water Planning

    Water planning and management refer to capabilities within the city to manage and plan water systems. This capability requires an understanding of all of the parts of the system to ensure these work together to maintain sustainable water supplies in the city. ... The methodology combined the photo interpretation on the urban areas of an ortho ...

  9. Awareness, adoption and implementation of the water safety plan

    The water safety plan (WSP) methodology is one of the most effective ways to systematically guarantee the safety of drinking water . The methodology recommends a preventive risk management approach that incorporates system assessment, operational monitoring, and the development of improved management plans. ...

  10. PDF Guidance and Methodology for Reporting on Water Conservation ...

    Conservation Advisory Council, to develop a uniform, consistent methodology for calculating water use and a guidance document for reporting on water conservation. Municipalities or water utilities are to use them in their efforts to develop water conservation plans and prepare annual reports and five-year implementation reports.

  11. Water Treatment

    Water treatment differs by community. Water may be treated differently in different communities depending on the quality of the source water that enters the treatment plant. The water that enters the treatment plant is most often either surface water or ground water.Surface water typically requires more treatment and filtration than ground water because lakes, rivers, and streams contain more ...

  12. Water scarcity management: part 1: Methodological framework

    The methodological fr amework. consists of procedures, including database development, climate variability and. modelling, water quantity and quality modelling, a summary of h ierarchical. drought ...

  13. PDF Watershed Management Plan 2021-2031

    General-purpose unit of government approach to water. Has a major funding role with Soil and Water Conservation Districts. Administers shoreland and land use regulations that guide property development. Manages the local water plan by identifying problems and providing for development. Regulates wetlands, manages large tracts of public lands. Local

  14. How to Plan and Prepare for Water Supply Projects?

    A contour plan is essential as it shows the location of the water main, sub-mains, valves, branches, hydrants, pumping stations, etc. Sometimes, the contour plan and the site plan are combined to form one plan. 3.4 Flow Diagrams. The flow diagram includes the line plan and section and also shows the sequence of operations. 3.5 Detailed Drawing

  15. Appendix XX

    of the regional Metro Area Water Supply Plan update. The memorandum describes the use of region-wide water demand projections and details of the proposed approach. Use of region-wide water demand projections The Metropolitan Council estimated a likely range of future water demand to support the update of the Metro Area Water Supply Plan.

  16. Water safety plans by utilities: A review of research on implementation

    Highlights. •. Water safety plans (WSPs) are an important public policy tool to assure the continuous improvement of water quality. •. Lessons from WSPs around the world provide us with a better understanding of the application of this risk assessment methodology to water utilities. •.

  17. DWS: National Water and Sanitation Master Plan

    PROJECT BACKGROUND. The Department of Water and Sanitation (DWS) embarked on, and is leading the initiative to develop the master plan, which is a plan intended to guide the water sector with investment planning for the development of water resources and the delivery of water and sanitation services over the horizon until 2030, and beyond.

  18. Waterfall Methodology: The Ultimate Guide to the Waterfall Model

    The waterfall methodology is a linear project management approach, where stakeholder and customer requirements are gathered at the beginning of the project, and then a sequential project plan is created to accommodate those requirements. The waterfall model is so named because each phase of the project cascades into the next, following steadily ...

  19. PDF Methods for Evaluating Wetland Condition: Study Design for Monitoring

    Water Quality Inventory 1998 Report to Congress" (U.S. EPA 1998). This module is intended to pro-vide guidance to State and Tribal water quality man-agers on designing wetland monitoring programs to be included as a part of their routine water quality sampling. Most States and Tribes will need to begin wet-

  20. What is Waterfall Methodology?

    Waterfall Methodology Definition. The Waterfall approach was established in 1970 by Winston w. Royce. It contains five phases of management, where each requires a deliverable from the previous ...

  21. Water

    The methodology for producing maps for the spatial analysis of water quality involved a few steps in the ArcGIS software (version 10.3). Firstly, the water quality indices calculated for various sampling points across the study area were prepared. The data points were then georeferenced using geographical positioning system (GPS) coordinates.

  22. PDF Part 5

    Phased Water Conservation Plan are no longer in effect or that the severity of the water supply condition may be reduced to a Phase I or Phase II shortage. 5-B-1d Existing meters providing construction water service shall be removed. 5-B-1e No new permanent meters shall be installed.

  23. Captured stormwater boosts Los Angeles County's reserves

    The L.A. County Board of Supervisors has adopted the county's first water plan, which outlines how the region must stop importing 60% of its water by 2045. Dec. 6, 2023.

  24. How Long Does a Water Heater Last? And How to Know When to Replace It

    Plan Ahead Before Replacing a Water Heater. Learning the expected lifespan for a water heater is important for planning the replacement of the unit. Don't wait too long to budget for this ...

  25. Step-by-step methodology for monitoring integrated water resources

    The step-by-step methodology for 6.5.1 explains how to monitor the degree of integrated water resources management implementation (0-100), including definitions, computational steps, and recommendations on spatial and temporal resolutions. UN Environment is the custodian agency of indicator 6.5.1, and they have developed this methodology in a ...

  26. Mall of America water park plan prompts climate change concerns

    The vision for the new water park at the Mall of America features colorful swirling slides, a wave pool, a lazy river and a retractable roof.. Members of the Sustainability Commission in ...

  27. A Simple Technique for Removing Microplastics from Drinking Water ...

    The kettle's familiar white deposits capture the microplastics as the calcium carbonate separates from the water during boiling. The method proved effective even with softened water, which ...

  28. Making batteries takes a lot of lithium. Some of it could come from

    Already, researchers in the lab can extract lithium from water with more than 90% efficiency according to Justin Mackey, a researcher at the National Energy Technology Laboratory and PhD student in the lab of Daniel Bain, associate professor of geology and environmental sciences in the Kenneth P. Dietrich School of Arts and Sciences.